Project Description

An institutional mining group in Edmonton, Alberta, contracted us to build a 28.8MW facility for their Antminer hydro fleet. We supplied 12 units of our 2.4MW 420-Slot Antminer Hydro Cooling Container 40FT HQ, establishing a 5,040-miner campus. Built with reinforced steel and fireproof insulation, each modular bitcoin mining container handles continuous 2,400kW thermal loads.

Crane crews rigged each unit onto concrete footings beside dedicated dry cooler banks. Because the containers included factory-installed Bitmain cabling, Gigabit fiber, and auto-reclosing breakers for utility grid protection, electrical work was limited to landing transformer feeds. Piping and hydrostatic pressure testing across all 12 units finished in seven weeks.

Running under a sustained 28.8MW draw, the redundant water loops maintain inlet temperatures below 35°C across all 5,040 active ASICs. The oversized stainless manifolds eliminate flow friction, holding the plant’s operating PUE at 1.03 with zero chip throttling during continuous peak production.

About Ada

I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization.