1.2MW 210-Slot Integrated Antminer Hydro Mining Container (40HQ)

This hydro mining container is an all-in-one solution with an integrated closed cooling tower, supporting up to 210 Antminer S19/S21/S23 series hydro miners for stable Bitcoin mining.

$64,000.00

In stock

Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.

Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.

Trusted by

  • Apexto Mining reviews on Trustpilot
  • WhatToMine
  • Kryptex
  • NiceHash

Payment Method

  • USD
  • USDT(TRC 20)
  • KAS
  • BTC
  • ETH
  • LTC
  • DOGE
  • USDC(ERC20)

210-Slot One-Stop Fully Integrated "Plug-and-Play" Container Solution

CONTAINER CAPACITY

ASIC MINERS

210 UNITS

Housed at full load

TOTAL POWER

1200 KW

Continuous electrical load

FORM FACTOR

Custom

Standard

COOLING

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 1 more models

Product Description

The 1.2MW 210-Slot Integrated Antminer Hydro Mining Container 40FT HQ features a built-in, high-efficiency closed-loop cooling tower, integrating power distribution and water cooling circulation control within a single, unified frame for turnkey Bitcoin mining deployment.

This all-in-one liquid cooling system offers a streamlined plug-and-play experience, requiring only level placement, main power hookup, and a quick water top-off to begin operating a high-density crypto mining farm.

Its factory-calibrated and sealed cooling loop is designed to ensure maximum water-loop integrity and consistent thermal performance under load, making it a highly reliable, low-maintenance, and rapid-deployment mining infrastructure solution for megawatt-scale BTC mining sites.

Core Advantages

01. Integrated All-in-One System

Integrates the rack, CDU, power cabinet, control unit, and closed-loop cooling tower into a single container for rapid on-site setup, minimizing deployment time and civil costs.

02. In-House Precision & Fittings

Manufactured in our own factory with strict quality control, utilizing genuine, factory-original connectors and aviation plugs alongside premium hoses to ensure maximum pressure resistance and durability.

03. Advanced CDU & Leak Detection

The integrated CDU houses high-volume pumps, plate heat exchangers, expansion tanks, and built-in leak detection sensors, delivering high-performance circulation with instant safety monitoring.

210-Slot 1.2MW Antminer Hydro Cooling Container & Closed Cooling Tower 8

04. Individual Power Switches

Every miner slot is equipped with an independent power switch and breaker, allowing for safe, hot-swappable maintenance on single units without disrupting the overall mining container’s operation.

210-Slot 1.2MW Antminer Hydro Cooling Container & Closed Cooling Tower7

05. Intelligent Management System

Monitors flow rates, pressure, temperatures, and PUE in real-time, enabling automated malfunction alerts, precise system self-regulation, and convenient remote control via mobile or PC applications.

Antminer Hydro Cooling Closed Cooling Tower

06.Built-In Closed-Loop Tower

The built-in closed-loop cooling tower supports dry-wet hybrid operation, switching from wet evaporative cooling to prevent summer downclocking to waterless dry cooling for winter freezing protection.

Full Specifications

External dimensions

L:12192mm、W:2438mm、H:2896mm

Internal dimensions

L:12000mm、W:2230mm、H:2660mm

Weight

10500KG

ModelAP-HC40-A210Installed capacity210 seat
Installed powerload1155 KWPower of the light-duty vertical multistage pump30 kW
Power of the fluid replenishing pump0.2 KWTotal power of the dry cooling tower fan--
Total power of the closed cooling tower fan16.5 KWTotal power of the closed cooling tower spray pump4 KW
System pipeline pressure0.2-0.4 MPAOperating temperature range of the system22-42 ℃
Coolant circulation demand of a single machine≥0.5 m³/hTotal demand for circulating coolant within the system≥2.2 m³
Molded Case Circuit Breaker--Residual Current Circuit Breaker630 A
Contactor9 AIntermediate relay24 V
CUL certified frequency converter380 V

210-Slot 40FT Antminer Integrated Hydro Cooling Container Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your container deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × Container

1500 kVA Three-Phase Pad-Mounted Transformer

View 1500 kVA Transformer →

3000 kVA Pad Mount Three-Phase Transformer

For 2 × Containers

3000 kVA Three-Phase Pad-Mounted Transformer

View 3000 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

Compare

210-Slot 40FT Antminer Hydro Container

1.2 MW
210 Slots
1,2192× 2,438 × 2,896 mm
Turnkey Commercial Mining

210-Slot 20FT Antminer Hydro Container

1.2 MW
210 Slots
6,058 × 2,438 × 2,986 mm
Flexible Space & Modular Layouts

240-Slot Antminer Hydro Container

1.4 MW
240 Slots
6,058 × 2,438 × 2,986 mm
Mid-to-Large Mining Farms

308-Slot Antminer Hydro Container

1.7 MW
308 Slots
1,2192 × 2,438 × 2,896 mm
Industrial-Scale Operations

Real Results from Real Miners

View All >>

Apexto 1.2MW Hydro Cooling Container Project
Austin, United States

4 x 1.2MW Hydro Project

Sustaining peak hashrates using built-in closed-loop towers.

+32%

Cooling Efficiency

-25%

Cooling Power Draw

$1.5M

Annual Savings

View All >>

Apexto 1.2MW Hydro Container Project
Santiago, Chile

10 x 1.2MW Hydro Project

Eliminating external tower installation with integrated closed-loops.

+100%

Water-Loop Integrity

-40%

On-site Civil Costs

99.9%

Thermal Reliability

View All >>

“

"Having the closed-loop cooling tower pre-installed saved us massive civil engineering and pipe-welding costs. We dropped the container, hooked up water and power, and were immediately mining without any plumbing hassles."

— VP of Operations, Texas Mining Facility

"Deploying in remote areas of Chile made on-site engineering very difficult. This integrated closed-loop container eliminated any need for external tower installation, letting us start mining with zero plumbing hassles."

— Infrastructure Lead, Santiago Mining Site, Chile

Global Deployment

1.2+ GW

Cumulative delivered cooling capacity

Serving Mining Sites

50+

Countries and regions covered

210-Slot Integrated Antminer Hydro Cooling Container FAQs

What are the main advantages of an integrated closed-loop cooling tower?

The cooling tower, CDU, mining racks, power distribution, and control system are integrated into one container and factory-tested before shipment.

This reduces external piping, on-site welding, cooling-tower installation, and commissioning work, making megawatt-scale Hydro mining deployment more standardized and easier to manage.

Why can this integrated system be deployed faster than a split-type container?

Most of the cooling circulation, electrical distribution, controls, and heat-rejection equipment are already assembled and configured before delivery.

Once the site foundation, main power, water supply, and network are ready, the amount of field construction is significantly reduced compared with a system that requires a separate cooling tower and extensive external piping.

How does the closed-loop tower protect coolant quality and miner cooling channels?

The miner cooling loop remains isolated from the external air and spray-water circuit.

This helps prevent dust, minerals, and other external contaminants from entering the miner-side coolant loop, reducing scaling and corrosion risks and helping maintain consistent heat-transfer performance over long-term operation.

What protection is built into the container if the cooling system develops a fault?

The system combines redundant circulation design with real-time monitoring of temperature, flow, pressure, and coolant leakage.

Moisture-sensing ropes and automated alarms help operators detect abnormal conditions quickly, while system protection functions can respond before a localized cooling problem develops into a larger container-level issue.

How does the dry-wet hybrid cooling tower adapt to different seasons?

The integrated tower can use different heat-rejection modes according to ambient conditions.

During hot weather, wet evaporative cooling provides additional heat-rejection capacity to help maintain stable miner operation. In cooler conditions, the system can rely more on dry cooling, reducing water consumption and improving cold-weather operation.

Does a closed-loop cooling tower consume water continuously?

Not at the same rate under all operating conditions.

The miner-side coolant remains in a closed circulation loop. Water consumption mainly comes from the evaporative cooling section when wet mode is required. During cooler periods, greater use of dry operation can reduce make-up water demand.

What site conditions should be checked before choosing an integrated 40FT container?

The most important factors are local maximum and minimum temperatures, water availability and quality, site electrical capacity, foundation conditions, and sufficient clearance around the cooling-tower air intake and discharge areas.

Because the cooling tower is already integrated into the container, these site conditions are more important than designing a separate external cooling system after delivery.

When does an integrated closed-loop container make more sense than a split-type cooling system?

It is particularly suitable when reducing on-site engineering work, shortening deployment time, and keeping the cooling system standardized are major priorities.

For remote sites, projects with limited local installation capability, or operators deploying multiple identical mining units, the factory-integrated architecture can simplify replication and reduce the amount of cooling infrastructure that must be built separately at each deployment.

Recommended Power Setup

Match your HD5 deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × HD5 Container

2550 kVA Three-Phase Pad-Mounted Transformer

View 2550 kVA Transformer →

1500 kVA Pad Mount Three-Phase Transformer

For 2 × HD5 Containers

3750 kVA Three-Phase Pad-Mounted Transformer

View 3750 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

210-Slot One-Stop Fully Integrated "Plug-and-Play" Container Solution

CONTAINER CAPACITY

Housed at full load
210 UNITS
Continuous electrical load
1200 KW

Custom

Standard

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 1 more models

Product Description

The 1.2MW 210-Slot Integrated Antminer Hydro Mining Container 40FT HQ features a built-in, high-efficiency closed-loop cooling tower, integrating power distribution and water cooling circulation control within a single, unified frame for turnkey Bitcoin mining deployment.

This all-in-one liquid cooling system offers a streamlined plug-and-play experience, requiring only level placement, main power hookup, and a quick water top-off to begin operating a high-density crypto mining farm.

Its factory-calibrated and sealed cooling loop is designed to ensure maximum water-loop integrity and consistent thermal performance under load, making it a highly reliable, low-maintenance, and rapid-deployment mining infrastructure solution for megawatt-scale BTC mining sites.

Core Advantages

01. Integrated All-in-One System

Integrates the rack, CDU, power cabinet, control unit, and closed-loop cooling tower into a single container for rapid on-site setup, minimizing deployment time and civil costs.

02. In-House Precision & Fittings

Manufactured in our own factory with strict quality control, utilizing genuine, factory-original connectors and aviation plugs alongside premium hoses to ensure maximum pressure resistance and durability.

03. Advanced CDU & Leak Detection

The integrated CDU houses high-volume pumps, plate heat exchangers, expansion tanks, and built-in leak detection sensors, delivering high-performance circulation with instant safety monitoring.

210-Slot 1.2MW Antminer Hydro Cooling Container & Closed Cooling Tower 8

04. Individual Power Switches

Every miner slot is equipped with an independent power switch and breaker, allowing for safe, hot-swappable maintenance on single units without disrupting the overall mining container’s operation.

210-Slot 1.2MW Antminer Hydro Cooling Container & Closed Cooling Tower7

05. Intelligent Management System

Monitors flow rates, pressure, temperatures, and PUE in real-time, enabling automated malfunction alerts, precise system self-regulation, and convenient remote control via mobile or PC applications.

Antminer Hydro Cooling Closed Cooling Tower

06.Built-In Closed-Loop Tower

The built-in closed-loop cooling tower supports dry-wet hybrid operation, switching from wet evaporative cooling to prevent summer downclocking to waterless dry cooling for winter freezing protection.

Full Specifications

External dimensions

L:12192mm、W:2438mm、H:2896mm

Internal dimensions

L:12000mm、W:2230mm、H:2660mm

Weight

10500KG

ModelAP-HC40-A210Installed capacity210 seat
Installed powerload1155 KWPower of the light-duty vertical multistage pump30 kW
Power of the fluid replenishing pump0.2 KWTotal power of the dry cooling tower fan--
Total power of the closed cooling tower fan16.5 KWTotal power of the closed cooling tower spray pump4 KW
System pipeline pressure0.2-0.4 MPAOperating temperature range of the system22-42 ℃
Coolant circulation demand of a single machine≥0.5 m³/hTotal demand for circulating coolant within the system≥2.2 m³
Molded Case Circuit Breaker--Residual Current Circuit Breaker630 A
Contactor9 AIntermediate relay24 V
CUL certified frequency converter380 V

210-Slot 40FT Antminer Integrated Hydro Cooling Container Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your container deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × Container

1500 kVA Three-Phase Pad-Mounted Transformer

View 1500 kVA Transformer →

3000 kVA Pad Mount Three-Phase Transformer

For 2 × Containers

3000 kVA Three-Phase Pad-Mounted Transformer

View 3000 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

Compare

210-Slot 40FT Antminer Hydro Container

1.2 MW
210 Slots
1,2192× 2,438 × 2,896 mm
Turnkey Commercial Mining

210-Slot 20FT Antminer Hydro Container

1.2 MW
210 Slots
6,058 × 2,438 × 2,986 mm
Flexible Space & Modular Layouts

240-Slot Antminer Hydro Container

1.4 MW
240 Slots
6,058 × 2,438 × 2,986 mm
Mid-to-Large Mining Farms

308-Slot Antminer Hydro Container

1.7 MW
308 Slots
1,2192 × 2,438 × 2,896 mm
Industrial-Scale Operations

Real Results from Real Miners

View All >>

Apexto 1.2MW Hydro Cooling Container Project

4 x 1.2MW Hydro Project

Sustaining peak hashrates using built-in closed-loop towers.

+32%

Cooling Efficiency

-25%

Cooling Power Draw

$1.5M

Annual Savings

View All >>

Apexto 1.2MW Hydro Container Project

10 x 1.2MW Hydro Project

Eliminating external tower installation with integrated closed-loops.

+100%

Water-Loop Integrity

-40%

On-site Civil Costs

99.9%

Thermal Reliability

View All >>

“

"Having the closed-loop cooling tower pre-installed saved us massive civil engineering and pipe-welding costs. We dropped the container, hooked up water and power, and were immediately mining without any plumbing hassles."

— VP of Operations, Texas Mining Facility

"Deploying in remote areas of Chile made on-site engineering very difficult. This integrated closed-loop container eliminated any need for external tower installation, letting us start mining with zero plumbing hassles."

— Infrastructure Lead, Santiago Mining Site, Chile

1.2+ GW

Cumulative delivered cooling capacity

50+

Countries and regions covered

210-Slot Integrated Antminer Hydro Cooling Container FAQs

The cooling tower, CDU, mining racks, power distribution, and control system are integrated into one container and factory-tested before shipment.

This reduces external piping, on-site welding, cooling-tower installation, and commissioning work, making megawatt-scale Hydro mining deployment more standardized and easier to manage.

Most of the cooling circulation, electrical distribution, controls, and heat-rejection equipment are already assembled and configured before delivery.

Once the site foundation, main power, water supply, and network are ready, the amount of field construction is significantly reduced compared with a system that requires a separate cooling tower and extensive external piping.

The miner cooling loop remains isolated from the external air and spray-water circuit.

This helps prevent dust, minerals, and other external contaminants from entering the miner-side coolant loop, reducing scaling and corrosion risks and helping maintain consistent heat-transfer performance over long-term operation.

The system combines redundant circulation design with real-time monitoring of temperature, flow, pressure, and coolant leakage.

Moisture-sensing ropes and automated alarms help operators detect abnormal conditions quickly, while system protection functions can respond before a localized cooling problem develops into a larger container-level issue.

The integrated tower can use different heat-rejection modes according to ambient conditions.

During hot weather, wet evaporative cooling provides additional heat-rejection capacity to help maintain stable miner operation. In cooler conditions, the system can rely more on dry cooling, reducing water consumption and improving cold-weather operation.

Not at the same rate under all operating conditions.

The miner-side coolant remains in a closed circulation loop. Water consumption mainly comes from the evaporative cooling section when wet mode is required. During cooler periods, greater use of dry operation can reduce make-up water demand.

The most important factors are local maximum and minimum temperatures, water availability and quality, site electrical capacity, foundation conditions, and sufficient clearance around the cooling-tower air intake and discharge areas.

Because the cooling tower is already integrated into the container, these site conditions are more important than designing a separate external cooling system after delivery.

It is particularly suitable when reducing on-site engineering work, shortening deployment time, and keeping the cooling system standardized are major priorities.

For remote sites, projects with limited local installation capability, or operators deploying multiple identical mining units, the factory-integrated architecture can simplify replication and reduce the amount of cooling infrastructure that must be built separately at each deployment.

Recommended Power Setup

Match your HD5 deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × HD5 Container

2550 kVA Three-Phase Pad-Mounted Transformer

View 2550 kVA Transformer →

1500 kVA Pad Mount Three-Phase Transformer

For 2 × HD5 Containers

3750 kVA Three-Phase Pad-Mounted Transformer

View 3750 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Customize Your Hydro Cooling Solution

Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.

Project Timeline

In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.

Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.

Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.

International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.

*All sales are final and non-refundable. Please understand, this is an industry standard.

Recommended Devices