Securing a direct 25.2MW tap from a renewable substation outside Addis Ababa, an overseas investment group needed rapid infrastructure to utilize Ethiopia’s low-cost hydropower. Because regional supply chains for high-voltage electrical switchgear are limited, we delivered 12 units of our 2.1MW 364-Slot Antminer Hydro Cooling Container 40FT HQ, providing a complete turnkey bitcoin mining infrastructure housing 4,368 miners.

At an elevation exceeding 2,300 meters, thinner air reduces natural heat convection. We compensated by integrating oversized closed-loop dry coolers and mounting overhead green shade netting to block intense equatorial solar radiation. Factory pre-wiring allowed our engineers to bypass local equipment shortages, completing substation busbar connections, transformer landings, and primary water loop testing in ten weeks.

The 25.2MW facility runs at continuous capacity on 100% clean hydroelectric power. Supply coolant remains safely below 36°C even during peak midday sun, maintaining an operating PUE of 1.038 across all 4,368 Antminer hydro ASICs without high-altitude thermal derating.

About Ada

I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization.