Five 308-Slot Bitmain ANTSPACE HD5 Containers in Texas

Posted by Ada · On

Five 308-Slot Bitmain ANTSPACE HD5 Containers in Texas

Project Description

Deploying the bitmain antspace hd5 allowed an energy group in Texas to build a 7.5MW gas-to-hash mining facility. Situated directly beside natural gas wells, the site runs on behind-the-meter generator power independent of the local grid. We delivered 5 units of the 1.5MW 40HQ model to house up to 1,540 Antminer hydro machines.

Each 308-slot container features an integrated rooftop dry cooler, eliminating water supply logistics on rural oilfield terrain. Crews set the 40-foot enclosures on concrete piers, routing heavy power cables through gravel-level trays to adjacent natural gas gensets. The sealed closed loop prevents fine windblown dust and grit from reaching the internal server racks.

Running directly on behind-the-meter gas generation cut site electricity costs by over sixty percent compared to retail utility rates. The five-container installation operates at an uninterrupted 99.8% base load, keeping continuous 7.5MW thermal dissipation stable while eliminating the water supply overhead typical of standard desert mining installations.

About Ada

I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization.