
1.2MW 210-Slot Antminer Hydro Mining Container (20HQ)
In stock
$60,800.00 – $80,500.00
This hydro mining container is an all-in-one solution with an integrated closed cooling tower, supporting up to 210 Antminer S19/S21/S23 series hydro miners for stable Bitcoin mining.
$64,000.00
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available

251 Th/s · 22 J/Th
210 Slots
Full‑load: $1,942.50/day

473 Th/s · 12 J/Th
210 Slots
Full‑load: $3,662.40/day

358 Th/s · 15 J/Th
210 Slots
Full‑load: $2,772.00/day

310 Th/s · 17 J/Th
210 Slots
Full‑load: $2,400.30/day

580 Th/s · 9.5 J/Th
210 Slots
Full‑load: $4,489.80/day
The 1.2MW 210-Slot Integrated Antminer Hydro Mining Container 40FT HQ features a built-in, high-efficiency closed-loop cooling tower, integrating power distribution and water cooling circulation control within a single, unified frame for turnkey Bitcoin mining deployment.
This all-in-one liquid cooling system offers a streamlined plug-and-play experience, requiring only level placement, main power hookup, and a quick water top-off to begin operating a high-density crypto mining farm.
Its factory-calibrated and sealed cooling loop is designed to ensure maximum water-loop integrity and consistent thermal performance under load, making it a highly reliable, low-maintenance, and rapid-deployment mining infrastructure solution for megawatt-scale BTC mining sites.
Core Advantages

Integrates the rack, CDU, power cabinet, control unit, and closed-loop cooling tower into a single container for rapid on-site setup, minimizing deployment time and civil costs.

Manufactured in our own factory with strict quality control, utilizing genuine, factory-original connectors and aviation plugs alongside premium hoses to ensure maximum pressure resistance and durability.

The integrated CDU houses high-volume pumps, plate heat exchangers, expansion tanks, and built-in leak detection sensors, delivering high-performance circulation with instant safety monitoring.

Every miner slot is equipped with an independent power switch and breaker, allowing for safe, hot-swappable maintenance on single units without disrupting the overall mining container’s operation.

Monitors flow rates, pressure, temperatures, and PUE in real-time, enabling automated malfunction alerts, precise system self-regulation, and convenient remote control via mobile or PC applications.

The built-in closed-loop cooling tower supports dry-wet hybrid operation, switching from wet evaporative cooling to prevent summer downclocking to waterless dry cooling for winter freezing protection.
Full Specifications
L:12192mm、W:2438mm、H:2896mm
L:12000mm、W:2230mm、H:2660mm
10500KG
| Model | AP-HC40-A210 | Installed capacity | 210 seat |
| Installed powerload | 1155 KW | Power of the light-duty vertical multistage pump | 30 kW |
| Power of the fluid replenishing pump | 0.2 KW | Total power of the dry cooling tower fan | -- |
| Total power of the closed cooling tower fan | 16.5 KW | Total power of the closed cooling tower spray pump | 4 KW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 22-42 ℃ |
| Coolant circulation demand of a single machine | ≥0.5 m³/h | Total demand for circulating coolant within the system | ≥2.2 m³ |
| Molded Case Circuit Breaker | -- | Residual Current Circuit Breaker | 630 A |
| Contactor | 9 A | Intermediate relay | 24 V |
| CUL certified frequency converter | 380 V |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
Match your container deployment with the appropriate transformer capacity.


Our engineers will recommend the right transformer based on your site conditions and power requirements.
Get Transformer Recommendation →We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |
Compare

| 1.2 MW |
| 210 Slots |
| 1,2192× 2,438 × 2,896 mm |
| Turnkey Commercial Mining |

| 1.2 MW |
| 210 Slots |
| 6,058 × 2,438 × 2,986 mm |
| Flexible Space & Modular Layouts |

| 1.4 MW |
| 240 Slots |
| 6,058 × 2,438 × 2,986 mm |
| Mid-to-Large Mining Farms |

| 1.7 MW |
| 308 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Industrial-Scale Operations |
View All >>

Sustaining peak hashrates using built-in closed-loop towers.
Cooling Efficiency
Cooling Power Draw

Eliminating external tower installation with integrated closed-loops.
Water-Loop Integrity
On-site Civil Costs
Thermal Reliability
“
"Having the closed-loop cooling tower pre-installed saved us massive civil engineering and pipe-welding costs. We dropped the container, hooked up water and power, and were immediately mining without any plumbing hassles."
— VP of Operations, Texas Mining Facility
"Deploying in remote areas of Chile made on-site engineering very difficult. This integrated closed-loop container eliminated any need for external tower installation, letting us start mining with zero plumbing hassles."
— Infrastructure Lead, Santiago Mining Site, Chile
Global Deployment
Cumulative delivered cooling capacity
Serving Mining Sites
Countries and regions covered
What are the main advantages of an integrated closed-loop cooling tower?
The cooling tower, CDU, mining racks, power distribution, and control system are integrated into one container and factory-tested before shipment.
This reduces external piping, on-site welding, cooling-tower installation, and commissioning work, making megawatt-scale Hydro mining deployment more standardized and easier to manage.
Why can this integrated system be deployed faster than a split-type container?
Most of the cooling circulation, electrical distribution, controls, and heat-rejection equipment are already assembled and configured before delivery.
Once the site foundation, main power, water supply, and network are ready, the amount of field construction is significantly reduced compared with a system that requires a separate cooling tower and extensive external piping.
How does the closed-loop tower protect coolant quality and miner cooling channels?
The miner cooling loop remains isolated from the external air and spray-water circuit.
This helps prevent dust, minerals, and other external contaminants from entering the miner-side coolant loop, reducing scaling and corrosion risks and helping maintain consistent heat-transfer performance over long-term operation.
What protection is built into the container if the cooling system develops a fault?
The system combines redundant circulation design with real-time monitoring of temperature, flow, pressure, and coolant leakage.
Moisture-sensing ropes and automated alarms help operators detect abnormal conditions quickly, while system protection functions can respond before a localized cooling problem develops into a larger container-level issue.
How does the dry-wet hybrid cooling tower adapt to different seasons?
The integrated tower can use different heat-rejection modes according to ambient conditions.
During hot weather, wet evaporative cooling provides additional heat-rejection capacity to help maintain stable miner operation. In cooler conditions, the system can rely more on dry cooling, reducing water consumption and improving cold-weather operation.
Does a closed-loop cooling tower consume water continuously?
Not at the same rate under all operating conditions.
The miner-side coolant remains in a closed circulation loop. Water consumption mainly comes from the evaporative cooling section when wet mode is required. During cooler periods, greater use of dry operation can reduce make-up water demand.
What site conditions should be checked before choosing an integrated 40FT container?
The most important factors are local maximum and minimum temperatures, water availability and quality, site electrical capacity, foundation conditions, and sufficient clearance around the cooling-tower air intake and discharge areas.
Because the cooling tower is already integrated into the container, these site conditions are more important than designing a separate external cooling system after delivery.
When does an integrated closed-loop container make more sense than a split-type cooling system?
It is particularly suitable when reducing on-site engineering work, shortening deployment time, and keeping the cooling system standardized are major priorities.
For remote sites, projects with limited local installation capability, or operators deploying multiple identical mining units, the factory-integrated architecture can simplify replication and reduce the amount of cooling infrastructure that must be built separately at each deployment.
Match your HD5 deployment with the appropriate transformer capacity.


Our engineers will recommend the right transformer based on your site conditions and power requirements.
Get Transformer Recommendation →CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available
Show 1 more models
The 1.2MW 210-Slot Integrated Antminer Hydro Mining Container 40FT HQ features a built-in, high-efficiency closed-loop cooling tower, integrating power distribution and water cooling circulation control within a single, unified frame for turnkey Bitcoin mining deployment.
This all-in-one liquid cooling system offers a streamlined plug-and-play experience, requiring only level placement, main power hookup, and a quick water top-off to begin operating a high-density crypto mining farm.
Its factory-calibrated and sealed cooling loop is designed to ensure maximum water-loop integrity and consistent thermal performance under load, making it a highly reliable, low-maintenance, and rapid-deployment mining infrastructure solution for megawatt-scale BTC mining sites.
Core Advantages

Integrates the rack, CDU, power cabinet, control unit, and closed-loop cooling tower into a single container for rapid on-site setup, minimizing deployment time and civil costs.

Manufactured in our own factory with strict quality control, utilizing genuine, factory-original connectors and aviation plugs alongside premium hoses to ensure maximum pressure resistance and durability.

The integrated CDU houses high-volume pumps, plate heat exchangers, expansion tanks, and built-in leak detection sensors, delivering high-performance circulation with instant safety monitoring.

Every miner slot is equipped with an independent power switch and breaker, allowing for safe, hot-swappable maintenance on single units without disrupting the overall mining container’s operation.

Monitors flow rates, pressure, temperatures, and PUE in real-time, enabling automated malfunction alerts, precise system self-regulation, and convenient remote control via mobile or PC applications.

The built-in closed-loop cooling tower supports dry-wet hybrid operation, switching from wet evaporative cooling to prevent summer downclocking to waterless dry cooling for winter freezing protection.
Full Specifications
L:12192mm、W:2438mm、H:2896mm
L:12000mm、W:2230mm、H:2660mm
10500KG
| Model | AP-HC40-A210 | Installed capacity | 210 seat |
| Installed powerload | 1155 KW | Power of the light-duty vertical multistage pump | 30 kW |
| Power of the fluid replenishing pump | 0.2 KW | Total power of the dry cooling tower fan | -- |
| Total power of the closed cooling tower fan | 16.5 KW | Total power of the closed cooling tower spray pump | 4 KW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 22-42 ℃ |
| Coolant circulation demand of a single machine | ≥0.5 m³/h | Total demand for circulating coolant within the system | ≥2.2 m³ |
| Molded Case Circuit Breaker | -- | Residual Current Circuit Breaker | 630 A |
| Contactor | 9 A | Intermediate relay | 24 V |
| CUL certified frequency converter | 380 V |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
Match your container deployment with the appropriate transformer capacity.


Our engineers will recommend the right transformer based on your site conditions and power requirements.
Get Transformer Recommendation →We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |
Compare

| 1.2 MW |
| 210 Slots |
| 1,2192× 2,438 × 2,896 mm |
| Turnkey Commercial Mining |

| 1.2 MW |
| 210 Slots |
| 6,058 × 2,438 × 2,986 mm |
| Flexible Space & Modular Layouts |

| 1.4 MW |
| 240 Slots |
| 6,058 × 2,438 × 2,986 mm |
| Mid-to-Large Mining Farms |

| 1.7 MW |
| 308 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Industrial-Scale Operations |
View All >>

Sustaining peak hashrates using built-in closed-loop towers.
Cooling Efficiency
Cooling Power Draw

Eliminating external tower installation with integrated closed-loops.
Water-Loop Integrity
On-site Civil Costs
Thermal Reliability
“
"Having the closed-loop cooling tower pre-installed saved us massive civil engineering and pipe-welding costs. We dropped the container, hooked up water and power, and were immediately mining without any plumbing hassles."
— VP of Operations, Texas Mining Facility
"Deploying in remote areas of Chile made on-site engineering very difficult. This integrated closed-loop container eliminated any need for external tower installation, letting us start mining with zero plumbing hassles."
— Infrastructure Lead, Santiago Mining Site, Chile
Cumulative delivered cooling capacity
Countries and regions covered
The cooling tower, CDU, mining racks, power distribution, and control system are integrated into one container and factory-tested before shipment.
This reduces external piping, on-site welding, cooling-tower installation, and commissioning work, making megawatt-scale Hydro mining deployment more standardized and easier to manage.
Most of the cooling circulation, electrical distribution, controls, and heat-rejection equipment are already assembled and configured before delivery.
Once the site foundation, main power, water supply, and network are ready, the amount of field construction is significantly reduced compared with a system that requires a separate cooling tower and extensive external piping.
The miner cooling loop remains isolated from the external air and spray-water circuit.
This helps prevent dust, minerals, and other external contaminants from entering the miner-side coolant loop, reducing scaling and corrosion risks and helping maintain consistent heat-transfer performance over long-term operation.
The system combines redundant circulation design with real-time monitoring of temperature, flow, pressure, and coolant leakage.
Moisture-sensing ropes and automated alarms help operators detect abnormal conditions quickly, while system protection functions can respond before a localized cooling problem develops into a larger container-level issue.
The integrated tower can use different heat-rejection modes according to ambient conditions.
During hot weather, wet evaporative cooling provides additional heat-rejection capacity to help maintain stable miner operation. In cooler conditions, the system can rely more on dry cooling, reducing water consumption and improving cold-weather operation.
Not at the same rate under all operating conditions.
The miner-side coolant remains in a closed circulation loop. Water consumption mainly comes from the evaporative cooling section when wet mode is required. During cooler periods, greater use of dry operation can reduce make-up water demand.
The most important factors are local maximum and minimum temperatures, water availability and quality, site electrical capacity, foundation conditions, and sufficient clearance around the cooling-tower air intake and discharge areas.
Because the cooling tower is already integrated into the container, these site conditions are more important than designing a separate external cooling system after delivery.
It is particularly suitable when reducing on-site engineering work, shortening deployment time, and keeping the cooling system standardized are major priorities.
For remote sites, projects with limited local installation capability, or operators deploying multiple identical mining units, the factory-integrated architecture can simplify replication and reduce the amount of cooling infrastructure that must be built separately at each deployment.
Match your HD5 deployment with the appropriate transformer capacity.


Our engineers will recommend the right transformer based on your site conditions and power requirements.
Get Transformer Recommendation →Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop