Bitmain ANTSPACE HD5 308-Slot 1.5MW 40HQ Hydro Cooling Container

This 40ft hydro mining container supports up to 308 ANTSPACE HD5 compatible units for efficient hydro cooling, delivering a high-performance Bitcoin mining solution with 1.5MW capacity.

$76,000.00

In stock

Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.

Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.

Trusted by

  • Apexto Mining reviews on Trustpilot
  • WhatToMine
  • Kryptex
  • NiceHash

Payment Method

  • USD
  • USDT(TRC 20)
  • KAS
  • BTC
  • ETH
  • LTC
  • DOGE
  • USDC(ERC20)

ANTSPACE HD5 308-Slot 1.5MW Hydro Cooling Container

CONTAINER CAPACITY

ASIC MINERS

308 UNITS

Housed at full load

TOTAL POWER

1,500 KW

Continuous electrical load

POWER INPUT

400V

Rated Voltage

COOLING

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 8 more models

Product Description

Engineered for cool or water restricted regions globally, the 1.5MW 308-Slot Bitmain ANTSPACE HD5 Hydro Container 40FT HQ is packaged directly with an advanced dry cooler to achieve near zero water consumption.

This standard 40 foot infrastructure represents an engineered shift in the ANTSPACE series, utilizing two independent A/B liquid cooling loops that share a central control cabinet but operate separately. Designed to support 308 S19, S21, or S23 hydro miners, this robust multi loop architecture secures stable 1512kW loads.

By eliminating single loop vulnerabilities and water replenishment dependency, the HD5 ensures highly reliable, long term BTC mining performance in arid desert climates.

Core Advantages

Near-Zero Water Consumption

Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.

Standardized 308-Slot Density

Packs three hundred eight Antminer Hydro slots into standard forty foot frames, maximizing hashing density per pad compared to traditional containers for large scale project sites.

Optimized Substation Layout

Designed for highly optimized substation layouts, allowing one standard thirty seven hundred fifty kVA transformer to comfortably feed exactly two containers, lowering total CapEx.

Full Multi-Standard Certification

Certified with UL 508A, CSA, CE, and NFPA 79 standards, ensuring full international compliance, legal power grid connection, and secure, reliable operations for global projects.

Dual A/B Independent Loops

Features two independent A/B hydraulic loops sharing a central control cabinet, allowing one loop to still keep hashing during single pump maintenance without container shutdowns.

Record-Low 1.021 PUE

Achieves a standard 1.021 PUE, spending only two percent input power on cooling overhead and saving up to twenty percent of operational electricity over standard air cooled sites.

Near-Zero Water Consumption

Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.

Standardized 308-Slot Density

Packs three hundred eight Antminer Hydro slots into standard forty foot frames, maximizing hashing density per pad compared to traditional containers for large scale project sites.

Optimized Substation Layout

Designed for highly optimized substation layouts, allowing one standard thirty seven hundred fifty kVA transformer to comfortably feed exactly two containers, lowering total CapEx.

Full Multi-Standard Certification

Certified with UL 508A, CSA, CE, and NFPA 79 standards, ensuring full international compliance, legal power grid connection, and secure, reliable operations for global projects.

Dual A/B Independent Loops

Features two independent A/B hydraulic loops sharing a central control cabinet, allowing one loop to still keep hashing during single pump maintenance without container shutdowns.

Record-Low 1.021 PUE

Achieves a standard 1.021 PUE, spending only two percent input power on cooling overhead and saving up to twenty percent of operational electricity over standard air cooled sites.

Near-Zero Water Consumption

Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.

Standardized 308-Slot Density

Packs three hundred eight Antminer Hydro slots into standard forty foot frames, maximizing hashing density per pad compared to traditional containers for large scale project sites.

Full Specifications

External dimensions

L:12192mm、W:2438mm、H:2896mm

Internal dimensions

L:12000mm、W:2230mm、H:2660mm

Weight

11000 KG

ModelANTSPACE HD5Installed capacity308 Rack Space
Main Switch Capacity of Power Distribution Cabinet1200×4 ARated Power1512 kW
Maximum Supported Input Current700×4 AMaximum Supported Input Power1765 kW
Maximum Current per Miner Slot10 AHeat Dissipation Capacity1500 kW
Supply Liquid Temperature35±1℃ @ 30℃ ambientFlow rate 1(1-2)67.2 m³/h
Flow rate 2(1-3)73.9 m³/hPUE1.021 @25 ˚C ambient temperature
Safety CertificationNFPA 79:2021 UL 508A:2018 R8.21 CSA C22.2 No. 14-18 ANSI/ISO 12100:2012 IEC 60204 Ed 5.1 2009Input Voltage and Frequency400 V±5%, 50/60 Hz
Ambient Temperature-40~50 ℃Ambient Humidity10%~90% RH
Altitude converter≤2000 M

308-Slot Antminer Hydro Cooling Container Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your HD5 deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × HD5 Container

2550 kVA Three-Phase Pad-Mounted Transformer

View 2550 kVA Transformer →

1500 kVA Pad Mount Three-Phase Transformer

For 2 × HD5 Containers

3750 kVA Three-Phase Pad-Mounted Transformer

View 3750 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

210-Slot Antminer Hydro Cooling Container

1.2 MW
210 Slots
1,2192 × 2,438 × 2,896 mm
Commercial-Scale Mining

Compare

308-Slot Antminer Hydro Cooling Container

1.5 MW
308 Slots
1,2192 × 2,438 × 2,896 mm
Mid-to-Large Operations

420-Slot Antminer Hydro Cooling Container

2 MW
420 Slots
1,2192 × 2,438 × 2,896 mm
Industrial-Scale Projects

480-Slot Antminer Hydro Cooling Container

2.6 MW
480 Slots
1,2192 × 2,438 × 2,896 mm
Mega-Scale Mining Facilities

Real Results from Real Miners

View All >>

1.7MW 308 Slot antminer Hydro cooling Container Deployment Case Study
Phoenix, United States

12 x 1.5 MW Hydro Project

Sustaining stable water-free operations across highly arid desert terrains.

+30%

Footprint Efficiency

-20%

Cooling Power Draw

$1.1M

Annual Savings

View All >>

1.7MW 308 Slot Antminer Hydro Mining Container Deployment Case Study
Texas, United States

5 x 1.5 MW Hydro Project

Delivering stable, ultra-low-cost hydro mining powered by behind-the-meter natural gas generators on a private site.

-65%

Power Cost

-40%

Setup Duration

99.8%

Off-Grid Uptime

View All >>

“

"Our site in Phoenix has strict water regulations, so HD5’s closed-loop dry cooler was essential. It achieved zero water consumption while keeping our S21 Hydro units running cool."

— VP of Operations, Phoenix Mining Site, USA

"Deploying 5 HD5 containers on our own site directly paired with natural gas gensets cut our power costs by over 60%. The closed-loop hydro design is completely immune to rural dust and outdoor heat, allowing our generators and Antminers to run at an uninterrupted 99.8% base load."

— Managing Partner, Texas Gas-to-Hash Facility, USA

Global Deployment

1.2+ GW

Cumulative delivered cooling capacity

Serving Mining Sites

50+

Countries and regions covered

308-Slot ANTSPACE HD5 Hydro Container FAQs

Is the Antminer HD5 different from the previous-generation HK3 container?

Yes. The older HK3 is a single loop container hosting two hundred ten miners. The upgraded HD5 features two independent A/B loops, accommodating three hundred eight high density server slots.

What are the primary advantages of choosing the HD5 dry-cooling package over the HW5 wet container?

The HW5 wet tower consumes up to eleven thousand cubic meters of water annually. The HD5 dry cooler package utilizes a closed loop, achieving near zero water consumption in arid climates.

How does the PUE of the dry-cooling HD5 compare to the wet-cooling HW5?

The HD5 PUE is 1.021, while HW5 is slightly lower at 1.017. Both deliver highly optimized power efficiency, meaning water availability and local climate will be the deciding factor between them.

Is the system suitable for desert deployment, and how does it handle extreme environments?

Yes. Arid desert climates are its standard operating environment, provided summer temperatures stay under forty degrees Celsius. The dual A/B loop design offers flexible maintenance options to safeguard daily continuous operations.

What is the operational noise level of the water-cooled system, and is it suitable for municipal compliance?

The system operates under seventy five decibels at fifteen meters. Using variable speed fans on the dry tower, it minimizes low frequency wind noise, helping you easily comply with strict local municipal environmental standards.

How is this dry cooler package shipped, and does it support instant plug-and-play setup?

Yes. Bundled directly with its dry cooler, the certified container ships as a standard ISO unit. Arriving prewired, it allows for instant, turnkey setup and avoids weeks of costly onsite reassembly.

Can the fully assembled container and cooling tower be shipped directly as a single piece internationally?

es. Carrying standard CSC certification, the assembled container is a legal ISO shipping unit. It moves seamlessly by vessel, rail, or truck without recrating, saving weeks of costly on site reassembly.

ANTSPACE HD5 308-Slot 1.5MW Hydro Cooling Container

CONTAINER CAPACITY

Housed at full load
308 UNITS
Continuous electrical load
1,500 KW
Rated Voltage
400V

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 8 more models

Product Description

Engineered for cool or water restricted regions globally, the 1.5MW 308-Slot Bitmain ANTSPACE HD5 Hydro Container 40FT HQ is packaged directly with an advanced dry cooler to achieve near zero water consumption.

This standard 40 foot infrastructure represents an engineered shift in the ANTSPACE series, utilizing two independent A/B liquid cooling loops that share a central control cabinet but operate separately. Designed to support 308 S19, S21, or S23 hydro miners, this robust multi loop architecture secures stable 1512kW loads.

By eliminating single loop vulnerabilities and water replenishment dependency, the HD5 ensures highly reliable, long term BTC mining performance in arid desert climates.

Core Advantages

Near-Zero Water Consumption

Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.

Standardized 308-Slot Density

Packs three hundred eight Antminer Hydro slots into standard forty foot frames, maximizing hashing density per pad compared to traditional containers for large scale project sites.

Optimized Substation Layout

Designed for highly optimized substation layouts, allowing one standard thirty seven hundred fifty kVA transformer to comfortably feed exactly two containers, lowering total CapEx.

Full Multi-Standard Certification

Certified with UL 508A, CSA, CE, and NFPA 79 standards, ensuring full international compliance, legal power grid connection, and secure, reliable operations for global projects.

Dual A/B Independent Loops

Features two independent A/B hydraulic loops sharing a central control cabinet, allowing one loop to still keep hashing during single pump maintenance without container shutdowns.

Record-Low 1.021 PUE

Achieves a standard 1.021 PUE, spending only two percent input power on cooling overhead and saving up to twenty percent of operational electricity over standard air cooled sites.

Near-Zero Water Consumption

Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.

Standardized 308-Slot Density

Packs three hundred eight Antminer Hydro slots into standard forty foot frames, maximizing hashing density per pad compared to traditional containers for large scale project sites.

Optimized Substation Layout

Designed for highly optimized substation layouts, allowing one standard thirty seven hundred fifty kVA transformer to comfortably feed exactly two containers, lowering total CapEx.

Full Multi-Standard Certification

Certified with UL 508A, CSA, CE, and NFPA 79 standards, ensuring full international compliance, legal power grid connection, and secure, reliable operations for global projects.

Dual A/B Independent Loops

Features two independent A/B hydraulic loops sharing a central control cabinet, allowing one loop to still keep hashing during single pump maintenance without container shutdowns.

Record-Low 1.021 PUE

Achieves a standard 1.021 PUE, spending only two percent input power on cooling overhead and saving up to twenty percent of operational electricity over standard air cooled sites.

Near-Zero Water Consumption

Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.

Standardized 308-Slot Density

Packs three hundred eight Antminer Hydro slots into standard forty foot frames, maximizing hashing density per pad compared to traditional containers for large scale project sites.

Full Specifications

External dimensions

L:12192mm、W:2438mm、H:2896mm

Internal dimensions

L:12000mm、W:2230mm、H:2660mm

Weight

11000 KG

ModelANTSPACE HD5Installed capacity308 Rack Space
Main Switch Capacity of Power Distribution Cabinet1200×4 ARated Power1512 kW
Maximum Supported Input Current700×4 AMaximum Supported Input Power1765 kW
Maximum Current per Miner Slot10 AHeat Dissipation Capacity1500 kW
Supply Liquid Temperature35±1℃ @ 30℃ ambientFlow rate 1(1-2)67.2 m³/h
Flow rate 2(1-3)73.9 m³/hPUE1.021 @25 ˚C ambient temperature
Safety CertificationNFPA 79:2021 UL 508A:2018 R8.21 CSA C22.2 No. 14-18 ANSI/ISO 12100:2012 IEC 60204 Ed 5.1 2009Input Voltage and Frequency400 V±5%, 50/60 Hz
Ambient Temperature-40~50 ℃Ambient Humidity10%~90% RH
Altitude converter≤2000 M

308-Slot Antminer Hydro Cooling Container Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your HD5 deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × HD5 Container

2550 kVA Three-Phase Pad-Mounted Transformer

View 2550 kVA Transformer →

1500 kVA Pad Mount Three-Phase Transformer

For 2 × HD5 Containers

3750 kVA Three-Phase Pad-Mounted Transformer

View 3750 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

210-Slot Antminer Hydro Cooling Container

1.2 MW
210 Slots
1,2192 × 2,438 × 2,896 mm
Commercial-Scale Mining

Compare

308-Slot Antminer Hydro Cooling Container

1.5 MW
308 Slots
1,2192 × 2,438 × 2,896 mm
Mid-to-Large Operations

420-Slot Antminer Hydro Cooling Container

2 MW
420 Slots
1,2192 × 2,438 × 2,896 mm
Industrial-Scale Projects

480-Slot Antminer Hydro Cooling Container

2.6 MW
480 Slots
1,2192 × 2,438 × 2,896 mm
Mega-Scale Mining Facilities

Real Results from Real Miners

View All >>

1.7MW 308 Slot antminer Hydro cooling Container Deployment Case Study

12 x 1.5 MW Hydro Project

Sustaining stable water-free operations across highly arid desert terrains.

+30%

Footprint Efficiency

-20%

Cooling Power Draw

$1.1M

Annual Savings

View All >>

1.7MW 308 Slot Antminer Hydro Mining Container Deployment Case Study

5 x 1.5 MW Hydro Project

Delivering stable, ultra-low-cost hydro mining powered by behind-the-meter natural gas generators on a private site.

-65%

Power Cost

-40%

Setup Duration

99.8%

Off-Grid Uptime

View All >>

“

"Our site in Phoenix has strict water regulations, so HD5’s closed-loop dry cooler was essential. It achieved zero water consumption while keeping our S21 Hydro units running cool."

— VP of Operations, Phoenix Mining Site, USA

"Deploying 5 HD5 containers on our own site directly paired with natural gas gensets cut our power costs by over 60%. The closed-loop hydro design is completely immune to rural dust and outdoor heat, allowing our generators and Antminers to run at an uninterrupted 99.8% base load."

— Managing Partner, Texas Gas-to-Hash Facility, USA

1.2+ GW

Cumulative delivered cooling capacity

50+

Countries and regions covered

308-Slot ANTSPACE HD5 Hydro Container FAQs

Yes. The older HK3 is a single loop container hosting two hundred ten miners. The upgraded HD5 features two independent A/B loops, accommodating three hundred eight high density server slots.

The HD5 PUE is 1.021, while HW5 is slightly lower at 1.017. Both deliver highly optimized power efficiency, meaning water availability and local climate will be the deciding factor between them.

Yes. Arid desert climates are its standard operating environment, provided summer temperatures stay under forty degrees Celsius. The dual A/B loop design offers flexible maintenance options to safeguard daily continuous operations.

The system operates under seventy five decibels at fifteen meters. Using variable speed fans on the dry tower, it minimizes low frequency wind noise, helping you easily comply with strict local municipal environmental standards.

es. Carrying standard CSC certification, the assembled container is a legal ISO shipping unit. It moves seamlessly by vessel, rail, or truck without recrating, saving weeks of costly on site reassembly.

Customize Your Hydro Cooling Solution

Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.

Project Timeline

In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.

Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.

Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.

International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.

*All sales are final and non-refundable. Please understand, this is an industry standard.

Recommended Devices