
1.2MW 210-Slot Antminer Hydro Mining Container (20HQ)
In stock
$60,800.00 – $80,500.00
Deploy the upgraded Bitmain ANTSPACE HK3 V7. Features a higher 1.2MW power envelope, 210 Antminer hydro slots, and a closed-loop dry tower system for zero water loss.
$45,000.00
Futures
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
POWER INPUT
Rated Voltage
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available

257 Th/s · 20.6 J/Th
210 Slots
Full‑load: $1,988.70/day

198 Th/s · 27.5 J/Th
210 Slots
Full‑load: $1,533.00/day

293 Th/s · 19 J/Th
210 Slots
Full‑load: $2,268.00/day

251 Th/s · 22 J/Th
210 Slots
Full‑load: $1,942.50/day

335 Th/s · 16 J/Th
210 Slots
Full‑load: $2,593.50/day

473 Th/s · 12 J/Th
210 Slots
Full‑load: $3,662.40/day

500 Th/s · 11 J/Th
210 Slots
Full‑load: $3,870.30/day

358 Th/s · 15 J/Th
210 Slots
Full‑load: $2,772.00/day

310 Th/s · 17 J/Th
210 Slots
Full‑load: $2,400.30/day

430 Th/s · 13 J/Th
210 Slots
Full‑load: $3,328.50/day

495 Th/s · 12 J/Th
210 Slots
Full‑load: $3,832.50/day

580 Th/s · 9.5 J/Th
210 Slots
Full‑load: $4,489.80/day
As the advanced 7.0 iteration of the flagship ANTSPACE HK3 series, the Bitmain ANTSPACE HK3 V7 is a turnkey 1.2MW hydro cooling container engineered for utility-scale outdoor deployments. This latest generation houses up to 210 Antminer S19/S21/S23 hydro miners in a rugged, weather-resistant enclosure optimized for high-density operation.
Paired with a specialized closed-loop dry cooling tower, the HK3 V7 eliminates water evaporation and mineral scaling. This makes this 7.0 hydro container ideal for water-scarce regions or remote mining sites requiring zero water consumption and minimal routine maintenance.
Featuring upgraded internal piping, integrated power distribution, and smart monitoring, the 210-slot ANTSPACE HK3 V7 delivers rapid on-site commissioning, maximizing hashrate uptime and long-term operating profitability.
Core Advantages
Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.
Certified with an exceptional 1.032 PUE, dedicating nearly all electrical capacity directly to ASIC computation and cutting auxiliary cooling electricity consumption by up to eighty percent over air-cooled sites.
ilt for extreme operating environments from -35°C to 45°C, featuring integrated PTC electric heating to safely preheat coolant above 20°C before cold-starts in arctic winter climates.
Delivered fully factory-integrated with industrial power distribution cabinets, and smart control systems, enabling rapid site landing, effortless transformer connection, and immediate hashrate generation.
Houses up to 210 Antminer S19/S21/S23 Hydro units in a heavy-duty container frame, delivering 1.2MW of high-density hashpower within a compact, standardized footprint to maximize pad profitability.
Utilizes an advanced closed-loop dry cooling tower that eliminates continuous water replenishment and mineral scaling, making it the perfect hydro mining solution for arid, cold, or water-restricted regions.
Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.
Certified with an exceptional 1.032 PUE, dedicating nearly all electrical capacity directly to ASIC computation and cutting auxiliary cooling electricity consumption by up to eighty percent over air-cooled sites.
ilt for extreme operating environments from -35°C to 45°C, featuring integrated PTC electric heating to safely preheat coolant above 20°C before cold-starts in arctic winter climates.
Delivered fully factory-integrated with industrial power distribution cabinets, and smart control systems, enabling rapid site landing, effortless transformer connection, and immediate hashrate generation.
Houses up to 210 Antminer S19/S21/S23 Hydro units in a heavy-duty container frame, delivering 1.2MW of high-density hashpower within a compact, standardized footprint to maximize pad profitability.
Utilizes an advanced closed-loop dry cooling tower that eliminates continuous water replenishment and mineral scaling, making it the perfect hydro mining solution for arid, cold, or water-restricted regions.
Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.
Certified with an exceptional 1.032 PUE, dedicating nearly all electrical capacity directly to ASIC computation and cutting auxiliary cooling electricity consumption by up to eighty percent over air-cooled sites.
Full Specifications
L:6058mm、W:2438mm、H:2896mm
L:6058mm、W:2438mm、H:2896mm
80000 KG
| Model | ANTSPACE HK3 (V7) | Installed capacity | 210 Rack Space |
| Operating Power | Standard: 1200 kW / Maximum: 1300 kW | PUE | 1.032 |
| Rated Voltage | 400V ± 5% | Rated Frequency | 50Hz / 60Hz |
| Main Switch Capacity | 1200 A | Rated Current | 986 A |
| Coolant Flow Rate | >85 m³/h | Operating Pressure | 0.4 ~ 0.6 MPa |
| Dry Cooling Tower | |||
| Heat Dissipation Capacity | 1300 kW | Single Tower Dimensions | 6058×2438×2896 mm |
| Dry Tower Power Consumption | 22 ~ 45 kW | Dry Tower Weight | Shipping Weight: 6 T / Operating Weight: 8 T |
| Water Outlet Temp | 35℃ | Cooling Interface | DN100 |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |
Compare

| 1.2 MW |
| 210 Slots |
| 6058 × 2,438 × 2,896 mm |
| Mid-to-Large Operations |

| 1.7 MW |
| 308 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Commercial-Scale Mining |

| 2 MW |
| 420 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Industrial-Scale Projects |

| 2.6 MW |
| 480 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Mega-Scale Mining Facilities |
What key upgrades does the ANTSPACE HK3 V7 introduce over earlier versions (V2/V3/V5)?
The HK3 V7 represents a major engineering overhaul specifically designed for current- and next-generation high-density miners:
Which Antminer models are compatible with the ANTSPACE HK3 V7?
The system accommodates up to 210 Antminer hydro miners in a high-density vertical layout. It delivers native, out-of-the-box compatibility with the Antminer S19, S21, and S23 Hydro series (including S19 Hyd./XP Hyd., S21 Hyd./XP Hyd., and the next-generation S23 Hyd. / U3S23H models). All 210 slots are pre-configured with standardized 3U mounting rails, quick-connect fluid couplings, and heavy-duty power harnesses precisely engineered to handle the physical dimensions and intense thermal dissipation of these generations.
How is the dry cooling system configured, and does it require water replenishment?
Each ANTSPACE HK3 V7 unit is paired with
two container-type dry cooling towers
(Dry Tower Container Type × 2), delivering a combined heat dissipation capacity of
1,300 kW
to effortlessly cool the 1,200 kW operational load. Operating as a 100% sealed, closed-circuit loop, the system has
virtually zero water evaporation loss
. Unlike open cooling towers, it requires no daily water replenishment, produces no mineral scaling, and operates cleanly in water-restricted or desert regions.
What electrical capacity and transformer sizing are required?
The HK3 V7 operates on a 400V (±5%) 3-phase industrial power supply at 50/60Hz, protected by an integrated 1,200A main switch (rated operating current: 986A). According to Bitmain’s official infrastructure guidelines, a single 2,500 kVA transformer can cleanly power two (2) ANTSPACE HK3 containers, optimizing substation capital expenditure and electrical efficiency on utility-scale mining pads.
How does the system operate in freezing winter conditions down to -35°C?
The container is officially rated for extreme climates from -35°C to 45°C. It features an intelligent PTC auxiliary electric heating system. During cold-starts when coolant temperature drops below 20°C, the system automatically runs an internal circulation mode with the PTC heaters active, warming the fluid above 20°C before the miners power on. Combined with an approved industrial glycol mixture, this protects ASIC hashboards from thermal shock and freezing damage.
What are the shipping dimensions and civil pad layout for one complete set?
One complete set consists of three standard 20ft High Cube containers (1 mining container + 2 dry cooling towers), each measuring 6,058 × 2,438 × 2,896 mm and certified by the China Classification Society (CCS) for secure international transport. On-site installation simply requires pouring three level concrete pads, positioning the units, and connecting the supplied DN100 chuck couplings (ISO 2852) and power drops—enabling full commissioning within days.
What is the operating noise level, and does it meet local industrial permitting standards?
Unlike conventional air-cooled containers that generate piercing high-frequency noise exceeding 85–95 dBA, the hydro-cooled HK3 V7 container operates extremely quietly (under 60 dBA inside the closed container). The external noise comes solely from the low-RPM, high-efficiency axial fans on the dual dry towers, maintaining sound levels at
≤75 dBA
≤
75
dBA
at 10 meters. This makes local zoning approvals, EPA/environmental permits, and urban-adjacent deployments significantly easier.
How does the routine maintenance of a dry tower compare to open evaporative cooling towers?
Maintenance is drastically reduced. Because the HK3 V7 utilizes a fully sealed, closed-circuit dry cooling loop, it eliminates the need for daily water replenishment, chemical biocide dosing, water softening treatments, and blowdown drainage typical of open evaporative towers. Routine upkeep is limited to periodically inspecting coolant conductivity and using an air/water pressure washer to rinse dust and debris from the dry tower fin coils every 3 to 6 months.
CONTAINER CAPACITY
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available
Show 8 more models
As the advanced 7.0 iteration of the flagship ANTSPACE HK3 series, the Bitmain ANTSPACE HK3 V7 is a turnkey 1.2MW hydro cooling container engineered for utility-scale outdoor deployments. This latest generation houses up to 210 Antminer S19/S21/S23 hydro miners in a rugged, weather-resistant enclosure optimized for high-density operation.
Paired with a specialized closed-loop dry cooling tower, the HK3 V7 eliminates water evaporation and mineral scaling. This makes this 7.0 hydro container ideal for water-scarce regions or remote mining sites requiring zero water consumption and minimal routine maintenance.
Featuring upgraded internal piping, integrated power distribution, and smart monitoring, the 210-slot ANTSPACE HK3 V7 delivers rapid on-site commissioning, maximizing hashrate uptime and long-term operating profitability.
Core Advantages
Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.
Certified with an exceptional 1.032 PUE, dedicating nearly all electrical capacity directly to ASIC computation and cutting auxiliary cooling electricity consumption by up to eighty percent over air-cooled sites.
ilt for extreme operating environments from -35°C to 45°C, featuring integrated PTC electric heating to safely preheat coolant above 20°C before cold-starts in arctic winter climates.
Delivered fully factory-integrated with industrial power distribution cabinets, and smart control systems, enabling rapid site landing, effortless transformer connection, and immediate hashrate generation.
Houses up to 210 Antminer S19/S21/S23 Hydro units in a heavy-duty container frame, delivering 1.2MW of high-density hashpower within a compact, standardized footprint to maximize pad profitability.
Utilizes an advanced closed-loop dry cooling tower that eliminates continuous water replenishment and mineral scaling, making it the perfect hydro mining solution for arid, cold, or water-restricted regions.
Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.
Certified with an exceptional 1.032 PUE, dedicating nearly all electrical capacity directly to ASIC computation and cutting auxiliary cooling electricity consumption by up to eighty percent over air-cooled sites.
ilt for extreme operating environments from -35°C to 45°C, featuring integrated PTC electric heating to safely preheat coolant above 20°C before cold-starts in arctic winter climates.
Delivered fully factory-integrated with industrial power distribution cabinets, and smart control systems, enabling rapid site landing, effortless transformer connection, and immediate hashrate generation.
Houses up to 210 Antminer S19/S21/S23 Hydro units in a heavy-duty container frame, delivering 1.2MW of high-density hashpower within a compact, standardized footprint to maximize pad profitability.
Utilizes an advanced closed-loop dry cooling tower that eliminates continuous water replenishment and mineral scaling, making it the perfect hydro mining solution for arid, cold, or water-restricted regions.
Utilizes a closed loop dry cooling tower with over two cubic meters of sealed coolant, requiring absolutely zero water replenishment, making it ideal for water restricted projects.
Certified with an exceptional 1.032 PUE, dedicating nearly all electrical capacity directly to ASIC computation and cutting auxiliary cooling electricity consumption by up to eighty percent over air-cooled sites.
Full Specifications
L:6058mm、W:2438mm、H:2896mm
L:6058mm、W:2438mm、H:2896mm
80000 KG
| Model | ANTSPACE HK3 (V7) | Installed capacity | 210 Rack Space |
| Operating Power | Standard: 1200 kW / Maximum: 1300 kW | PUE | 1.032 |
| Rated Voltage | 400V ± 5% | Rated Frequency | 50Hz / 60Hz |
| Main Switch Capacity | 1200 A | Rated Current | 986 A |
| Coolant Flow Rate | >85 m³/h | Operating Pressure | 0.4 ~ 0.6 MPa |
| Dry Cooling Tower | |||
| Heat Dissipation Capacity | 1300 kW | Single Tower Dimensions | 6058×2438×2896 mm |
| Dry Tower Power Consumption | 22 ~ 45 kW | Dry Tower Weight | Shipping Weight: 6 T / Operating Weight: 8 T |
| Water Outlet Temp | 35℃ | Cooling Interface | DN100 |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |
Compare

| 1.2 MW |
| 210 Slots |
| 6058 × 2,438 × 2,896 mm |
| Mid-to-Large Operations |

| 1.7 MW |
| 308 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Commercial-Scale Mining |

| 2 MW |
| 420 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Industrial-Scale Projects |

| 2.6 MW |
| 480 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Mega-Scale Mining Facilities |
The HK3 V7 represents a major engineering overhaul specifically designed for current- and next-generation high-density miners:
The system accommodates up to 210 Antminer hydro miners in a high-density vertical layout. It delivers native, out-of-the-box compatibility with the Antminer S19, S21, and S23 Hydro series (including S19 Hyd./XP Hyd., S21 Hyd./XP Hyd., and the next-generation S23 Hyd. / U3S23H models). All 210 slots are pre-configured with standardized 3U mounting rails, quick-connect fluid couplings, and heavy-duty power harnesses precisely engineered to handle the physical dimensions and intense thermal dissipation of these generations.
The HK3 V7 operates on a 400V (±5%) 3-phase industrial power supply at 50/60Hz, protected by an integrated 1,200A main switch (rated operating current: 986A). According to Bitmain’s official infrastructure guidelines, a single 2,500 kVA transformer can cleanly power two (2) ANTSPACE HK3 containers, optimizing substation capital expenditure and electrical efficiency on utility-scale mining pads.
The container is officially rated for extreme climates from -35°C to 45°C. It features an intelligent PTC auxiliary electric heating system. During cold-starts when coolant temperature drops below 20°C, the system automatically runs an internal circulation mode with the PTC heaters active, warming the fluid above 20°C before the miners power on. Combined with an approved industrial glycol mixture, this protects ASIC hashboards from thermal shock and freezing damage.
One complete set consists of three standard 20ft High Cube containers (1 mining container + 2 dry cooling towers), each measuring 6,058 × 2,438 × 2,896 mm and certified by the China Classification Society (CCS) for secure international transport. On-site installation simply requires pouring three level concrete pads, positioning the units, and connecting the supplied DN100 chuck couplings (ISO 2852) and power drops—enabling full commissioning within days.
Unlike conventional air-cooled containers that generate piercing high-frequency noise exceeding 85–95 dBA, the hydro-cooled HK3 V7 container operates extremely quietly (under 60 dBA inside the closed container). The external noise comes solely from the low-RPM, high-efficiency axial fans on the dual dry towers, maintaining sound levels at
at 10 meters. This makes local zoning approvals, EPA/environmental permits, and urban-adjacent deployments significantly easier.
Maintenance is drastically reduced. Because the HK3 V7 utilizes a fully sealed, closed-circuit dry cooling loop, it eliminates the need for daily water replenishment, chemical biocide dosing, water softening treatments, and blowdown drainage typical of open evaporative towers. Routine upkeep is limited to periodically inspecting coolant conductivity and using an air/water pressure washer to rinse dust and debris from the dry tower fin coils every 3 to 6 months.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop