Project Description
An industrial operator in Atlanta, Georgia, secured 28.8MW of grid capacity to host 5,040 Antminer hydro ASICs. To eliminate high on-site electrical labor costs and yard constraints, we delivered 12 units of our 2.4MW 420-Slot Antminer Hydro Cooling Container 40FT HQ. Each turnkey bitcoin mining container incorporates roof-stacked dry coolers, avoiding separate radiator fields and maximizing pad efficiency.
To speed installation, all internal power distribution and large-diameter stainless manifolds arrived pre-wired and factory-tested. Balanced internal CDU circulation maintains equal pressure across all 420 slots under full load. Crane crews mounted the integrated dry cooler decks directly onto container roofs, cutting on-site deployment time by 30% without complex field wiring.
Operating at continuous full load, the facility delivers a measured 32% increase in cooling efficiency compared to standard air-cooled retrofits. Eliminating external radiator piping and utilizing intelligent hydronic balancing reduced thermal throttling across all 5,040 active miners, generating over $1.5M in annual operational savings for the enterprise operator.