
13-Slot 143kW Antminer 3U Hydro Cooling Rack
In stock
$12,200.00
2.16MW 40HQ hydro container with 180 slots for Antminer 3U units. Enterprise-grade infrastructure optimized for maximum power density and large-scale deployment.
Contact us for price
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available

293 Th/s · 19 J/Th
180 Slots
Full‑load: $1,933.20/day

473 Th/s · 12 J/Th
180 Slots
Full‑load: $3,119.40/day

358 Th/s · 15 J/Th
180 Slots
Full‑load: $2,361.60/day

310 Th/s · 17 J/Th
180 Slots
Full‑load: $2,044.80/day

580 Th/s · 9.5 J/Th
180 Slots
Full‑load: $3,825.00/day
Optimized for maximum power density, the 2.16MW 180-Slot Antminer 3U Hydro Cooling Container 40FT HQ features a high-load, reinforced server cabinet system engineered for dense blade-style setups.
This enterprise-grade liquid cooling infrastructure packs 180 3U hydro ASICs into a single 40-foot frame, doubling hash rate capacity through an extremely organized vertical stacking layout with streamlined water and cable routing.
It utilizes advanced, large-diameter manifolds and intelligent CDU monitoring to manage a massive 2160kW load while ensuring uniform water pressure and stable operations. Ideal for institutional mining enterprises, this space-saving container minimizes land overhead while maximizing high-density hashing yield and overall capital investment return per square meter.

Utilizes highly organized vertical cable and water routing channels, preventing any fluid or electrical line interference within the container’s tightly compressed, high-density internal layout.
Equipped with advanced, large-diameter stainless steel manifolds, ensuring balanced flow rates and uniform water pressure to manage a massive 2160kW thermal load safely and efficiently.
Features floor-mounted, highly sensitive moisture ropes that instantly detect coolant leaks in high-density areas, triggering automatic power cutoffs to protect your valuable ASIC hardware from damage.
Integrates an intelligent management system to continuously monitor PUE, flow rates, and temperatures, delivering automated malfunction alerts and precise remote system self-regulation under heavy thermal loads.
Squeezes 180 3U hydro slots and handles a massive 2.16MW load within a single 40FT HQ frame, maximizing high-density hashing output and profitability per square meter.
Features heavy-duty, reinforced server racks engineered specifically to withstand the extreme structural weight and physical stresses of 180 stacked 3U mining units under continuous load.
Utilizes highly organized vertical cable and water routing channels, preventing any fluid or electrical line interference within the container’s tightly compressed, high-density internal layout.
Equipped with advanced, large-diameter stainless steel manifolds, ensuring balanced flow rates and uniform water pressure to manage a massive 2160kW thermal load safely and efficiently.
Features floor-mounted, highly sensitive moisture ropes that instantly detect coolant leaks in high-density areas, triggering automatic power cutoffs to protect your valuable ASIC hardware from damage.
Integrates an intelligent management system to continuously monitor PUE, flow rates, and temperatures, delivering automated malfunction alerts and precise remote system self-regulation under heavy thermal loads.
Squeezes 180 3U hydro slots and handles a massive 2.16MW load within a single 40FT HQ frame, maximizing high-density hashing output and profitability per square meter.
Features heavy-duty, reinforced server racks engineered specifically to withstand the extreme structural weight and physical stresses of 180 stacked 3U mining units under continuous load.
Utilizes highly organized vertical cable and water routing channels, preventing any fluid or electrical line interference within the container’s tightly compressed, high-density internal layout.
Equipped with advanced, large-diameter stainless steel manifolds, ensuring balanced flow rates and uniform water pressure to manage a massive 2160kW thermal load safely and efficiently.
Full Specifications
12192mm、W:2438mm、H:2896mm
12000mm、W:2230mm、H:2660mm
10040KG
| Model | AP-HC40-A3U180 | Installed capacity | 180 seat |
| Total Installed Power | 2157 KW | Operating Current | 3125.3 A |
| Unit Power | 9400W ±5% | Power Control Box | Group A 1580A |
| PLC Control Cabinet | 113 kW | Fan Control Cabinet | 94.68 kW |
| Heat Dissipation Capacity | >2400 kW | Air Flow Volume | 625000 m³/h |
| Air Passage Area | 52.578 m² | Constant Temperature Mode | Variable Frequency AC Fan + Stepwise Regulation |
| Pump Power | 34 kW ×1 | Water Pump Flow | 170.0 m³/h |
| Operating Ambient Temperature | -15℃ ~ 30℃ | Environmental Adaptability | -20℃ ~ 45℃ |
| Miner Container Weight | 10040 kg | Dry Cooler Weight | 10160 kg |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
Match your container deployment with the appropriate transformer capacity.
Get Transformer Recommendation →
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 143 kW |
| 13 Slots |
| 850 mm × 1000 mm × 2130 mm |
| Compact Indoor & Office Racks |

| 1.1 MW |
| 90 Slots |
| 12192 × 2438 × 2896 mm |
| Commercial-Scale Mining |

| 1.25 MW |
| 104 Slots |
| 12192 × 2438 × 2896 mm |
| Mid-to-Large Mining Farms |
Compare

| 2.16 MW |
| 180 Slots |
| 12192 × 2438 × 2896 mm |
| Industrial-Scale Operations |
Which Bitmain ASIC models are compatible with this Hydro Cooling Container?
This 2.16MW Hydro Container is custom-engineered for Bitmain's 3U ASICs, supporting high-density setups of the Antminer S19 XP Hyd 3U, Antminer S21e XP Hyd 3U, and Antminer S23 Hyd 3U models.
How does the 2.16MW power load of this 180-Slot container integrate with the site’s transformer and power grid?
Designed for heavy-duty utility grids, this container connects seamlessly to a single 2500kVA transformer. The integrated enterprise-grade power cabinets handle the full 2160kW load safely through optimized cabling terminals.
How does this 180-Slot high-density design improve the overall capital efficiency (ROI) of megawatt-scale farms?
Squeezing 2.16MW into a single 40FT container significantly lowers land lease expenses, drastically reduces on-site cabling infrastructure, and minimizes per-megawatt O&M overhead, accelerating your overall BTC mining payback period.
How does the vertical cabinet design facilitate safe hot-swapping and routine maintenance for 180 stacked 3U miners?
It integrates reinforced vertical shelving engineered for 3U server chassis, allowing technicians to smoothly slide individual nodes out for hot-swapping or routine inspections without disrupting other operational units.
What built-in safety mechanisms are integrated to protect the 180 valuable 3U mining servers?
It integrates dual-pump redundancy for continuous flow, floor-mounted moisture-sensing ropes, and automated system monitoring to trigger instant remote alerts and automatic power cutoffs during any coolant leaks or thermal anomalies.
CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available
Show 1 more models
Optimized for maximum power density, the 2.16MW 180-Slot Antminer 3U Hydro Cooling Container 40FT HQ features a high-load, reinforced server cabinet system engineered for dense blade-style setups.
This enterprise-grade liquid cooling infrastructure packs 180 3U hydro ASICs into a single 40-foot frame, doubling hash rate capacity through an extremely organized vertical stacking layout with streamlined water and cable routing.
It utilizes advanced, large-diameter manifolds and intelligent CDU monitoring to manage a massive 2160kW load while ensuring uniform water pressure and stable operations. Ideal for institutional mining enterprises, this space-saving container minimizes land overhead while maximizing high-density hashing yield and overall capital investment return per square meter.

Core Advantages
Utilizes highly organized vertical cable and water routing channels, preventing any fluid or electrical line interference within the container’s tightly compressed, high-density internal layout.
Equipped with advanced, large-diameter stainless steel manifolds, ensuring balanced flow rates and uniform water pressure to manage a massive 2160kW thermal load safely and efficiently.
Features floor-mounted, highly sensitive moisture ropes that instantly detect coolant leaks in high-density areas, triggering automatic power cutoffs to protect your valuable ASIC hardware from damage.
Integrates an intelligent management system to continuously monitor PUE, flow rates, and temperatures, delivering automated malfunction alerts and precise remote system self-regulation under heavy thermal loads.
Squeezes 180 3U hydro slots and handles a massive 2.16MW load within a single 40FT HQ frame, maximizing high-density hashing output and profitability per square meter.
Features heavy-duty, reinforced server racks engineered specifically to withstand the extreme structural weight and physical stresses of 180 stacked 3U mining units under continuous load.
Utilizes highly organized vertical cable and water routing channels, preventing any fluid or electrical line interference within the container’s tightly compressed, high-density internal layout.
Equipped with advanced, large-diameter stainless steel manifolds, ensuring balanced flow rates and uniform water pressure to manage a massive 2160kW thermal load safely and efficiently.
Features floor-mounted, highly sensitive moisture ropes that instantly detect coolant leaks in high-density areas, triggering automatic power cutoffs to protect your valuable ASIC hardware from damage.
Integrates an intelligent management system to continuously monitor PUE, flow rates, and temperatures, delivering automated malfunction alerts and precise remote system self-regulation under heavy thermal loads.
Squeezes 180 3U hydro slots and handles a massive 2.16MW load within a single 40FT HQ frame, maximizing high-density hashing output and profitability per square meter.
Features heavy-duty, reinforced server racks engineered specifically to withstand the extreme structural weight and physical stresses of 180 stacked 3U mining units under continuous load.
Utilizes highly organized vertical cable and water routing channels, preventing any fluid or electrical line interference within the container’s tightly compressed, high-density internal layout.
Equipped with advanced, large-diameter stainless steel manifolds, ensuring balanced flow rates and uniform water pressure to manage a massive 2160kW thermal load safely and efficiently.
Full Specifications
12192mm、W:2438mm、H:2896mm
12000mm、W:2230mm、H:2660mm
10040KG
| Model | AP-HC40-A3U180 | Installed capacity | 180 seat |
| Total Installed Power | 2157 KW | Operating Current | 3125.3 A |
| Unit Power | 9400W ±5% | Power Control Box | Group A 1580A |
| PLC Control Cabinet | 113 kW | Fan Control Cabinet | 94.68 kW |
| Heat Dissipation Capacity | >2400 kW | Air Flow Volume | 625000 m³/h |
| Air Passage Area | 52.578 m² | Constant Temperature Mode | Variable Frequency AC Fan + Stepwise Regulation |
| Pump Power | 34 kW ×1 | Water Pump Flow | 170.0 m³/h |
| Operating Ambient Temperature | -15℃ ~ 30℃ | Environmental Adaptability | -20℃ ~ 45℃ |
| Miner Container Weight | 10040 kg | Dry Cooler Weight | 10160 kg |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
Match your container deployment with the appropriate transformer capacity.
Get Transformer Recommendation →
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 143 kW |
| 13 Slots |
| 850 mm × 1000 mm × 2130 mm |
| Compact Indoor & Office Racks |

| 1.1 MW |
| 90 Slots |
| 12192 × 2438 × 2896 mm |
| Commercial-Scale Mining |

| 1.25 MW |
| 104 Slots |
| 12192 × 2438 × 2896 mm |
| Mid-to-Large Mining Farms |
Compare

| 2.16 MW |
| 180 Slots |
| 12192 × 2438 × 2896 mm |
| Industrial-Scale Operations |
This 2.16MW Hydro Container is custom-engineered for Bitmain's 3U ASICs, supporting high-density setups of the Antminer S19 XP Hyd 3U, Antminer S21e XP Hyd 3U, and Antminer S23 Hyd 3U models.
Designed for heavy-duty utility grids, this container connects seamlessly to a single 2500kVA transformer. The integrated enterprise-grade power cabinets handle the full 2160kW load safely through optimized cabling terminals.
It integrates dual-pump redundancy for continuous flow, floor-mounted moisture-sensing ropes, and automated system monitoring to trigger instant remote alerts and automatic power cutoffs during any coolant leaks or thermal anomalies.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop