
20-Slot 200kW Antminer 2U Hydro Cooling System
In stock

This hydro cooling rack delivers 200kW capacity, supporting up to 36 Antminer S19/S21/S23 hydro miners, with optional heat recovery for Bitcoin mining.
$15,500.00 – $18,000.00
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available

257 Th/s · 20.6 J/Th
36 Slots
Full‑load: $337.68/day

198 Th/s · 27.5 J/Th
36 Slots
Full‑load: $259.92/day

293 Th/s · 19 J/Th
36 Slots
Full‑load: $384.84/day

251 Th/s · 22 J/Th
36 Slots
Full‑load: $329.76/day

335 Th/s · 16 J/Th
36 Slots
Full‑load: $439.92/day

473 Th/s · 12 J/Th
36 Slots
Full‑load: $621.36/day

500 Th/s · 11 J/Th
36 Slots
Full‑load: $656.64/day

358 Th/s · 15 J/Th
36 Slots
Full‑load: $470.16/day

430 Th/s · 13 J/Th
36 Slots
Full‑load: $564.84/day

495 Th/s · 12 J/Th
36 Slots
Full‑load: $650.16/day

580 Th/s · 9.5 J/Th
36 Slots
Full‑load: $761.76/day
The 200kW 36-Slot Hydro Cooling Cabinet is an industrial infrastructure designed for high-density Antminer hydro deployments. Standing 2.1 meters tall, it delivers a steady 200kW cooling capacity, offering a professional solution for mining operations that require consistent thermal management.
The dual-section layout separates the 36-slot miner rack on the left from the CDU and power control hub on the right. This organization ensures efficient plumbing and easier maintenance, keeping the overall setup clean and accessible. The right-hand section centralizes the pump, air switches, and system management in one protected enclosure.
Additionally, the system supports heat recovery, allowing waste heat to be repurposed for residential or agricultural heating. It is a practical, eco-friendly choice for operators looking to maximize energy efficiency and stability in a high-capacity liquid cooling environment.
Core Advantages

The system integrates the high-density rack and 200kW dry cooler into a unified infrastructure. This professional configuration ensures rapid deployment and high-capacity thermal management for large-scale, professional mining projects.

Features a dedicated Cooling Distribution Unit (CDU) that manages fluid flow across all 36 slots. The organized internal plumbing ensures uniform pressure and temperature, preventing heat accumulation within the modular cabinet.

Equipped with a high-performance water pump designed for heavy-load, continuous operation. It maintains a steady flow rate throughout the 200kW loop, ensuring reliable and efficient heat transfer from the hardware to the radiator.

Engineered to international safety standards, the power cabinet features six industrial air switches for individual group control. With UL-compliant components, it provides dedicated over-current protection and ensures isolated circuit stability.

An integrated control panel provides real-time monitoring of system temperature, pressure, and flow rates. The automated management system optimizes cooling performance and pump speeds based on live data to ensure peak hardware stability.

The 200kW dry cooler effectively dissipates heat while supporting advanced heat recovery. Repurposing waste heat for residential or agricultural heating significantly reduces operational energy costs and improves the overall sustainability of your farm.
Full Specifications
L:1740mm、W:550mm、H:2197mm
L:1740mm、W:550mm、H:2197mm
1300KG
| Model | AP-A36 | Installed capacity | 36 Seat |
| System Power Load (MAX) | 226 kW | Input Voltage | 3-Phase 380V-415V, 50/60Hz |
| Network | 1000M Network Switch*2 | Operation Temperature | -25 ~ 35℃ |
| Operating Humidity | 5%~95%RH | Water Manifold | 304 Stainless Steel |
| Hose | PE/PTFE Hose + Quick Connects | Cooling Capacity | 200kW |
| Water Pump Power | 3.5 kW | Cooling Medium | Pure water/Soften water + Antifreeze + Corrosion Inhibitor |
| Inlet/Outlet | 10°C (Normal) / 14°C (High Performance) | Rated Flow Rate | 20 m³/h |
| PLC System | Constant flow control with pressure regulation | Communication Method | Modbus-RTU,TCP/IP |
| Dry Cooler | |||
| Module | Dry Cooler V Type | Cooling Capacity | 200 kW |
| FANs | 2 | Connection | DN50 |
| Inlet/Outlet Temperature | 55℃/40℃ | Ambient temperature | 35℃ |
| Fin/Tube Materials | 304 Stainless steel,Al-mg/AI | Operating/Maximum Pressure | 0.3 MPA / 1.6 MPA |
| Dry Cooler Dimension | 2792 (L) mm × 1500 (W) mm × 1853 (H) mm | CDU Dimension | 1027 (L) mm × 700 (W) mm × 1915 (H) mm |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 154 kW |
| 28 Slots |
| 1,750 × 1,000 × 2,200 mm |
| Home & Personal Mining |

| 200 kW |
| 34 Slots |
| 1,350 × 8,00 × 2,250 mm |
| Small-Scale Mining Sites |
Compare

| 200 kW |
| 36 Slots |
| 2,230 × 8,00 × 2,370 mm |
| Professional Mining Facilities |

| 230 kW |
| 40 Slots |
| 2,500 × 1,200 × 2,640 mm |
| Mid-Scale Industrial Deployment |
View All >>

Adapting solar-hydro scaling while isolating miners from heavy agricultural dust.
Future Scalability
Noise Reduction

Maximizing indoor density with integrated heat recovery for winter facility heating.
Space Required
Setup Time
Heating Costs
“
"Managing our solar-powered site with these cabinets has been incredibly efficient. The modular setup allowed us to start with our current 2MW power limit and gives us the perfect path to scale up and add more units as our solar array expands to 3.2MW next year."
— Farm Owner, Hamburg Mining Site
"We maximized our warehouse capacity without needing expensive outdoor containers. By utilizing the heat recovery feature, we’ve repurposed the waste heat to warm our entire facility, successfully eliminating our winter heating bills while maintaining a stable, high-density mining environment."
— Project Lead, Stockholm Indoor Site
Global Deployment
Cumulative delivered cooling capacity
Serving Mining Sites
Countries and regions covered
How is the 36-slot capacity organized within the cabinet?
The cabinet stands 2.1 meters tall and is divided into six internal shelves. Each shelf is designed to house six Antminer hydro units, providing a total capacity of 36 slots. This vertical arrangement maximizes hashrate density while keeping the footprint compact for indoor or sheltered environments.
How is the electrical safety managed for the 36 miners?
The power distribution section is equipped with six sets of industrial-grade air switches. Each switch provides dedicated over-current protection for one shelf (6 miners). This configuration ensures electrical safety across the entire 200kW load and allows you to manage or maintain specific groups of miners without shutting down the whole system.
What are the practical applications for the heat recovery feature?
The system captures waste heat from the miners and converts it into hot water (approximately 80°C). This energy can be repurposed for residential heating, swimming pools, or greenhouses, allowing you to offset energy costs while maintaining high-efficiency mining operations.
How does this cabinet compare to using a full shipping container?
This 36-slot cabinet bridges the gap between individual racks and heavy shipping containers. It is more cost-effective for indoor facility mining—such as in barns or warehouses—where a permanent container might be impractical due to space constraints or zoning regulations.
Does the 36-slot cabinet require complex on-site assembly?
No. The Cooling Distribution Unit (CDU), water pump, and power distribution system are factory-pre-installed in the right-hand control section. On-site, you only need to connect the external dry cooler and complete the initial liquid filling, making the deployment process much faster.
CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available
Show 7 more models
The 200kW 36-Slot Hydro Cooling Cabinet is an industrial infrastructure designed for high-density Antminer hydro deployments. Standing 2.1 meters tall, it delivers a steady 200kW cooling capacity, offering a professional solution for mining operations that require consistent thermal management.
The dual-section layout separates the 36-slot miner rack on the left from the CDU and power control hub on the right. This organization ensures efficient plumbing and easier maintenance, keeping the overall setup clean and accessible. The right-hand section centralizes the pump, air switches, and system management in one protected enclosure.
Additionally, the system supports heat recovery, allowing waste heat to be repurposed for residential or agricultural heating. It is a practical, eco-friendly choice for operators looking to maximize energy efficiency and stability in a high-capacity liquid cooling environment.
Core Advantages

The system integrates the high-density rack and 200kW dry cooler into a unified infrastructure. This professional configuration ensures rapid deployment and high-capacity thermal management for large-scale, professional mining projects.

Features a dedicated Cooling Distribution Unit (CDU) that manages fluid flow across all 36 slots. The organized internal plumbing ensures uniform pressure and temperature, preventing heat accumulation within the modular cabinet.

Equipped with a high-performance water pump designed for heavy-load, continuous operation. It maintains a steady flow rate throughout the 200kW loop, ensuring reliable and efficient heat transfer from the hardware to the radiator.

Engineered to international safety standards, the power cabinet features six industrial air switches for individual group control. With UL-compliant components, it provides dedicated over-current protection and ensures isolated circuit stability.

An integrated control panel provides real-time monitoring of system temperature, pressure, and flow rates. The automated management system optimizes cooling performance and pump speeds based on live data to ensure peak hardware stability.

The 200kW dry cooler effectively dissipates heat while supporting advanced heat recovery. Repurposing waste heat for residential or agricultural heating significantly reduces operational energy costs and improves the overall sustainability of your farm.
Full Specifications
L:1740mm、W:550mm、H:2197mm
L:1740mm、W:550mm、H:2197mm
1300KG
| Model | AP-A36 | Installed capacity | 36 Seat |
| System Power Load (MAX) | 226 kW | Input Voltage | 3-Phase 380V-415V, 50/60Hz |
| Network | 1000M Network Switch*2 | Operation Temperature | -25 ~ 35℃ |
| Operating Humidity | 5%~95%RH | Water Manifold | 304 Stainless Steel |
| Hose | PE/PTFE Hose + Quick Connects | Cooling Capacity | 200kW |
| Water Pump Power | 3.5 kW | Cooling Medium | Pure water/Soften water + Antifreeze + Corrosion Inhibitor |
| Inlet/Outlet | 10°C (Normal) / 14°C (High Performance) | Rated Flow Rate | 20 m³/h |
| PLC System | Constant flow control with pressure regulation | Communication Method | Modbus-RTU,TCP/IP |
| Dry Cooler | |||
| Module | Dry Cooler V Type | Cooling Capacity | 200 kW |
| FANs | 2 | Connection | DN50 |
| Inlet/Outlet Temperature | 55℃/40℃ | Ambient temperature | 35℃ |
| Fin/Tube Materials | 304 Stainless steel,Al-mg/AI | Operating/Maximum Pressure | 0.3 MPA / 1.6 MPA |
| Dry Cooler Dimension | 2792 (L) mm × 1500 (W) mm × 1853 (H) mm | CDU Dimension | 1027 (L) mm × 700 (W) mm × 1915 (H) mm |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 154 kW |
| 28 Slots |
| 1,750 × 1,000 × 2,200 mm |
| Home & Personal Mining |

| 200 kW |
| 34 Slots |
| 1,350 × 8,00 × 2,250 mm |
| Small-Scale Mining Sites |
Compare

| 200 kW |
| 36 Slots |
| 2,230 × 8,00 × 2,370 mm |
| Professional Mining Facilities |

| 230 kW |
| 40 Slots |
| 2,500 × 1,200 × 2,640 mm |
| Mid-Scale Industrial Deployment |
View All >>

Adapting solar-hydro scaling while isolating miners from heavy agricultural dust.
Future Scalability
Noise Reduction

Maximizing indoor density with integrated heat recovery for winter facility heating.
Space Required
Setup Time
Heating Costs
“
"Managing our solar-powered site with these cabinets has been incredibly efficient. The modular setup allowed us to start with our current 2MW power limit and gives us the perfect path to scale up and add more units as our solar array expands to 3.2MW next year."
— Farm Owner, Hamburg Mining Site
"We maximized our warehouse capacity without needing expensive outdoor containers. By utilizing the heat recovery feature, we’ve repurposed the waste heat to warm our entire facility, successfully eliminating our winter heating bills while maintaining a stable, high-density mining environment."
— Project Lead, Stockholm Indoor Site
Cumulative delivered cooling capacity
Countries and regions covered
The cabinet stands 2.1 meters tall and is divided into six internal shelves. Each shelf is designed to house six Antminer hydro units, providing a total capacity of 36 slots. This vertical arrangement maximizes hashrate density while keeping the footprint compact for indoor or sheltered environments.
The system captures waste heat from the miners and converts it into hot water (approximately 80°C). This energy can be repurposed for residential heating, swimming pools, or greenhouses, allowing you to offset energy costs while maintaining high-efficiency mining operations.
No. The Cooling Distribution Unit (CDU), water pump, and power distribution system are factory-pre-installed in the right-hand control section. On-site, you only need to connect the external dry cooler and complete the initial liquid filling, making the deployment process much faster.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop