Five 308-Slot Bitmain ANTSPACE HD5 Containers in Texas

Project Description
Deploying the bitmain antspace hd5 allowed an energy group in Texas to build a 7.5MW gas-to-hash mining facility. Situated directly beside natural gas wells, the site runs on behind-the-meter generator power independent of the local grid. We delivered 5 units of the 1.5MW 40HQ model to house up to 1,540 Antminer hydro machines.
Each 308-slot container features an integrated rooftop dry cooler, eliminating water supply logistics on rural oilfield terrain. Crews set the 40-foot enclosures on concrete piers, routing heavy power cables through gravel-level trays to adjacent natural gas gensets. The sealed closed loop prevents fine windblown dust and grit from reaching the internal server racks.
Running directly on behind-the-meter gas generation cut site electricity costs by over sixty percent compared to retail utility rates. The five-container installation operates at an uninterrupted 99.8% base load, keeping continuous 7.5MW thermal dissipation stable while eliminating the water supply overhead typical of standard desert mining installations.