1.2MW 210-Slot Antminer Hydro Mining Container (20HQ)

SKU: AP-HC20-A210

A 1.2MW 20ft hydro cooling container supporting up to 210 Antminer hydro miners, featuring advanced water-cooling for stable, high-performance mining.

$60,800.00 – $80,500.00

In stock

Specification:

Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.

Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.

Trusted by

  • Apexto Mining reviews on Trustpilot
  • WhatToMine
  • Kryptex
  • NiceHash

Payment Method

  • USD
  • USDT(TRC 20)
  • KAS
  • BTC
  • ETH
  • LTC
  • DOGE
  • USDC(ERC20)

210-Slot Split-Type Flexible Modular Hydro Cooling Solution

CONTAINER CAPACITY

ASIC MINERS

210 UNITS

Housed at full load

TOTAL POWER

1200 KW

Continuous electrical load

FORM FACTOR

Custom

Standard

COOLING

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 1 more models

Product Description

The 1.2MW 210-Slot Split-Type Antminer Hydro Mining Container 20FT HQ is a premier liquid cooling solution engineered for high-density Bitcoin mining in crypto mining farms.

Featuring an integrated power distribution system and water circulation control in a compact frame, its split design separates external water cooling units from the chassis to minimize physical footprint.

This modular architecture is ideal for irregular mining farm layouts and allows customizable heat dissipation using dry coolers or cooling towers. Crucially, it excels in long-term scalability, enabling operators to easily upgrade or expand liquid cooling components as BTC mining capacity grows without modifying the core ASIC miner container.

Core Advantages

01. Integrated All-in-One System

Integrates the rack, CDU, power cabinet, and control unit into one container for rapid, plug-and-play deployment.

02. Redundant Dual-Loop Cooling

Features dual loops, dual CDUs, and multi-channel power to ensure continuous, reliable cooling during partial power outages.

03. Individual Power Switches

Equips each miner with an individual switch, enabling safe maintenance on single units without interrupting operations.

04. Leak Detection System

Uses moisture-sensing ropes to instantly detect coolant leaks and trigger alarms, preventing damage and ensuring safety.

05. Premium Engineering Details

Features supplier-certified aviation plugs, reinforced grid panels, and durable 304 stainless steel manifolds with ball valves.

06. Intelligent Management System

Monitors flow rate, pressure, and temperature via multi-sensor arrays, enabling real-time remote control and mobile/PC alerts.

Full Specifications

External dimensions

L:6058mm、W:2438mm、H:2896mm

Internal dimensions

L:5860mm、W:2348mm、H:2720mm

Weight

4980KG

ModelAP-HC20-A210Installed capacity210 seat
Installed powerload1155 KWPower of the light-duty vertical multistage pump30 kW
Power of the fluid replenishing pump0.2 KWTotal power of the dry cooling tower fan49.8 KW
Total power of the closed cooling tower fan16.5 KWTotal power of the closed cooling tower spray pump4 KW
System pipeline pressure0.2-0.4 MPAOperating temperature range of the system22-42 ℃
Coolant circulation demand of a single machine≥0.5 m³/hTotal demand for circulating coolant within the system≥2.2 m³
Molded Case Circuit Breaker125 AResidual Current Circuit Breaker630 A
Contactor9 AIntermediate relay24 V
CUL certified frequency converter380 V

210-Slot 20FT Antminer Hydro Cooling Container Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your container deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × Container

1500 kVA Three-Phase Pad-Mounted Transformer

View 1500 kVA Transformer →

3000 kVA Pad Mount Three-Phase Transformer

For 2 × Containers

3000 kVA Three-Phase Pad-Mounted Transformer

View 3000 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

Compare

210-Slot 20FT Antminer Hydro Container

1.2 MW
210 Slots
6058 × 2438 × 2896 mm
Flexible Space & Modular Layouts

210-Slot 40FT Antminer Hydro Container

1.2 MW
210 Slots
12192× 2438 × 2896 mm
Turnkey Commercial Mining

308-Slot Antminer Hydro Container

1.7 MW
308 Slots
12192 × 2438 × 2896 mm
Industrial-Scale Operations

420-Slot Antminer Hydro Container

2.4 MW
420 Slots
12192 × 2438 × 2896 mm
Mega-Scale Mining Facilities

Real Results from Real Miners

View All >>

Apexto Abu Dhabi, United Arab Emirates 12 x 1.2MW Hydro Project
Abu Dhabi, United Arab Emirates

12 x 1.2MW Hydro Project

Achieving water-free sustainable mining in dry desert climates.

+28%

Efficiency Gain

-23%

Energy Cost

1.2M USD

Energy Cost

View All >>

Apexto Calgary, Canada 8 x 1.2MW Hydro Project
Calgary, Canada

8 x 1.2MW Hydro Project

Sustaining consistent thermal performance during freezing winter seasons.

+100%

On-Time Startup

-25%

Setup Time

99.8%

System Reliability

View All >>

“

"Abu Dhabi’s strict water regulations prohibited wet cooling towers. This modular split container allowed us to deploy dry coolers easily, ensuring compliant, highly efficient operations in the desert."

— VP of Infrastructure, Abu Dhabi Green Mining

"Operating in the freezing winters of Calgary was our biggest concern, but this split system handled the cold climate smoothly. It kept our chip temperatures highly balanced and stable throughout the season."

— O&M Director, Calgary Mining Site, Canada

Global Deployment

1.2+ GW

Cumulative delivered cooling capacity

Serving Mining Sites

50+

Countries and regions covered

210-Slot Antminer Hydro Cooling Container FAQs

Can this 20FT container support up to 210 Antminer Hydro miners?

Yes. The container provides 210 dedicated miner positions and is designed as a 1.2MW-class Hydro mining system for compatible Antminer Hydro miners.

The final full-load configuration is matched to the exact miner model and operating power before deployment, ensuring the total electrical and cooling load remains within the system design capacity.

Why choose a split-type 20FT container instead of a fully integrated cooling container?

The split design keeps the mining racks, power distribution, CDU, and controls inside the compact 20FT container while placing the final heat-rejection equipment outside.

This reduces the main container footprint and gives operators more freedom to position dry coolers or cooling towers according to the actual site layout. It also makes future cooling upgrades easier without rebuilding the miner container.

What should be prepared on site before the container arrives?

The main requirements are sufficient 380–415V three-phase electrical capacity, a suitable foundation for the container and external cooling equipment, clear routing for cooling pipes and electrical connections, and network access for system monitoring.

Planning these items before delivery helps reduce on-site construction work and speeds up commissioning.

What happens if one cooling loop or pump has a problem?

The system uses dual cooling loops, dual CDUs, and multi-channel power architecture to provide cooling redundancy.

This design reduces the risk that a single cooling-side failure will stop the entire 210-miner deployment and improves serviceability for continuous mining operations.

Can one miner be serviced without shutting down the entire container?

Yes. Each miner position has an individual power switch, allowing a single miner to be powered down for inspection, replacement, or maintenance without stopping the other operating miners.

This is especially important in a 210-miner container because routine miner maintenance does not need to become container-wide downtime.

How does the system detect and respond to coolant leaks?

Moisture-sensing ropes are installed to detect coolant leakage and trigger an alarm when abnormal moisture is detected.

The intelligent control system also monitors coolant flow, pressure, and temperature, allowing operators to identify cooling abnormalities remotely before they develop into larger system problems.

Does a 1.2MW mining container mean the site only needs 1.2MW of electrical capacity?

No. Site electrical planning should include the miner load plus the cooling and auxiliary equipment.

The container uses circulation pumps, controls, and external heat-rejection equipment. Auxiliary power requirements also differ between dry-cooler and cooling-tower configurations, so the complete site electrical capacity should be calculated before deployment.

Can the cooling system be upgraded if the mining farm expands later?

Yes. This is one of the main advantages of the split-type architecture.

The external heat-rejection system is separated from the core mining container, so cooling capacity can be expanded, replaced, or reorganized as the mining farm grows without replacing the complete miner container. This makes the system suitable for phased MW-scale expansion.

210-Slot Split-Type Flexible Modular Hydro Cooling Solution

CONTAINER CAPACITY

Housed at full load
210 UNITS
Continuous electrical load
1200 KW

Custom

Standard

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 1 more models

Product Description

The 1.2MW 210-Slot Split-Type Antminer Hydro Mining Container 20FT HQ is a premier liquid cooling solution engineered for high-density Bitcoin mining in crypto mining farms.

Featuring an integrated power distribution system and water circulation control in a compact frame, its split design separates external water cooling units from the chassis to minimize physical footprint.

This modular architecture is ideal for irregular mining farm layouts and allows customizable heat dissipation using dry coolers or cooling towers. Crucially, it excels in long-term scalability, enabling operators to easily upgrade or expand liquid cooling components as BTC mining capacity grows without modifying the core ASIC miner container.

Core Advantages

01. Integrated All-in-One System

Integrates the rack, CDU, power cabinet, and control unit into one container for rapid, plug-and-play deployment.

02. Redundant Dual-Loop Cooling

Features dual loops, dual CDUs, and multi-channel power to ensure continuous, reliable cooling during partial power outages.

03. Individual Power Switches

Equips each miner with an individual switch, enabling safe maintenance on single units without interrupting operations.

04. Leak Detection System

Uses moisture-sensing ropes to instantly detect coolant leaks and trigger alarms, preventing damage and ensuring safety.

05. Premium Engineering Details

Features supplier-certified aviation plugs, reinforced grid panels, and durable 304 stainless steel manifolds with ball valves.

06. Intelligent Management System

Monitors flow rate, pressure, and temperature via multi-sensor arrays, enabling real-time remote control and mobile/PC alerts.

Full Specifications

External dimensions

L:6058mm、W:2438mm、H:2896mm

Internal dimensions

L:5860mm、W:2348mm、H:2720mm

Weight

4980KG

ModelAP-HC20-A210Installed capacity210 seat
Installed powerload1155 KWPower of the light-duty vertical multistage pump30 kW
Power of the fluid replenishing pump0.2 KWTotal power of the dry cooling tower fan49.8 KW
Total power of the closed cooling tower fan16.5 KWTotal power of the closed cooling tower spray pump4 KW
System pipeline pressure0.2-0.4 MPAOperating temperature range of the system22-42 ℃
Coolant circulation demand of a single machine≥0.5 m³/hTotal demand for circulating coolant within the system≥2.2 m³
Molded Case Circuit Breaker125 AResidual Current Circuit Breaker630 A
Contactor9 AIntermediate relay24 V
CUL certified frequency converter380 V

210-Slot 20FT Antminer Hydro Cooling Container Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your container deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × Container

1500 kVA Three-Phase Pad-Mounted Transformer

View 1500 kVA Transformer →

3000 kVA Pad Mount Three-Phase Transformer

For 2 × Containers

3000 kVA Three-Phase Pad-Mounted Transformer

View 3000 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

Compare

210-Slot 20FT Antminer Hydro Container

1.2 MW
210 Slots
6058 × 2438 × 2896 mm
Flexible Space & Modular Layouts

210-Slot 40FT Antminer Hydro Container

1.2 MW
210 Slots
12192× 2438 × 2896 mm
Turnkey Commercial Mining

308-Slot Antminer Hydro Container

1.7 MW
308 Slots
12192 × 2438 × 2896 mm
Industrial-Scale Operations

420-Slot Antminer Hydro Container

2.4 MW
420 Slots
12192 × 2438 × 2896 mm
Mega-Scale Mining Facilities

Real Results from Real Miners

View All >>

Apexto Abu Dhabi, United Arab Emirates 12 x 1.2MW Hydro Project

12 x 1.2MW Hydro Project

Achieving water-free sustainable mining in dry desert climates.

+28%

Efficiency Gain

-23%

Energy Cost

1.2M USD

Energy Cost

View All >>

Apexto Calgary, Canada 8 x 1.2MW Hydro Project

8 x 1.2MW Hydro Project

Sustaining consistent thermal performance during freezing winter seasons.

+100%

On-Time Startup

-25%

Setup Time

99.8%

System Reliability

View All >>

“

"Abu Dhabi’s strict water regulations prohibited wet cooling towers. This modular split container allowed us to deploy dry coolers easily, ensuring compliant, highly efficient operations in the desert."

— VP of Infrastructure, Abu Dhabi Green Mining

"Operating in the freezing winters of Calgary was our biggest concern, but this split system handled the cold climate smoothly. It kept our chip temperatures highly balanced and stable throughout the season."

— O&M Director, Calgary Mining Site, Canada

1.2+ GW

Cumulative delivered cooling capacity

50+

Countries and regions covered

210-Slot Antminer Hydro Cooling Container FAQs

Yes. The container provides 210 dedicated miner positions and is designed as a 1.2MW-class Hydro mining system for compatible Antminer Hydro miners.

The final full-load configuration is matched to the exact miner model and operating power before deployment, ensuring the total electrical and cooling load remains within the system design capacity.

The split design keeps the mining racks, power distribution, CDU, and controls inside the compact 20FT container while placing the final heat-rejection equipment outside.

This reduces the main container footprint and gives operators more freedom to position dry coolers or cooling towers according to the actual site layout. It also makes future cooling upgrades easier without rebuilding the miner container.

The main requirements are sufficient 380–415V three-phase electrical capacity, a suitable foundation for the container and external cooling equipment, clear routing for cooling pipes and electrical connections, and network access for system monitoring.

Planning these items before delivery helps reduce on-site construction work and speeds up commissioning.

The system uses dual cooling loops, dual CDUs, and multi-channel power architecture to provide cooling redundancy.

This design reduces the risk that a single cooling-side failure will stop the entire 210-miner deployment and improves serviceability for continuous mining operations.

Yes. Each miner position has an individual power switch, allowing a single miner to be powered down for inspection, replacement, or maintenance without stopping the other operating miners.

This is especially important in a 210-miner container because routine miner maintenance does not need to become container-wide downtime.

Moisture-sensing ropes are installed to detect coolant leakage and trigger an alarm when abnormal moisture is detected.

The intelligent control system also monitors coolant flow, pressure, and temperature, allowing operators to identify cooling abnormalities remotely before they develop into larger system problems.

No. Site electrical planning should include the miner load plus the cooling and auxiliary equipment.

The container uses circulation pumps, controls, and external heat-rejection equipment. Auxiliary power requirements also differ between dry-cooler and cooling-tower configurations, so the complete site electrical capacity should be calculated before deployment.

Yes. This is one of the main advantages of the split-type architecture.

The external heat-rejection system is separated from the core mining container, so cooling capacity can be expanded, replaced, or reorganized as the mining farm grows without replacing the complete miner container. This makes the system suitable for phased MW-scale expansion.

Customize Your Hydro Cooling Solution

Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.

Project Timeline

In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.

Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.

Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.

International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.

*All sales are final and non-refundable. Please understand, this is an industry standard.

Recommended Devices