150KW–3MW INDUSTRIAL

1-to-6 Setup: 20-Slot Hydro Mining Cabinet in Utah

Posted by Ada · On

1-to-6 Setup: 20-Slot Hydro Mining Cabinet in Utah

Project Description

Running miners in Utah’s high-altitude desert brings a tough hurdle: water is scarce and expensive, ruling out evaporative cooling towers. Looking to expand indoors without continuous water supplies, the team set up 6 units of our 20-Slot 110kW Antminer Water Cooling Cabinet. Each hydro mining cabinet fits 20 machines into a slim vertical frame.

The site uses an economical 1-to-6 setup: one high-flow outdoor dry cooler feeds all six indoor racks through central stainless manifolds. A customized CDU balances fluid pressure across the 660kW cluster. Because the closed loop circulates without evaporation, the facility runs completely waterless with no need for municipal water lines.

Even when outdoor temperatures topped 38°C (100°F) in July, the dry cooler kept supply fluid steady at 34°C across the 120 miners. Daily maintenance takes just a quick check on the CDU pressure gauges, with no water top-offs or loop refills needed.

About Ada

I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization.