2550 kVA Three-Phase Pad Mounted Transformer

Power 2MW+ mining containers & data halls with Apexto 2550 kVA 3 phase padmount transformers in stock. Custom voltages, globally certified & ships in 1-3 days!

Contact us for price

Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.

Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.

Trusted by

  • Apexto Mining reviews on Trustpilot
  • WhatToMine
  • Kryptex
  • NiceHash

Payment Method

  • USD
  • USDT(TRC 20)
  • KAS
  • BTC
  • ETH
  • LTC
  • DOGE
  • USDC(ERC20)

Heavy-Duty Power 2550 kVA 3-Phase Pad-Mounted Transformer

Key specifications at a glance for quick reference and confident planning.

Rated Capacity

2550 kVA

Feed Type

Loop / Radial

Cooling Medium

ONAN

Frequency

60 Hz

Installation

Outdoor Pad-Mounted

WAREHOUSE LOCATIONS

USA • Canada • UAE • China • Global Dispatch

FAST DISPATCH

Ready Stock • Ships in 1-3 Days • DDP Door-to-Door

Product Profile

The 2550 kVA model is positioned differently from the standard 2500 kVA unit. Its focus is high-density computing and data center power architecture, where precise transformer capacity and 415V or 480V secondary distribution may be part of the electrical design.

The 2.55 MVA rating can be configured around project-specific medium-voltage input, downstream distribution voltage, impedance, monitoring, and protection requirements. It is especially relevant where transformer selection is tied closely to the power block design of the data hall or compute module.

Rather than serving as a general-purpose 2.55 MVA alternative, the 2550 kVA unit is best treated as an engineered solution for specialized high-density electrical infrastructure.

Core Advantages

2250 kVA 3-Phase Padmount Transformer Internal Structure

01. Dead-Front Dual Compartment

Features a dual-compartment design separating high and low voltage with a rigid steel barrier. Enclosed dead-front bushings ensure maximum touch safety and tamper protection.

2250 kVA 3-Phase Padmount Transformer Dual-Source Control Panel

02. Multi-Tier Fuse & Switch Bay

Integrates accessible Bay-O-Net fuses with a four-position load-break switch (Source A/B) and a tap changer, ensuring instant fault isolation and safe power transfer.

2250 kVA 3-Phase Padmount Transformer Monitoring Panel

03. Comprehensive Gauge Suite

Equipped with precision dial thermometer, pressure/vacuum, and oil level gauges alongside an automatic pressure relief valve (PRV) for continuous operational safety.

2250 kVA 3-Phase Padmount Transformer Cooling Control Cabinet

04. Auxiliary Control Cabinet

Houses neatly organized DIN-rail circuit breakers, terminal blocks, a power supply, and convenience outlet, simplifying secondary control wiring and field testing.

2250 kVA 3-Phase Padmount Transformer Forced-Air Cooling System

05. High-Conductivity LV Busbars

Fitted with heavy-duty tin-plated NEMA spade terminals (X0–X3) designed for high current capacity, minimizing contact resistance and easing multi-cable connections.

2250 kVA 3-Phase Padmount Transformer Low-Voltage Spade Bushings

06. C5-M Enclosure & Cooling Fans

Protected by a C5-M marine-grade steel enclosure with large cooling radiator banks and auxiliary forced-air fans, engineered for non-stop duty in harsh environments.

Full Specifications

External dimensions

L:2500mm、W:2000mm、H:2300mm

Internal dimensions

L:2450mm、W:1950mm、H:2350mm

Weight

6000KG

Rated Capacity2550 kVA / 2.55 MVAPhaseThree Phase
Frequency60 HzPrimary VoltageCustomized (Typical 12.47kV / 13.8kV / 24.94kV / 34.5kV)
Secondary VoltageCustomized (Typical 480Y/277V)Winding ConfigurationDelta - Wye / Grounded Wye (Project Specific)
Winding MaterialCopper / Aluminum AvailableCooling TypeONAN
Insulation FluidMineral OilTemperature Rise65°C
ImpedanceTypical 5.75%BIL RatingAccording to Voltage Class
Vector GroupDyn1 / CustomizedTap ChangerOff-Circuit Tap Changer
StandardsANSI / IEEE C57 / DOETestingFactory Routine Testing

Engineering Documents

Padmount Spec Sheet

Padmount Dimensional Drawings

Padmount Installation Manual

Padmount Test & Warranty Guide

Certifications & Grid Compliance

Fully compliant with UL, CSA, IEEE/ANSI, DOE, and IEC standards. Tested and certified by international authorities to ensure maximum safety, efficiency, and instant approval by local power utilities.

UL/cUL

CSA

CESI

IEEE

IEC

EN00676

AS-NZS

GOST

three phase pad mounted transformer

Infrastructure Capabilities

We supply a full lineup of pad-mount transformers built for heavy-duty power. From 24/7 crypto mining farms to mission-critical data centers, we deliver reliable equipment designed to run non-stop.

We also offer custom engineering tailored to your exact site. From specific high and low voltages to specialized enclosure specs, we customize and deliver units in as fast as 4–6 weeks to get your project powered up on schedule.

Design

Raw Material Procurement

Assembly

Testing

Packaging

Delivery

Request a Project Quote

Tell us about your project or custom requirements. Our power systems engineers will review your specs and provide a tailored proposal.

Submit Inquiry ➔

Global Project References

View All >>

Reykjavik, Iceland

2550 kVA Pad-Mounted Transformer for Geothermal Data Center

High-efficiency 2550 kVA (2.55 MVA) padmount unit delivered to power a 100% green geothermal compute facility, operating reliably in cold sub-arctic climates.

11 kV Class

415Y/240V

ONAN 2550

Frankfurt, Germany

2550 kVA (2.55 MVA) Transformer for European AI Facility

Three-phase 2550 kVA pad-mounted transformer dispatched via express freight to support an enterprise AI server expansion and high-density liquid cooling loops.

2550 kVA

20 kV Class

400V / 415V

West Texas, USA

4 x 2550 kVA Transformers for Mining Park

Convoys of 2550 kVA padmount transformers dispatched simultaneously to power a utility-scale 40-foot hydro container park under extreme desert heat.

4 x 2550 kVA

34.5 kV Class

415Y/240V

Calgary, Alberta, Canada

3 x 2550 kVA Padmount Units for High-Density Compute

Heavy-duty 2550 kVA step-down transformers installed alongside a massive louvered cooling infrastructure, fully compliant with Canadian 600V/415V grids.

2550 kVA

24.94 kV

600Y / 415V

Capabilities & Support

24-Month Quality Warranty

Enjoy peace of mind with our 24-month full warranty. If any operational issue arises with your transformer, our dedicated engineering team will resolve it rapidly and reliably.

Local Field Service Team

Whether in North America or global regions, our certified local engineering teams provide professional on-site transformer installation, energization testing, and maintenance.

24/7 Remote Video Support

Connect directly with our senior power engineers via live video for real-time installation guidance, system diagnostics, and instant troubleshooting support, anytime and anywhere.

Spare Parts & Support

We maintain an extensive inventory of genuine spare parts for fast dispatch, paired with lifetime technical guidance to maximize your equipment uptime.

Need a Customized Power & Transformer Solution?

Talk to our engineers to get an optimized configuration and fast quote.

Contact Sales ➔

FAQs

Why choose a 2550 kVA transformer for a mining or data center project?

A 2550 kVA transformer is designed for larger power blocks where a standard 1000–2000 kVA transformer may limit future expansion. It provides higher power density while reducing the number of transformer units required for large deployments.

Is a 2550 kVA transformer better than using multiple smaller transformers?

It depends on the site design. A single 2550 kVA transformer can simplify medium-voltage distribution and reduce the number of primary connections.

Multiple smaller transformers may provide more flexibility for phased deployment or redundancy.

What size mining deployment can a 2550 kVA transformer support?

A 2550 kVA transformer is suitable for large mining power blocks, including multiple container deployments or high-density hydro cooling systems.

The actual number of miners depends on miner model, operating power, cooling method, and auxiliary equipment load.

Why would a project choose 2550 kVA instead of 2000 kVA?

A 2550 kVA transformer provides additional capacity for projects that are approaching the practical limit of a 2000 kVA system or expect future load growth.

It allows more room for additional mining containers, cooling equipment, or electrical expansion without replacing the main transformer.

Can a 2550 kVA transformer support future site expansion?

Yes. Large mining and data center projects often reserve transformer capacity for future growth.

Apexto evaluates current load, planned expansion, cooling infrastructure, and site layout when selecting transformer capacity.

Can Apexto configure a 2550 kVA transformer for my project voltage and distribution system?

Yes. The transformer can be configured according to project requirements, including utility voltage, secondary voltage, connection type, protection requirements, and installation conditions.

Is a 2550 kVA transformer suitable for containerized mining deployments?

Yes. A 2550 kVA transformer can serve as a centralized power source for multiple mining containers or hydro cooling systems, helping create a scalable power infrastructure for larger sites.

Recommended Capacities

Discover our full lineup of three-phase pad-mounted transformers built for projects of any scale.

View All >>

1250KVA

1250 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

1500KVA

1500 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

2000KVA

2000 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

3000KVA

3000 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

Heavy-Duty Power 2550 kVA 3-Phase Pad-Mounted Transformer

Key specifications at a glance for quick reference and confident planning.

2550 kVA

Loop / Radial

ONAN

60 Hz

Outdoor Pad-Mounted

WAREHOUSE LOCATIONS

USA • Canada • UAE • China • Global Dispatch

FAST DISPATCH

Ready Stock • Ships in 1-3 Days • DDP Door-to-Door

Product Profile

The 2550 kVA model is positioned differently from the standard 2500 kVA unit. Its focus is high-density computing and data center power architecture, where precise transformer capacity and 415V or 480V secondary distribution may be part of the electrical design.

The 2.55 MVA rating can be configured around project-specific medium-voltage input, downstream distribution voltage, impedance, monitoring, and protection requirements. It is especially relevant where transformer selection is tied closely to the power block design of the data hall or compute module.

Rather than serving as a general-purpose 2.55 MVA alternative, the 2550 kVA unit is best treated as an engineered solution for specialized high-density electrical infrastructure.

Core Advantages

2250 kVA 3-Phase Padmount Transformer Internal Structure

01. Dead-Front Dual Compartment

Features a dual-compartment design separating high and low voltage with a rigid steel barrier. Enclosed dead-front bushings ensure maximum touch safety and tamper protection.

2250 kVA 3-Phase Padmount Transformer Dual-Source Control Panel

02. Multi-Tier Fuse & Switch Bay

Integrates accessible Bay-O-Net fuses with a four-position load-break switch (Source A/B) and a tap changer, ensuring instant fault isolation and safe power transfer.

2250 kVA 3-Phase Padmount Transformer Monitoring Panel

03. Comprehensive Gauge Suite

Equipped with precision dial thermometer, pressure/vacuum, and oil level gauges alongside an automatic pressure relief valve (PRV) for continuous operational safety.

2250 kVA 3-Phase Padmount Transformer Cooling Control Cabinet

04. Auxiliary Control Cabinet

Houses neatly organized DIN-rail circuit breakers, terminal blocks, a power supply, and convenience outlet, simplifying secondary control wiring and field testing.

2250 kVA 3-Phase Padmount Transformer Forced-Air Cooling System

05. High-Conductivity LV Busbars

Fitted with heavy-duty tin-plated NEMA spade terminals (X0–X3) designed for high current capacity, minimizing contact resistance and easing multi-cable connections.

2250 kVA 3-Phase Padmount Transformer Low-Voltage Spade Bushings

06. C5-M Enclosure & Cooling Fans

Protected by a C5-M marine-grade steel enclosure with large cooling radiator banks and auxiliary forced-air fans, engineered for non-stop duty in harsh environments.

Full Specifications

External dimensions

L:2500mm、W:2000mm、H:2300mm

Internal dimensions

L:2450mm、W:1950mm、H:2350mm

Weight

6000KG

Rated Capacity2550 kVA / 2.55 MVAPhaseThree Phase
Frequency60 HzPrimary VoltageCustomized (Typical 12.47kV / 13.8kV / 24.94kV / 34.5kV)
Secondary VoltageCustomized (Typical 480Y/277V)Winding ConfigurationDelta - Wye / Grounded Wye (Project Specific)
Winding MaterialCopper / Aluminum AvailableCooling TypeONAN
Insulation FluidMineral OilTemperature Rise65°C
ImpedanceTypical 5.75%BIL RatingAccording to Voltage Class
Vector GroupDyn1 / CustomizedTap ChangerOff-Circuit Tap Changer
StandardsANSI / IEEE C57 / DOETestingFactory Routine Testing

Engineering Documents

Padmount Spec Sheet

Padmount Dimensional Drawings

Padmount Installation Manual

Padmount Test & Warranty Guide

Certifications & Grid Compliance

Fully compliant with UL, CSA, IEEE/ANSI, DOE, and IEC standards. Tested and certified by international authorities to ensure maximum safety, efficiency, and instant approval by local power utilities.

UL/cUL

CSA

CESI

IEEE

IEC

EN00676

AS-NZS

GOST

three phase pad mounted transformer

Infrastructure Capabilities

We supply a full lineup of pad-mount transformers built for heavy-duty power. From 24/7 crypto mining farms to mission-critical data centers, we deliver reliable equipment designed to run non-stop.

We also offer custom engineering tailored to your exact site. From specific high and low voltages to specialized enclosure specs, we customize and deliver units in as fast as 4–6 weeks to get your project powered up on schedule.

Request a Project Quote

Tell us about your project or custom requirements. Our power systems engineers will review your specs and provide a tailored proposal.

Submit Inquiry ➔

Global Project References

View All >>

2550 kVA Pad-Mounted Transformer for Geothermal Data Center

High-efficiency 2550 kVA (2.55 MVA) padmount unit delivered to power a 100% green geothermal compute facility, operating reliably in cold sub-arctic climates.

11 kV Class

415Y/240V

ONAN 2550

2550 kVA (2.55 MVA) Transformer for European AI Facility

Three-phase 2550 kVA pad-mounted transformer dispatched via express freight to support an enterprise AI server expansion and high-density liquid cooling loops.

2550 kVA

20 kV Class

400V / 415V

4 x 2550 kVA Transformers for Mining Park

Convoys of 2550 kVA padmount transformers dispatched simultaneously to power a utility-scale 40-foot hydro container park under extreme desert heat.

4 x 2550 kVA

34.5 kV Class

415Y/240V

3 x 2550 kVA Padmount Units for High-Density Compute

Heavy-duty 2550 kVA step-down transformers installed alongside a massive louvered cooling infrastructure, fully compliant with Canadian 600V/415V grids.

2550 kVA

24.94 kV

600Y / 415V

Capabilities & Support

24-Month Quality Warranty

Enjoy peace of mind with our 24-month full warranty. If any operational issue arises with your transformer, our dedicated engineering team will resolve it rapidly and reliably.

Local Field Service Team

Whether in North America or global regions, our certified local engineering teams provide professional on-site transformer installation, energization testing, and maintenance.

24/7 Remote Video Support

Connect directly with our senior power engineers via live video for real-time installation guidance, system diagnostics, and instant troubleshooting support, anytime and anywhere.

Spare Parts & Support

We maintain an extensive inventory of genuine spare parts for fast dispatch, paired with lifetime technical guidance to maximize your equipment uptime.

Need a Customized Power & Transformer Solution?

Talk to our engineers to get an optimized configuration and fast quote.

Contact Sales ➔

FAQs

A 2550 kVA transformer is designed for larger power blocks where a standard 1000–2000 kVA transformer may limit future expansion. It provides higher power density while reducing the number of transformer units required for large deployments.

It depends on the site design. A single 2550 kVA transformer can simplify medium-voltage distribution and reduce the number of primary connections.

Multiple smaller transformers may provide more flexibility for phased deployment or redundancy.

A 2550 kVA transformer is suitable for large mining power blocks, including multiple container deployments or high-density hydro cooling systems.

The actual number of miners depends on miner model, operating power, cooling method, and auxiliary equipment load.

A 2550 kVA transformer provides additional capacity for projects that are approaching the practical limit of a 2000 kVA system or expect future load growth.

It allows more room for additional mining containers, cooling equipment, or electrical expansion without replacing the main transformer.

Yes. Large mining and data center projects often reserve transformer capacity for future growth.

Apexto evaluates current load, planned expansion, cooling infrastructure, and site layout when selecting transformer capacity.

Yes. The transformer can be configured according to project requirements, including utility voltage, secondary voltage, connection type, protection requirements, and installation conditions.

Yes. A 2550 kVA transformer can serve as a centralized power source for multiple mining containers or hydro cooling systems, helping create a scalable power infrastructure for larger sites.

Recommended Capacities

Discover our full lineup of three-phase pad-mounted transformers built for projects of any scale.

View All >>

1250KVA

1250 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

1500KVA

1500 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

2000KVA

2000 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

3000KVA

3000 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

Customize Your Power Solution

Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.

Project Timeline

In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.

Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.

Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.

International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.

*All sales are final and non-refundable. Please understand, this is an industry standard.

Recommended Devices