
20-Slot 200kW Antminer 2U Hydro Cooling System
In stock

This Whatsminer water cooling cabinet supports 12 Whatsminer M53, M63, or M73 units for efficient water-cooled Bitcoin mining with a 120kW cooling capacity.
$9,350.00 – $10,350.00
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
In stock, ready to ship • DDP Sea Shipping Available

230 Th/s · 29 J/Th
12 Slots
Full‑load: $101.76/day

260 Th/s · 26 J/Th
12 Slots
Full‑load: $114.96/day

300 Th/s · 22.8 J/Th
12 Slots
Full‑load: $132.72/day

320 Th/s · 22 J/Th
12 Slots
Full‑load: $141.60/day

366 Th/s · 19.9 J/Th
12 Slots
Full‑load: $161.88/day

390 Th/s · 18.5 J/Th
12 Slots
Full‑load: $172.56/day

450 Th/s · 17 J/Th
12 Slots
Full‑load: $199.08/day

424 Th/s · 15.5 J/Th
12 Slots
Full‑load: $187.56/day

540 Th/s · 17 J/Th
12 Slots
Full‑load: $238.92/day

592 Th/s · 15.5 J/Th
12 Slots
Full‑load: $261.84/day

526 Th/s · 14.5 J/Th
12 Slots
Full‑load: $232.68/day

552 Th/s · 13.5 J/Th
12 Slots
Full‑load: $244.20/day

600 Th/s · 12.5 J/Th
12 Slots
Full‑load: $265.44/day

592 Th/s · 15.5 J/Th
12 Slots
Full‑load: $261.84/day

680 Th/s · 13.5 J/Th
12 Slots
Full‑load: $300.84/day
An entry-level hydro cooling solution for compact mining deployments, this 12-slot 120kW rack is designed for WhatsMiner 2U hydro miners in home mining, small facilities, and initial hydro cooling projects.
Its compact rack design provides an efficient way to transition from traditional air cooling to liquid cooling without requiring large-scale infrastructure. The system supports flexible heat dissipation configurations with either a dry cooler or closed cooling tower, allowing adaptation to different climates and installation environments.
Combined with an integrated liquid circulation system and all-in-one cabinet design, it provides a plug-and-play cooling solution with simplified installation and quick deployment, allowing users to connect power and start mining with minimal setup.
Core Advantages

This integrated cabinet combines all essential components into a single unit for home or office use. It effectively reduces operational noise by replacing loud fans with a quiet liquid loop to save indoor space.

Designed with dedicated 2U rails for Whatsminer units, each slot features an individual power switch. This allows for maintenance on single miners without stopping the rest of the rack to ensure stable uptime.

The internal manifold utilizes 304 stainless steel piping and industrial leak-proof connectors. This secure setup ensures a dry environment for your hardware by preventing fluid leaks during long-term operation.

The integrated CDU module includes an industrial-grade pump and expansion tank. It maintains stable fluid pressure and ensures the 120kW heat load is exported efficiently to the external radiator consistently.

The PLC management system provides real-time monitoring of fluid temperature and pressure. It automatically adjusts pump and fan speeds to maintain thermal balance, ensuring safe and efficient performance daily.

Users can choose between a dry cooler or a closed cooling tower as the external heat dissipation device. This allows the system to adapt to local water access and climate conditions for optimal performance.
Full Specifications
L:850mm、W:1000mm、H:2130mm
L:800mm、W:950mm、H:2080mm
350KG
| Model | AP-M12 | Installed capacity | 12 Seat |
| Heat Dissipation Capacity | 120 kW | Power of the light-duty vertical multistage pump | 2.2 kW |
| Power of the fluid replenishing pump | 0.2 kW | Total power of the dry cooling tower fan | 4.15 kW |
| Total power of the closed cooling tower fan | 1.1 kW | Total power of the closed cooling tower spray pump | 0.75 kW |
| System pipeline pressure | 0.2-0.4 Mpa | Operating temperature range of the system | 0-50 °C |
| Coolant circulation demand of a single machine | ≥0.6 m³/h | Total demand for circulating coolant within the system | ≥0.15 m³ |
| Molded Case Circuit Breaker | 250 A | Contactor | 9 A |
| Intermediate relay | 160 V | CUL certified frequency converter | 380 V |
| Dry Cooler | |||
| Cooling Capacity | 122.6 kW | Fan Quantity | 1 Pcs |
| Working Fluid | Ethylene Glycol | Fluid Flow Rate | 8.4 m³/h |
| Inlet / Outlet Temperature | 47–60 ℃ | Ambient Temperature | 37 ℃ |
| Operating / Max Pressure | 0.25 / 0.4 MPa | Dry Cooling Tower Fan Total Power | 4.75 kW |
| Dry Cooler Dimensions | 1550 × 1172 × 1710 MM | Dry Cooler Weight | 378 KG |
Complete product specifications, installation guide, and operational instructions.
Hydro cooling systems that double as flexible heating solutions—turning mining heat into efficient warmth anywhere it's needed.

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |
Compare

| 120 kW |
| 12 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Home & Office Setup |

| 200 kW |
| 20 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Modular Capacity Expansion |

| 1600 kW |
| 160 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Industrial Infrastructure |

| 2400 kW |
| 240 Slots |
| 1,3716 × 2,438 × 2,896 mm |
| Enterprise-Scale Farms |
Can this system support 12 high-power or overclocked WhatsMiner Hydro miners?
Yes. The system is designed for up to 120kW of total miner load and supports compatible WhatsMiner M53, M63, and M73 Hydro miners, including high-performance and overclocked operation.
For a fully loaded rack, the combined miner power should remain within the 120kW system capacity.
Can I start with fewer than 12 miners and add more later?
Yes. The system does not need to be fully populated from day one.
You can start with a smaller number of miners and add additional units as your available power and mining capacity increase, making it suitable for phased deployment without replacing the entire cooling rack.
What should be prepared on site before the system arrives?
The main site requirements are industrial three-phase power, suitable installation space, piping and electrical access for the dry cooler, and sufficient ventilation around the heat-rejection equipment.
The mining rack and quick-connect cooling interfaces are prepared before shipment, helping reduce on-site assembly work.
Are the quick connectors included, or do I need to source them separately?
The required quick connectors are prepared with the cooling rack before shipment.
The miners can be connected directly to the corresponding coolant supply and return lines during installation, reducing additional pipe fitting and compatibility work on site.
What happens if one miner needs to be removed or serviced?
A single miner can be isolated from the cooling loop without shutting down the entire rack.
This allows maintenance, replacement, or troubleshooting of one unit while the remaining miners continue operating, reducing unnecessary downtime for the whole mining cluster.
Is the matched dry cooler suitable for continuous 120kW operation?
Yes. The system can be paired with a 122.6kW dry cooler designed to reject the heat generated by the mining rack.
For stable summer operation, the dry cooler should be installed with sufficient intake and exhaust space so that hot discharge air cannot recirculate back into the unit.
Can the system be integrated into a larger monitoring platform?
Yes. The cooling rack supports MODBUS-RTU communication and can be integrated into a centralized monitoring or site-management system.
This allows operators to monitor key cooling parameters and makes the system more suitable for professional mining sites operating multiple racks.
If I plan to expand beyond 12 miners, do I need to replace this system?
No. Additional cooling racks can be added as the mining site expands.
For future multi-rack deployments, it is better to reserve sufficient electrical capacity, piping space, dry-cooler installation area, and monitoring interfaces from the beginning. This reduces the amount of infrastructure that needs to be rebuilt during later expansion.
CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
In stock, ready to ship • DDP Sea Shipping Available
Show 11 more models
An entry-level hydro cooling solution for compact mining deployments, this 12-slot 120kW rack is designed for WhatsMiner 2U hydro miners in home mining, small facilities, and initial hydro cooling projects.
Its compact rack design provides an efficient way to transition from traditional air cooling to liquid cooling without requiring large-scale infrastructure. The system supports flexible heat dissipation configurations with either a dry cooler or closed cooling tower, allowing adaptation to different climates and installation environments.
Combined with an integrated liquid circulation system and all-in-one cabinet design, it provides a plug-and-play cooling solution with simplified installation and quick deployment, allowing users to connect power and start mining with minimal setup.
Core Advantages

This integrated cabinet combines all essential components into a single unit for home or office use. It effectively reduces operational noise by replacing loud fans with a quiet liquid loop to save indoor space.

Designed with dedicated 2U rails for Whatsminer units, each slot features an individual power switch. This allows for maintenance on single miners without stopping the rest of the rack to ensure stable uptime.

The internal manifold utilizes 304 stainless steel piping and industrial leak-proof connectors. This secure setup ensures a dry environment for your hardware by preventing fluid leaks during long-term operation.

The integrated CDU module includes an industrial-grade pump and expansion tank. It maintains stable fluid pressure and ensures the 120kW heat load is exported efficiently to the external radiator consistently.

The PLC management system provides real-time monitoring of fluid temperature and pressure. It automatically adjusts pump and fan speeds to maintain thermal balance, ensuring safe and efficient performance daily.

Users can choose between a dry cooler or a closed cooling tower as the external heat dissipation device. This allows the system to adapt to local water access and climate conditions for optimal performance.
Full Specifications
L:850mm、W:1000mm、H:2130mm
L:800mm、W:950mm、H:2080mm
350KG
| Model | AP-M12 | Installed capacity | 12 Seat |
| Heat Dissipation Capacity | 120 kW | Power of the light-duty vertical multistage pump | 2.2 kW |
| Power of the fluid replenishing pump | 0.2 kW | Total power of the dry cooling tower fan | 4.15 kW |
| Total power of the closed cooling tower fan | 1.1 kW | Total power of the closed cooling tower spray pump | 0.75 kW |
| System pipeline pressure | 0.2-0.4 Mpa | Operating temperature range of the system | 0-50 °C |
| Coolant circulation demand of a single machine | ≥0.6 m³/h | Total demand for circulating coolant within the system | ≥0.15 m³ |
| Molded Case Circuit Breaker | 250 A | Contactor | 9 A |
| Intermediate relay | 160 V | CUL certified frequency converter | 380 V |
| Dry Cooler | |||
| Cooling Capacity | 122.6 kW | Fan Quantity | 1 Pcs |
| Working Fluid | Ethylene Glycol | Fluid Flow Rate | 8.4 m³/h |
| Inlet / Outlet Temperature | 47–60 ℃ | Ambient Temperature | 37 ℃ |
| Operating / Max Pressure | 0.25 / 0.4 MPa | Dry Cooling Tower Fan Total Power | 4.75 kW |
| Dry Cooler Dimensions | 1550 × 1172 × 1710 MM | Dry Cooler Weight | 378 KG |
Complete product specifications, installation guide, and operational instructions.
Hydro cooling systems that double as flexible heating solutions—turning mining heat into efficient warmth anywhere it's needed.

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |
Compare

| 120 kW |
| 12 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Home & Office Setup |

| 200 kW |
| 20 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Modular Capacity Expansion |

| 1600 kW |
| 160 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Industrial Infrastructure |

| 2400 kW |
| 240 Slots |
| 1,3716 × 2,438 × 2,896 mm |
| Enterprise-Scale Farms |
Yes. The system is designed for up to 120kW of total miner load and supports compatible WhatsMiner M53, M63, and M73 Hydro miners, including high-performance and overclocked operation.
For a fully loaded rack, the combined miner power should remain within the 120kW system capacity.
Yes. The system does not need to be fully populated from day one.
You can start with a smaller number of miners and add additional units as your available power and mining capacity increase, making it suitable for phased deployment without replacing the entire cooling rack.
The main site requirements are industrial three-phase power, suitable installation space, piping and electrical access for the dry cooler, and sufficient ventilation around the heat-rejection equipment.
The mining rack and quick-connect cooling interfaces are prepared before shipment, helping reduce on-site assembly work.
The required quick connectors are prepared with the cooling rack before shipment.
The miners can be connected directly to the corresponding coolant supply and return lines during installation, reducing additional pipe fitting and compatibility work on site.
A single miner can be isolated from the cooling loop without shutting down the entire rack.
This allows maintenance, replacement, or troubleshooting of one unit while the remaining miners continue operating, reducing unnecessary downtime for the whole mining cluster.
Yes. The system can be paired with a 122.6kW dry cooler designed to reject the heat generated by the mining rack.
For stable summer operation, the dry cooler should be installed with sufficient intake and exhaust space so that hot discharge air cannot recirculate back into the unit.
Yes. The cooling rack supports MODBUS-RTU communication and can be integrated into a centralized monitoring or site-management system.
This allows operators to monitor key cooling parameters and makes the system more suitable for professional mining sites operating multiple racks.
No. Additional cooling racks can be added as the mining site expands.
For future multi-rack deployments, it is better to reserve sufficient electrical capacity, piping space, dry-cooler installation area, and monitoring interfaces from the beginning. This reduces the amount of infrastructure that needs to be rebuilt during later expansion.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop