
20-Slot 200kW Antminer 2U Hydro Cooling System
In stock

Designed for Whatsminer hydro miners, this hydro cooling cabinet supports 20 M53, M63, or M73 units as an integrated all-in-one cooling and deployment solution with a 200kW cooling capacity.
$11,820.00 – $12,800.00
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available

230 Th/s · 29 J/Th
20 Slots
Full‑load: $169.60/day

260 Th/s · 26 J/Th
20 Slots
Full‑load: $191.60/day

300 Th/s · 22.8 J/Th
20 Slots
Full‑load: $221.20/day

320 Th/s · 22 J/Th
20 Slots
Full‑load: $236.00/day

366 Th/s · 19.9 J/Th
20 Slots
Full‑load: $269.80/day

390 Th/s · 18.5 J/Th
20 Slots
Full‑load: $287.60/day

424 Th/s · 15.5 J/Th
20 Slots
Full‑load: $312.60/day

540 Th/s · 17 J/Th
20 Slots
Full‑load: $398.20/day

592 Th/s · 15.5 J/Th
20 Slots
Full‑load: $436.40/day

526 Th/s · 14.5 J/Th
20 Slots
Full‑load: $387.80/day

552 Th/s · 13.5 J/Th
20 Slots
Full‑load: $407.00/day

592 Th/s · 15.5 J/Th
20 Slots
Full‑load: $436.40/day

680 Th/s · 13.5 J/Th
20 Slots
Full‑load: $501.40/day
Designed for professional WhatsMiner 2U hydro mining deployments, this 20-slot 200kW integrated hydro cooling rack combines miner installation, liquid cooling, and heat management into one complete solution.
The all-in-one cabinet design simplifies deployment by integrating key cooling components into a compact structure, reducing installation complexity and improving space utilization. With a plug-and-play design, users can quickly connect power and complete basic setup for efficient mining operation. The dedicated liquid circulation system and optimized thermal management provide stable cooling performance for continuous workloads.
Suitable for home mining, warehouses, and indoor deployment environments with available space, this integrated hydro cooling rack offers a compact and efficient solution for operators seeking a convenient way to deploy multiple ASIC miners with minimal installation requirements.
Core Advantages

The rack features 20 dedicated 2U slots with a specialized manifold system. Every miner has its own water connection points, ensuring a perfect fit and even liquid distribution for stable cooling during hashing daily.

The power cabinet features neatly organized wiring and utilizes UL-compliant components to meet safety standards. This clean layout simplifies troubleshooting and ensures long-term fire safety for your facility now.

Every slot has its own power switch and breaker. This one-miner, one-control design allows you to turn off a single machine for maintenance without stopping the rest of the rack, maximizing your overall mining uptime now.

A moisture-sensing rope is installed at the bottom to detect any coolant leaks. If fluid is found, the system triggers an instant alert, protecting your hardware from water damage and keeping your facility safe daily now.

The CDU includes a heavy-duty pump, expansion tank, and heat exchanger. It maintains stable pressure and circulation, moving the 200kW heat load from the miners to the outside radiator for continuous thermal balance now.

The PLC system monitors data automatically and can be customized for your site needs. The clear HMI screen shows all real-time pressure and temperature, ensuring safe and efficient system operation at all times now.
Full Specifications
L:1460mm、W:1000mm、H:2200mm
L:1410mm、W:950mm、H:2150mm
500KG
| Model | AP-M20 | Installed capacity | 20 Seat |
| Installed powerload | 200 kW | Power of the light-duty vertical multistage pump | 4 kW |
| Power of the fluid replenishing pump | 0.2 kW | Total power of the dry cooling tower fan | 8.3 kW |
| Total power of the closed cooling tower fan | 3 kW | Total power of the closed cooling tower spray pump | 1.1 kW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 0-50 ℃ |
| Coolant circulation demand of a single machine | ≥0.6 m³/h | Total demand for circulating coolant within the system | ≥0.25 m³ |
| Residual Current Circuit Breaker | 400 A | Contactor | 9 A |
| Intermediate relay | 24 V | CUL certified frequency converter | 380 V |

Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 120 kW |
| 12 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Home & Professional Offices |
Compare

| 200 kW |
| 20 Slots |
| 1,460 × 1,000 × 2,200 mm |
| Mid-Sized Mining Clusters |

| 1.6 MW |
| 160 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Industrial Scale Facilities |

| 2.4 MW |
| 240 Slots |
| 1,3716 × 2,438 × 2,896 mm |
| Enterprise Mega Infrastructure |
Can this rack support 20 overclocked WhatsMiner Hydro miners?
Yes. The rack is designed for high-power and overclocked WhatsMiner M53, M63, and M73 Hydro deployments, with up to 200kW of total miner load.
WhatsMiner Hydro miners in these series can reach approximately 10kW per unit in high-performance operation, making this 200kW rack suitable for a fully populated 20-miner overclocking setup.
Does the 200kW rating mean every miner slot is limited to 10kW?
No. The 200kW rating refers to the total miner load of the complete rack, not a fixed 10kW limit for each individual position.
This allows the rack to accommodate different compatible WhatsMiner models or operating modes, as long as the combined miner load remains within the system's 200kW design capacity.
How does the system maintain enough coolant flow for all 20 miners?
The rack provides a rated circulation flow of 13m³/h, with a minimum coolant circulation requirement of 0.6m³/h per miner.
For 20 miners, the minimum combined requirement is approximately 12m³/h. The rack uses an automatic pressure-regulating pump and PLC constant-flow control to maintain stable circulation across the system.
Will a problem with one miner affect the entire 20-miner rack?
No. Each miner position is individually managed, so one miner can be taken offline for inspection or maintenance without treating the entire rack as a single operating unit.
This design helps reduce unnecessary downtime and makes a 20-miner deployment easier to operate and service.
What happens if coolant temperature, flow, pressure, or network conditions become abnormal?
The rack uses PLC-based 24/7 monitoring to track key operating conditions including power, temperature, coolant flow, pressure, and network status.
Abnormal conditions can be detected centrally, allowing operators to identify and respond to cooling or system issues before they develop into wider rack-level problems.
How much on-site piping work is required during installation?
The rack is supplied as an integrated cooling system with factory-prepared piping, valves, power components, and the required quick-connect interfaces.
The corresponding quick connectors are prepared before shipment, allowing compatible WhatsMiner Hydro miners to connect directly to the rack's coolant supply and return lines and reducing additional field plumbing work.
For a 200kW rack, should I use a dry cooler or a closed cooling tower?
For most single-rack 200kW deployments, a matched 200kW dry cooler is a practical choice when simple installation, low water consumption, and lower routine water-system maintenance are priorities. The rack can also be configured with a closed cooling tower.
For hotter climates or larger multi-rack sites where evaporative heat rejection provides an operational advantage, a closed cooling tower can be considered as part of the centralized cooling design. Dry coolers are generally preferred when water conservation and reduced maintenance are the main priorities.
Can I expand from one 200kW rack to a 1MW mining deployment?
Yes. The rack format is suitable for modular mining-farm expansion.
Five 200kW racks represent approximately 1MW of installed miner capacity. If future expansion is planned from the beginning, the site can reserve sufficient electrical capacity, main piping, heat-rejection capacity, installation space, and centralized monitoring interfaces so additional racks can be added without rebuilding the entire infrastructure.
CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available
Show 9 more models
Designed for professional WhatsMiner 2U hydro mining deployments, this 20-slot 200kW integrated hydro cooling rack combines miner installation, liquid cooling, and heat management into one complete solution.
The all-in-one cabinet design simplifies deployment by integrating key cooling components into a compact structure, reducing installation complexity and improving space utilization. With a plug-and-play design, users can quickly connect power and complete basic setup for efficient mining operation. The dedicated liquid circulation system and optimized thermal management provide stable cooling performance for continuous workloads.
Suitable for home mining, warehouses, and indoor deployment environments with available space, this integrated hydro cooling rack offers a compact and efficient solution for operators seeking a convenient way to deploy multiple ASIC miners with minimal installation requirements.
Core Advantages

The rack features 20 dedicated 2U slots with a specialized manifold system. Every miner has its own water connection points, ensuring a perfect fit and even liquid distribution for stable cooling during hashing daily.

The power cabinet features neatly organized wiring and utilizes UL-compliant components to meet safety standards. This clean layout simplifies troubleshooting and ensures long-term fire safety for your facility now.

Every slot has its own power switch and breaker. This one-miner, one-control design allows you to turn off a single machine for maintenance without stopping the rest of the rack, maximizing your overall mining uptime now.

A moisture-sensing rope is installed at the bottom to detect any coolant leaks. If fluid is found, the system triggers an instant alert, protecting your hardware from water damage and keeping your facility safe daily now.

The CDU includes a heavy-duty pump, expansion tank, and heat exchanger. It maintains stable pressure and circulation, moving the 200kW heat load from the miners to the outside radiator for continuous thermal balance now.

The PLC system monitors data automatically and can be customized for your site needs. The clear HMI screen shows all real-time pressure and temperature, ensuring safe and efficient system operation at all times now.
Full Specifications
L:1460mm、W:1000mm、H:2200mm
L:1410mm、W:950mm、H:2150mm
500KG
| Model | AP-M20 | Installed capacity | 20 Seat |
| Installed powerload | 200 kW | Power of the light-duty vertical multistage pump | 4 kW |
| Power of the fluid replenishing pump | 0.2 kW | Total power of the dry cooling tower fan | 8.3 kW |
| Total power of the closed cooling tower fan | 3 kW | Total power of the closed cooling tower spray pump | 1.1 kW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 0-50 ℃ |
| Coolant circulation demand of a single machine | ≥0.6 m³/h | Total demand for circulating coolant within the system | ≥0.25 m³ |
| Residual Current Circuit Breaker | 400 A | Contactor | 9 A |
| Intermediate relay | 24 V | CUL certified frequency converter | 380 V |

Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 120 kW |
| 12 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Home & Professional Offices |
Compare

| 200 kW |
| 20 Slots |
| 1,460 × 1,000 × 2,200 mm |
| Mid-Sized Mining Clusters |

| 1.6 MW |
| 160 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Industrial Scale Facilities |

| 2.4 MW |
| 240 Slots |
| 1,3716 × 2,438 × 2,896 mm |
| Enterprise Mega Infrastructure |
Yes. The rack is designed for high-power and overclocked WhatsMiner M53, M63, and M73 Hydro deployments, with up to 200kW of total miner load.
WhatsMiner Hydro miners in these series can reach approximately 10kW per unit in high-performance operation, making this 200kW rack suitable for a fully populated 20-miner overclocking setup.
No. The 200kW rating refers to the total miner load of the complete rack, not a fixed 10kW limit for each individual position.
This allows the rack to accommodate different compatible WhatsMiner models or operating modes, as long as the combined miner load remains within the system's 200kW design capacity.
The rack provides a rated circulation flow of 13m³/h, with a minimum coolant circulation requirement of 0.6m³/h per miner.
For 20 miners, the minimum combined requirement is approximately 12m³/h. The rack uses an automatic pressure-regulating pump and PLC constant-flow control to maintain stable circulation across the system.
No. Each miner position is individually managed, so one miner can be taken offline for inspection or maintenance without treating the entire rack as a single operating unit.
This design helps reduce unnecessary downtime and makes a 20-miner deployment easier to operate and service.
The rack uses PLC-based 24/7 monitoring to track key operating conditions including power, temperature, coolant flow, pressure, and network status.
Abnormal conditions can be detected centrally, allowing operators to identify and respond to cooling or system issues before they develop into wider rack-level problems.
The rack is supplied as an integrated cooling system with factory-prepared piping, valves, power components, and the required quick-connect interfaces.
The corresponding quick connectors are prepared before shipment, allowing compatible WhatsMiner Hydro miners to connect directly to the rack's coolant supply and return lines and reducing additional field plumbing work.
For most single-rack 200kW deployments, a matched 200kW dry cooler is a practical choice when simple installation, low water consumption, and lower routine water-system maintenance are priorities. The rack can also be configured with a closed cooling tower.
For hotter climates or larger multi-rack sites where evaporative heat rejection provides an operational advantage, a closed cooling tower can be considered as part of the centralized cooling design. Dry coolers are generally preferred when water conservation and reduced maintenance are the main priorities.
Yes. The rack format is suitable for modular mining-farm expansion.
Five 200kW racks represent approximately 1MW of installed miner capacity. If future expansion is planned from the beginning, the site can reserve sufficient electrical capacity, main piping, heat-rejection capacity, installation space, and centralized monitoring interfaces so additional racks can be added without rebuilding the entire infrastructure.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop