Deploying our avalon hydro rack in an indoor 1-to-5 configuration allowed a facility in Southeast Asia to scale a 100-unit Avalon A1566HA cluster. With warehouse floor space at a premium, the site operator wanted to expand computing density without cluttering the aisle with multiple separate pump skids. We supplied five 20-slot racks driven by a single 1MW centralized pumping loop.

The mechanical layout centers on a high-flow CDU linked to the five racks through curved stainless jumper lines. Beside the plumbing sits a standalone electrical cabinet housing all breakers, meters, and switchgear. Keeping high-voltage circuits physically isolated from the fluid lines provides a safer workspace for technicians during daily electrical checks.

The 100-miner Avalon facility reached full operation in three weeks. The centralized CDU maintains steady, identical water pressure across all five racks, eliminating pressure drop across the entire 100-machine line and giving the on-site crew a clean, organized layout that easily handles 2U hardware.

About Ada

I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization.