25.5MW Water-Cooled Bitcoin Mining Facility in Tashkent, Uzbekistan

Posted by Ada · On

25.5MW Water-Cooled Bitcoin Mining Facility in Tashkent, Uzbekistan

Project Description

Located directly beside a high-voltage substation in Tashkent, Uzbekistan, we deployed a 25.5MW water-cooled bitcoin mining facility across 15 units of our 1.7MW 308-Slot Antminer Hydro Cooling Container 40FT HQ. Housing 4,620 active ASICs, the setup incorporates custom overhead shade canopies to shield external cooling banks from intense Central Asian solar radiation.

Distributing fluid across 15 megawatt-scale containers required custom hydraulic manifolds to maintain stable loop pressure without flow decay. Each enclosure utilizes oversized stainless steel internal headers and smart balance valves, ensuring equal coolant delivery across every 308-slot bay. Factory pre-wiring allowed our engineering crews to complete substation tie-ins and site-wide mechanical commissioning in under 10 weeks.

Operating continuously through Tashkent’s dry 42°C (108°F) summers, the plant sustains equalized fluid distribution across all 4,620 miners without flow degradation or thermal throttling. The combined shade-cooler architecture maintains an operating PUE below 1.04, delivering steady full-load hash output across the entire 25.5MW load.

About Ada

I am a Data Analyst at Apexto Mining, with experience in the cryptocurrency mining industry since 2017. My work focuses on analyzing ASIC performance, thermal efficiency, and mining profitability, especially in hydro and immersion cooling environments. I contribute to technical research and content creation, including blog articles and educational materials on mining hardware and infrastructure optimization.