
1.2MW 210-Slot Antminer Hydro Mining Container (20HQ)
In stock
$60,800.00 – $80,500.00
The 40ft ANTSPACE HW5 hydro container supports up to 210 Antminer units for dry-wet hybrid cooling, delivering a high-performance 1.2MW mining solution.
$45,000.00
Futures
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
POWER INPUT
Rated Voltage
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available

257 Th/s · 20.6 J/Th
240 Slots
Full‑load: $2,272.80/day

198 Th/s · 27.5 J/Th
240 Slots
Full‑load: $1,752.00/day

293 Th/s · 19 J/Th
240 Slots
Full‑load: $2,592.00/day

251 Th/s · 22 J/Th
240 Slots
Full‑load: $2,220.00/day

335 Th/s · 16 J/Th
240 Slots
Full‑load: $2,964.00/day

473 Th/s · 12 J/Th
240 Slots
Full‑load: $4,185.60/day

500 Th/s · 11 J/Th
240 Slots
Full‑load: $4,423.20/day

358 Th/s · 15 J/Th
240 Slots
Full‑load: $3,168.00/day

240 Slots

310 Th/s · 17 J/Th
240 Slots
Full‑load: $2,743.20/day

240 Slots

430 Th/s · 13 J/Th
240 Slots
Full‑load: $3,804.00/day

495 Th/s · 12 J/Th
240 Slots
Full‑load: $4,380.00/day

580 Th/s · 9.5 J/Th
240 Slots
Full‑load: $5,131.20/day
Designed as an integrated, water optimized infrastructure for Antminer hydro series units, the 1.2MW 210-Slot Bitmain ANTSPACE HW5 Hydro Cooling Container 40FT HQ is engineered with an advanced dry wet hybrid cooling tower.
By utilizing a highly efficient closed loop that sprays a thin water film across dry coils during extreme heat, the HW5 maintains peak J/TH mining efficiency even in hot, humid climates. This unique process rejects heat at lower coolant temperatures, securing an ultra low 1.017 PUE alongside highly reliable, long term operational uptime globally.
This standardized turnkey, plug and play solution reduces required site footprints by forty percent, significantly cutting onsite installation labor by seventy five percent while reducing low voltage cabling and transport expenses.
Core Advantages
Reduces required physical site footprints by forty percent and cuts onsite installation labor by seventy five percent, significantly decreasing your upfront CapEx and civil engineering costs.
Delivers highly optimized CapEx per megawatt compared to traditional dry systems, making it competitive for power abundant, water rich, and large scale global mining operations.
Features a quieter operational sound profile of seventy decibels, significantly reducing environmental noise on site, facilitating easier compliance with local municipal noise ordinance regulatory constraints.
Integrates an advanced PLC and HMI touchscreen system to monitor water temperatures, flow, and pressure in real time, providing automated alarms and precise system self regulation.
Integrates the server racks, CDU, power cabinets, and dry wet hybrid cooling tower into a single 40FT container for highly simplified, rapid onsite deployment operations.
Employs a dry wet cooling tower that utilizes pure convection dry mode for winter waterless saving, and evaporative wet mode to prevent summer downclocking during heat.
Reduces required physical site footprints by forty percent and cuts onsite installation labor by seventy five percent, significantly decreasing your upfront CapEx and civil engineering costs.
Delivers highly optimized CapEx per megawatt compared to traditional dry systems, making it competitive for power abundant, water rich, and large scale global mining operations.
Features a quieter operational sound profile of seventy decibels, significantly reducing environmental noise on site, facilitating easier compliance with local municipal noise ordinance regulatory constraints.
Integrates an advanced PLC and HMI touchscreen system to monitor water temperatures, flow, and pressure in real time, providing automated alarms and precise system self regulation.
Integrates the server racks, CDU, power cabinets, and dry wet hybrid cooling tower into a single 40FT container for highly simplified, rapid onsite deployment operations.
Employs a dry wet cooling tower that utilizes pure convection dry mode for winter waterless saving, and evaporative wet mode to prevent summer downclocking during heat.
Reduces required physical site footprints by forty percent and cuts onsite installation labor by seventy five percent, significantly decreasing your upfront CapEx and civil engineering costs.
Delivers highly optimized CapEx per megawatt compared to traditional dry systems, making it competitive for power abundant, water rich, and large scale global mining operations.
Full Specifications
L:12192mm、W:2438mm、H:2896mm
L:12000mm、W:2230mm、H:2660mm
14000 KG
| Model | ANTSPACE HW5 | Installed capacity | 210 Units |
| Main Switch Capacity of Power Distribution Cabinet | 1200*2 A | Rated Power | 1200 kW |
| Maximum Supported Input Current | ≤986*2 A | Maximum Supported Input Power | 1200 kW |
| Maximum Current per Miner Slot | ≤10 A | Flow rate | ≥85 m³/h |
| Quantity of ANTSPACE powered by one 2500kVA Transformer | 2 | Heat Dissipation Capacity | 1200 kW |
| Outlet Temperature @ 28℃ Wet Bulb Temperature | 35 ˚C | Operating Power | ≤15~29 kW |
| Water supply pipe Interface | DN40 | Drain Pipe Interface | DN65 |
| Noise level @25℃, 15m | 70 dBA | Water Consumption | 0.7~1.3 m³/h |
| Inner Coolant Usage | 1.6 m³ | Inner Coolant Usage | 400V±5% 50/60Hz |
| PUE@25℃ ambient temperature | 1.017 | Safety certification | NFPA 79:2021 UL 508A:2018 R8.21 CSA C22.2 No. 14-18 ANSI/ISO 12100:2012 IEC 60204 Ed 5.1 2009 |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
Match your container deployment with the appropriate transformer capacity.


Our engineers will recommend the right transformer based on your site conditions and power requirements.
Get Transformer Recommendation →We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |
Compare

| 1.2 MW |
| 210 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Commercial-Scale Mining |

| 1.5 MW |
| 308 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Mid-to-Large Operations |

| 2.4 MW |
| 420 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Industrial-Scale Projects |

| 2.6 MW |
| 480 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Mega-Scale Mining Facilities |
View All >>

Leveraging adjacent closed-loop retention reservoirs with HW5's hybrid spray cooling to sustain peak thermal efficiency without water contamination.
Running PUE
Water Consumption

Rapid turnkey deployment across open plains directly tied into high-voltage transmission lines, achieving ultra-low PUE across multi-row container arrays.
Optimal Running PUE
On-site Installation Labor
Footprint Reduction
“
"For a 24MW open-field buildout tied directly to the high-voltage grid, speed and density were everything. The HW5's integrated 40HQ design cut our on-site installation labor by seventy-five percent and reduced required pad space by forty percent, with all 20 containers running reliably at a 1.017 PUE."
— VP of Energy & Infrastructure, 24MW Grid Mining Site, Texas, USA
"Deploying directly adjacent to a water basin allowed us to maximize cooling, but environmental regulations on water safety were strict. The HW5's closed-loop hybrid system met every local compliance standard—slashing our water usage by forty-five percent while keeping 2,500+ Antminers running at peak hashrate year-round."
— Chief Operating Officer, 14.4MW Hydro Basin Facility, Paraguay
Global Deployment
Cumulative delivered cooling capacity
Serving Mining Sites
Countries and regions covered
How much make-up water does this hydro container actually consume during full-load operations?
At active full load, this container consumes zero point seven to one point three cubic meters of evaporative water hourly. This totals approximately six thousand to eleven thousand cubic meters annually, depending strictly on local climates and daily mining farm operations under load.
What site conditions and resource profiles make this container the ideal choice for mining operators?
This container is highly optimized for operators with abundant, low cost, or permitted local water resources. It represents a highly cost effective option for large enterprises prioritizing lower upfront CapEx over absolute physical land density during their main site infrastructure layout planning.
How does this cooling system handle extreme climates where ambient temperatures routinely exceed thirty-five degrees Celsius?
For hot environments exceeding thirty five degrees Celsius, this wet cooling setup is highly recommended. Its active evaporative wet stage pre cools inlet air, ensuring your mining hardware maintains standard hashing and J/TH fuel efficiency without any thermal downclocking on summer days.
Can the fully assembled container and cooling tower be shipped directly as a single piece internationally?
Yes. Carrying official CSC certification, this fully integrated container moves seamlessly by vessel, rail, or truck without any recrating as a standard ISO shipping unit. This avoids weeks of costly, on site manual reassembly labor and engineering setup expenses for global mining farms.
What is the actual PUE of this wet-cooling system, and how does it compare to dry-cooled models?
The system achieves an ultra low 1.017 PUE, slightly lower than typical dry cooled models. This specialized wet cooling setup rejects heat at lower coolant temperatures, ensuring highly optimized power efficiency and stable operations under continuous heavy loads for our global client sites.
CONTAINER CAPACITY
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available
Show 10 more models
Designed as an integrated, water optimized infrastructure for Antminer hydro series units, the 1.2MW 210-Slot Bitmain ANTSPACE HW5 Hydro Cooling Container 40FT HQ is engineered with an advanced dry wet hybrid cooling tower.
By utilizing a highly efficient closed loop that sprays a thin water film across dry coils during extreme heat, the HW5 maintains peak J/TH mining efficiency even in hot, humid climates. This unique process rejects heat at lower coolant temperatures, securing an ultra low 1.017 PUE alongside highly reliable, long term operational uptime globally.
This standardized turnkey, plug and play solution reduces required site footprints by forty percent, significantly cutting onsite installation labor by seventy five percent while reducing low voltage cabling and transport expenses.
Core Advantages
Reduces required physical site footprints by forty percent and cuts onsite installation labor by seventy five percent, significantly decreasing your upfront CapEx and civil engineering costs.
Delivers highly optimized CapEx per megawatt compared to traditional dry systems, making it competitive for power abundant, water rich, and large scale global mining operations.
Features a quieter operational sound profile of seventy decibels, significantly reducing environmental noise on site, facilitating easier compliance with local municipal noise ordinance regulatory constraints.
Integrates an advanced PLC and HMI touchscreen system to monitor water temperatures, flow, and pressure in real time, providing automated alarms and precise system self regulation.
Integrates the server racks, CDU, power cabinets, and dry wet hybrid cooling tower into a single 40FT container for highly simplified, rapid onsite deployment operations.
Employs a dry wet cooling tower that utilizes pure convection dry mode for winter waterless saving, and evaporative wet mode to prevent summer downclocking during heat.
Reduces required physical site footprints by forty percent and cuts onsite installation labor by seventy five percent, significantly decreasing your upfront CapEx and civil engineering costs.
Delivers highly optimized CapEx per megawatt compared to traditional dry systems, making it competitive for power abundant, water rich, and large scale global mining operations.
Features a quieter operational sound profile of seventy decibels, significantly reducing environmental noise on site, facilitating easier compliance with local municipal noise ordinance regulatory constraints.
Integrates an advanced PLC and HMI touchscreen system to monitor water temperatures, flow, and pressure in real time, providing automated alarms and precise system self regulation.
Integrates the server racks, CDU, power cabinets, and dry wet hybrid cooling tower into a single 40FT container for highly simplified, rapid onsite deployment operations.
Employs a dry wet cooling tower that utilizes pure convection dry mode for winter waterless saving, and evaporative wet mode to prevent summer downclocking during heat.
Reduces required physical site footprints by forty percent and cuts onsite installation labor by seventy five percent, significantly decreasing your upfront CapEx and civil engineering costs.
Delivers highly optimized CapEx per megawatt compared to traditional dry systems, making it competitive for power abundant, water rich, and large scale global mining operations.
Full Specifications
L:12192mm、W:2438mm、H:2896mm
L:12000mm、W:2230mm、H:2660mm
14000 KG
| Model | ANTSPACE HW5 | Installed capacity | 210 Units |
| Main Switch Capacity of Power Distribution Cabinet | 1200*2 A | Rated Power | 1200 kW |
| Maximum Supported Input Current | ≤986*2 A | Maximum Supported Input Power | 1200 kW |
| Maximum Current per Miner Slot | ≤10 A | Flow rate | ≥85 m³/h |
| Quantity of ANTSPACE powered by one 2500kVA Transformer | 2 | Heat Dissipation Capacity | 1200 kW |
| Outlet Temperature @ 28℃ Wet Bulb Temperature | 35 ˚C | Operating Power | ≤15~29 kW |
| Water supply pipe Interface | DN40 | Drain Pipe Interface | DN65 |
| Noise level @25℃, 15m | 70 dBA | Water Consumption | 0.7~1.3 m³/h |
| Inner Coolant Usage | 1.6 m³ | Inner Coolant Usage | 400V±5% 50/60Hz |
| PUE@25℃ ambient temperature | 1.017 | Safety certification | NFPA 79:2021 UL 508A:2018 R8.21 CSA C22.2 No. 14-18 ANSI/ISO 12100:2012 IEC 60204 Ed 5.1 2009 |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
Match your container deployment with the appropriate transformer capacity.


Our engineers will recommend the right transformer based on your site conditions and power requirements.
Get Transformer Recommendation →We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |
Compare

| 1.2 MW |
| 210 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Commercial-Scale Mining |

| 1.5 MW |
| 308 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Mid-to-Large Operations |

| 2.4 MW |
| 420 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Industrial-Scale Projects |

| 2.6 MW |
| 480 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Mega-Scale Mining Facilities |
View All >>

Leveraging adjacent closed-loop retention reservoirs with HW5's hybrid spray cooling to sustain peak thermal efficiency without water contamination.
Running PUE
Water Consumption

Rapid turnkey deployment across open plains directly tied into high-voltage transmission lines, achieving ultra-low PUE across multi-row container arrays.
Optimal Running PUE
On-site Installation Labor
Footprint Reduction
“
"For a 24MW open-field buildout tied directly to the high-voltage grid, speed and density were everything. The HW5's integrated 40HQ design cut our on-site installation labor by seventy-five percent and reduced required pad space by forty percent, with all 20 containers running reliably at a 1.017 PUE."
— VP of Energy & Infrastructure, 24MW Grid Mining Site, Texas, USA
"Deploying directly adjacent to a water basin allowed us to maximize cooling, but environmental regulations on water safety were strict. The HW5's closed-loop hybrid system met every local compliance standard—slashing our water usage by forty-five percent while keeping 2,500+ Antminers running at peak hashrate year-round."
— Chief Operating Officer, 14.4MW Hydro Basin Facility, Paraguay
Cumulative delivered cooling capacity
Countries and regions covered
At active full load, this container consumes zero point seven to one point three cubic meters of evaporative water hourly. This totals approximately six thousand to eleven thousand cubic meters annually, depending strictly on local climates and daily mining farm operations under load.
This container is highly optimized for operators with abundant, low cost, or permitted local water resources. It represents a highly cost effective option for large enterprises prioritizing lower upfront CapEx over absolute physical land density during their main site infrastructure layout planning.
The system achieves an ultra low 1.017 PUE, slightly lower than typical dry cooled models. This specialized wet cooling setup rejects heat at lower coolant temperatures, ensuring highly optimized power efficiency and stable operations under continuous heavy loads for our global client sites.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop