Project Description

Our avalon hydro cooling container enabled an industrial-scale Bitcoin mining facility in Dallas, United States, to energize a high-capacity 2.4MW computing block. Designed to handle 240 units of Avalon A1566HA 2U miners in a standardized 40HQ form factor, the deployment resolved persistent substation grid stability and regional thermal dissipation challenges.

Each 240-slot enclosure features a walk-in C-class datacenter layout with acoustic insulation, dual internal maintenance corridors, and high-flow secondary hydraulic loops. Quick-connect dry cooling connections allowed the installation team to drop the 40-foot box onto reinforced concrete foundations and finalize electrical tie-ins within forty-eight hours.

Operating continuously under high summer load, the 2.4MW facility maintains 99.8% uptime with a measured 1.04 PUE. Liquid heat extraction directly over the A1566HA hashboards eliminated server thermal throttling, delivering near-silent operation and stable utility-scale hash output across all 240 Avalon miners.

About Ada

I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization.