Project Description

A European investment firm contacted us with available power at a geothermal plant near Reykjavik, planning to build a zero-emission mining site. The project required specific technical adjustments due to the cold, high-humidity coastal climate and sulfur gases from the nearby geothermal plant.

For the client, we prepared a 5-container site, installed 2,100 ASIC units, and built the complete engineering infrastructure using our 2.4MW 420-Slot Antminer Hydro Cooling Container 40FT HQ. The setup included anti-corrosive marine paint, sealed closed-loop dry coolers, and factory-integrated fiber networking to protect the ASIC liquid cooling container systems from damp maritime air.

From equipment delivery to final electrical commissioning, the project took 4 months to complete. The facility was energized in 2024 and has been running stably at full capacity. Low-cost geothermal power and zero water costs ensure an estimated payback period of 18–20 months, proving that mid-to-large-scale liquid mining is highly profitable even in remote, harsh environments.

About Ada

I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization.