
1.2MW 210-Slot Antminer Hydro Mining Container (20HQ)
In stock
$60,800.00 – $80,500.00
This 40ft hydro mining container supports up to 420 Antminer hydro units for efficient hydro cooling, delivering a high-performance Bitcoin mining solution with 2.4MW capacity.
$103,500.00 – $147,800.00
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available

293 Th/s · 19 J/Th
420 Slots
Full‑load: $4,536.00/day

473 Th/s · 12 J/Th
420 Slots
Full‑load: $7,324.80/day

358 Th/s · 15 J/Th
420 Slots
Full‑load: $5,544.00/day

310 Th/s · 17 J/Th
420 Slots
Full‑load: $4,800.60/day

580 Th/s · 9.5 J/Th
420 Slots
Full‑load: $8,979.60/day
Custom-designed for large-scale enterprise deployments, the 2.4MW 420-Slot Antminer Hydro Cooling Container 40FT HQ represents a highly secure, heavy-duty mining infrastructure.
Built with a reinforced steel frame and fireproof insulation, this robust 40-foot container is engineered to handle up to 420 Antminer hydro series units under continuous 2400kW thermal load. It integrates pre-wired Bitmain original cabling, a dedicated Gigabit fiber switch, and auto-reclosing breakers to safeguard ASIC hardware from any electrical anomalies.
Featuring seamless stainless manifolds and redundant water loops, this fully integrated, CE-compliant solution maximizes hashing uptime, simplifies maintenance, and secures operational security for high-density, megawatt-scale BTC mining.
Core Advantages

Equips every slot with genuine Bitmain power and network cables utilizing aviation plugs, paired with a dedicated Gigabit fiber switch to ensure stable, highly organized connectivity.

Built with seamless, one-piece pipes to prevent welding leaks, this dual-loop system uses red markers for hot water inlets and blue for cold outlets, running reliably if one side loses power.

Features space saving built-in seamless stainless steel manifolds and mini ball valves with double sealed quick connectors, ensuring zero coolant leakage during any connection and disconnection.

Features motorized louvers with dust filters, a fireproof insulation lining, internal-locking fasteners, and a reinforced cross-beam base to ensure robust, secure, and stable container operations.

Integrates auto-reclosing circuit breakers, independent rack power controls with 1-to-1 labels, and lightning protection, enabling safe electrical operations and instant automatic shutdowns during any anomalies.

Equipped with a moisture-sensing immersion rope, this system detects coolant leaks and triggers instant alarms, enhancing safety and preventing potential damage in liquid-cooled mining setups.
Full Specifications
L:12192mm、W:2438mm、H:2896mm
L:12000mm、W:2230mm、H:2660mm
9200KG
| Model | AP-HC40-A420 | Installed capacity | 420 seat |
| Installed powerload | 2310 KW | Power of the light-duty vertical multistage pump | 30 kW |
| Power of the fluid replenishing pump | 0.2 KW | Total power of the dry cooling tower fan | 99.6 KW |
| Total power of the closed cooling tower fan | 33 KW | Total power of the closed cooling tower spray pump | 8 KW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 22-42 ℃ |
| Coolant circulation demand of a single machine | ≥0.5 m³/h | Total demand for circulating coolant within the system | ≥2.2 m³ |
| Molded Case Circuit Breaker | 250 A | Residual Current Circuit Breaker | 630 A |
| Contactor | 9 A | Intermediate relay | 24 V |
| CUL certified frequency converter | 380 V |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
Match your container deployment with the appropriate transformer capacity.
Get Transformer Recommendation →
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 1.7 MW |
| 308 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Standard Industrial Operations |

| 2.1 MW |
| 364 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| High-Density Mining Farms |
Compare

| 2.4 MW |
| 420 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Mega-Scale Utility Projects |

| 2.6 MW |
| 480 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Enterprise-Class Global Facilities |
View All >>

Sustaining stable large-scale operations under heavy thermal loads.
Cooling Efficiency
Cooling Power Draw
Annual Savings
View All >>

Achieving zero-emission hydro mining with clean geothermal energy.
Operational Uptime
Setup Time
System Reliability
View All >>
“
"Operating 420 miners under heavy industrial voltage requires uncompromising safety. These fully UL-certified containers with automatic reclosing breakers gave our Canadian site reliable power delivery and complete operational peace of mind."
— VP of Operations, Edmonton Mining Site, Canada
"Deploying five 2.4MW containers in Iceland's rugged environment was incredibly smooth. The reinforced, fireproof structure and pre-wired cabling made on-site installation effortless, delivering immediate eco-friendly hashing."
— O&M Director, Reykjavik Mining Site, Iceland
Global Deployment
Cumulative delivered cooling capacity
Serving Mining Sites
Countries and regions covered
What is the electrical voltage compatibility of this container, and how is the PDU infrastructure designed?
Engineered for standard 380V three phase input, the integrated PDU cabinet delivers a stable, reliable power supply. This heavy-duty system is custom configured to fully accommodate the massive 2310kW total installed load of all 420 hydro miners under continuous full-load operations safely.
Can this 2.31MW container ensure zero hashrate downclocking during extreme summer temperatures above 45°C?
Yes. For extreme climates exceeding 40°C, we recommend upgrading the integrated dry cooler with an optional wet curtain system. This restricts chip inlet water temperatures strictly below 35°C, ensuring consistent, stable full load hashrates without any thermal downclocking on extremely hot summer days.
How does this high-density 40FT container ensure the water temperature difference between the first and last rows stays below 2°C?
By utilizing advanced, large-diameter stainless steel manifolds and optimized hydraulic water loops, the system maintains steady, high-velocity coolant circulation. This highly balanced design ensures consistent, uniform thermal dissipation, keeping the internal temperature difference between the first and last rows strictly below 2°C.
How does the container's 1-to-1 power switch design safeguard operators against high-voltage safety hazards?
To prevent dangerous electrical arcing under standard 380V operating voltages, our independent rack power cabinets utilize auto reclosing circuit breakers. This crucial design configuration ensures that operators always disconnect the breaker power before safely unplugging any active water cooled ASIC miner power cables.
How is the water pipeline system engineered to ensure reliable leak prevention during routine maintenance?
Featuring seamless stainless steel manifolds and double sealed quick connectors, this system is engineered to completely prevent any coolant leaks. The dedicated isolation valves allow operators to safely close specific racks for planned maintenance, entirely avoiding container downtime or fluid loss during operations.
CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 45 days • DDP Sea Shipping Available
Show 1 more models
Custom-designed for large-scale enterprise deployments, the 2.4MW 420-Slot Antminer Hydro Cooling Container 40FT HQ represents a highly secure, heavy-duty mining infrastructure.
Built with a reinforced steel frame and fireproof insulation, this robust 40-foot container is engineered to handle up to 420 Antminer hydro series units under continuous 2400kW thermal load. It integrates pre-wired Bitmain original cabling, a dedicated Gigabit fiber switch, and auto-reclosing breakers to safeguard ASIC hardware from any electrical anomalies.
Featuring seamless stainless manifolds and redundant water loops, this fully integrated, CE-compliant solution maximizes hashing uptime, simplifies maintenance, and secures operational security for high-density, megawatt-scale BTC mining.
Core Advantages

Equips every slot with genuine Bitmain power and network cables utilizing aviation plugs, paired with a dedicated Gigabit fiber switch to ensure stable, highly organized connectivity.

Built with seamless, one-piece pipes to prevent welding leaks, this dual-loop system uses red markers for hot water inlets and blue for cold outlets, running reliably if one side loses power.

Features space saving built-in seamless stainless steel manifolds and mini ball valves with double sealed quick connectors, ensuring zero coolant leakage during any connection and disconnection.

Features motorized louvers with dust filters, a fireproof insulation lining, internal-locking fasteners, and a reinforced cross-beam base to ensure robust, secure, and stable container operations.

Integrates auto-reclosing circuit breakers, independent rack power controls with 1-to-1 labels, and lightning protection, enabling safe electrical operations and instant automatic shutdowns during any anomalies.

Equipped with a moisture-sensing immersion rope, this system detects coolant leaks and triggers instant alarms, enhancing safety and preventing potential damage in liquid-cooled mining setups.
Full Specifications
L:12192mm、W:2438mm、H:2896mm
L:12000mm、W:2230mm、H:2660mm
9200KG
| Model | AP-HC40-A420 | Installed capacity | 420 seat |
| Installed powerload | 2310 KW | Power of the light-duty vertical multistage pump | 30 kW |
| Power of the fluid replenishing pump | 0.2 KW | Total power of the dry cooling tower fan | 99.6 KW |
| Total power of the closed cooling tower fan | 33 KW | Total power of the closed cooling tower spray pump | 8 KW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 22-42 ℃ |
| Coolant circulation demand of a single machine | ≥0.5 m³/h | Total demand for circulating coolant within the system | ≥2.2 m³ |
| Molded Case Circuit Breaker | 250 A | Residual Current Circuit Breaker | 630 A |
| Contactor | 9 A | Intermediate relay | 24 V |
| CUL certified frequency converter | 380 V |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
Match your container deployment with the appropriate transformer capacity.
Get Transformer Recommendation →
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 1.7 MW |
| 308 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Standard Industrial Operations |

| 2.1 MW |
| 364 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| High-Density Mining Farms |
Compare

| 2.4 MW |
| 420 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Mega-Scale Utility Projects |

| 2.6 MW |
| 480 Slots |
| 1,2192 × 2,438 × 2,896 mm |
| Enterprise-Class Global Facilities |
View All >>

Sustaining stable large-scale operations under heavy thermal loads.
Cooling Efficiency
Cooling Power Draw
Annual Savings
View All >>

Achieving zero-emission hydro mining with clean geothermal energy.
Operational Uptime
Setup Time
System Reliability
View All >>
“
"Operating 420 miners under heavy industrial voltage requires uncompromising safety. These fully UL-certified containers with automatic reclosing breakers gave our Canadian site reliable power delivery and complete operational peace of mind."
— VP of Operations, Edmonton Mining Site, Canada
"Deploying five 2.4MW containers in Iceland's rugged environment was incredibly smooth. The reinforced, fireproof structure and pre-wired cabling made on-site installation effortless, delivering immediate eco-friendly hashing."
— O&M Director, Reykjavik Mining Site, Iceland
Cumulative delivered cooling capacity
Countries and regions covered
Engineered for standard 380V three phase input, the integrated PDU cabinet delivers a stable, reliable power supply. This heavy-duty system is custom configured to fully accommodate the massive 2310kW total installed load of all 420 hydro miners under continuous full-load operations safely.
Yes. For extreme climates exceeding 40°C, we recommend upgrading the integrated dry cooler with an optional wet curtain system. This restricts chip inlet water temperatures strictly below 35°C, ensuring consistent, stable full load hashrates without any thermal downclocking on extremely hot summer days.
By utilizing advanced, large-diameter stainless steel manifolds and optimized hydraulic water loops, the system maintains steady, high-velocity coolant circulation. This highly balanced design ensures consistent, uniform thermal dissipation, keeping the internal temperature difference between the first and last rows strictly below 2°C.
To prevent dangerous electrical arcing under standard 380V operating voltages, our independent rack power cabinets utilize auto reclosing circuit breakers. This crucial design configuration ensures that operators always disconnect the breaker power before safely unplugging any active water cooled ASIC miner power cables.
Featuring seamless stainless steel manifolds and double sealed quick connectors, this system is engineered to completely prevent any coolant leaks. The dedicated isolation valves allow operators to safely close specific racks for planned maintenance, entirely avoiding container downtime or fluid loss during operations.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop