
Bitmain ANTRACK AR30 200kW For 20 Units Antminer 2U Hydro Miner Heat Recovery
In stock
$16,000.00
A 20-slot 200kW hydro cooling cabinet designed for WhatsMiner hydro miners. Its split-type architecture enables flexible deployment with customized CDU and heat dissipation equipment for different mining sites.
$11,820.00 – $12,800.00
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available

230 Th/s · 29 J/Th
20 Slots
Full‑load: $169.60/day

260 Th/s · 26 J/Th
20 Slots
Full‑load: $191.60/day

300 Th/s · 22.8 J/Th
20 Slots
Full‑load: $221.20/day

320 Th/s · 22 J/Th
20 Slots
Full‑load: $236.00/day

366 Th/s · 19.9 J/Th
20 Slots
Full‑load: $269.80/day

390 Th/s · 18.5 J/Th
20 Slots
Full‑load: $287.60/day

450 Th/s · 17 J/Th
20 Slots
Full‑load: $331.80/day

424 Th/s · 15.5 J/Th
20 Slots
Full‑load: $312.60/day

540 Th/s · 17 J/Th
20 Slots
Full‑load: $398.20/day

592 Th/s · 15.5 J/Th
20 Slots
Full‑load: $436.40/day

526 Th/s · 14.5 J/Th
20 Slots
Full‑load: $387.80/day

552 Th/s · 13.5 J/Th
20 Slots
Full‑load: $407.00/day

600 Th/s · 12.5 J/Th
20 Slots
Full‑load: $442.40/day

592 Th/s · 15.5 J/Th
20 Slots
Full‑load: $436.40/day

680 Th/s · 13.5 J/Th
20 Slots
Full‑load: $501.40/day
Designed for efficient and flexible ASIC mining deployment, this 20-slot split-type hydro cooling cabinet supports up to 200kW of cooling capacity for WhatsMiner hydro miners.
Its separated cabinet and heat dissipation design allows the cooling equipment to be positioned according to actual site conditions, making installation easier across different mining environments. The system can be paired with a customized CDU and heat rejection equipment based on the required cooling load, miner configuration, and deployment space.
With a practical modular structure, it provides a reliable starting point for hydro-cooled mining operations while leaving room for future system adjustments and expansion.
Core Advantages

The rack, CDU, power cabinet, and controller are all built into one single cabinet. Once delivered, simply connect the water pipes and power cables to start running—no complex assembly required.

High-seal manifolds and reinforced pipes prevent coolant leaks at the source. Red and blue valves control hot and cold water; simply turn them off to isolate lines during maintenance with zero spills.

The PDU power panel features a 1-to-1 breaker design, giving every single miner its own dedicated switch. If one unit needs servicing, just trip its specific breaker without affecting the rest of the rack.

A water-sensing rope is installed along the bottom edge of the cabinet. If coolant leaks to the floor, it triggers an instant alarm so onsite staff can fix it before any miners get damaged.

Features 304 stainless steel manifolds, industry-standard aviation plugs, and reinforced high-pressure tubing with manual ball valves. Solidly sealed and durable for long-term use.

The CDU shown is fully customizable and expandable. We can adjust its cooling capacity, pump specs, and expansion ports based on your specific site conditions, miner count, and heat rejection equipment.
Modular 1-to-N Infrastructure Scalability
The 1-to-N modular design enables flexible power expansion from 200kW up to 1,000kW, allowing mining sites to scale based on evolving demand. Featuring a customized high-flow pump system and a dedicated power control cabinet, this solution ensures reliable management across multiple racks—eliminating the need for major infrastructure overhauls as your hashrate grows.

L:850mm、W:1000mm、H:2130mm
L:800mm、W:950mm、H:2080mm
230KG
| Model | AP-EM20 | Installed capacity | 20 Seat |
| Installed powerload | 200 kW | Power of the light-duty vertical multistage pump | 4 kW |
| Power of the fluid replenishing pump | 0.2 kW | Total power of the dry cooling tower fan | 8.3 kW |
| Total power of the closed cooling tower fan | 3 kW | Total power of the closed cooling tower spray pump | 1.1 kW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 0-50 ℃ |
| Coolant circulation demand of a single machine | ≥0.6 m³/h | Total demand for circulating coolant within the system | ≥0.25 m³ |
| Residual Current Circuit Breaker | 400 A | Contactor | 9 A |
| Intermediate relay | 24 V | CUL certified frequency converter | 380 V |

Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 120 kW |
| 12 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Professional Home Setups |
Compare

| 200 kW |
| 20 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Modular Facility Scaling |

| 1.6 MW |
| 160 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Industrial Mining Projects |

| 2.4 MW |
| 240 Slots |
| 1,3716 × 2,438 × 2,896 mm |
| Mega-Scale Global Farms |
View All >>

Operating two independent 1-to-1 systems with dedicated dry coolers to ensure maximum redundancy for 2U hydro miners in a high-heat environment.
System Redundancy
Thermal Stability
Independent Cluster
View All >>

Utilizing one centralized high-flow CDU and a standalone power cabinet to drive five 20-slot racks, supporting a 100-unit Whatsminer 2U cluster.
Space Efficiency
Setup TimeSetup Time
Total Capacity
View All >>
“
"Deploying two separate 1-to-1 systems was a practical choice for our site. Since each 20-slot rack has its own dedicated CDU and radiator, we have complete redundancy. If we need to perform maintenance on one loop, the other rack continues to hash without any interruption. It’s a very reliable way to manage our 2U hardware."
— Infrastructure Lead, Oman Mining Site
"The 1-to-5 configuration allowed us to scale our hashrate quickly while keeping the warehouse organized. The customized high-flow CDU maintains perfect water pressure across all 100 miners. Having a dedicated power cabinet for the whole cluster makes electrical monitoring much easier and safer for our technicians."
— Site Manager, SE Asia Facility
Global Deployment
Cumulative delivered cooling capacity
Serving Mining Sites
Countries and regions covered
Can a 200kW cooling rack run 20 WhatsMiner Hydro miners?
Yes, provided the combined miner load remains within the system's 200kW capacity.
The rack provides 20 individual miner positions and is designed for compatible WhatsMiner M53, M63, and M73 series Hydro miners. Actual total power should always be calculated according to the exact miner model and operating mode before deployment.
Does this cooling rack support overclocked WhatsMiner Hydro miners?
Yes. The system is designed to support high-power and overclocked WhatsMiner Hydro mining deployments.
With up to 200kW of miner load capacity, it provides sufficient cooling and circulation capacity for high-performance operation. The actual number of miners and overclocking level should be configured according to the combined power consumption of the installed miners to keep the total load within the system's rated capacity.
Can different WhatsMiner Hydro models be installed in the same rack?
Compatible M53, M63, and M73 series miners can be deployed in the same rack, provided their physical dimensions, electrical requirements, cooling connections, and total power load are compatible with the system.
The exact miner combination should be confirmed before installation, especially when mixing different generations or power levels.
How does the system keep sufficient coolant flow across 20 miners?
The rack uses a centralized circulation system with automatic pressure regulation and constant-flow PLC control.
The system has a rated circulation flow of 13m³/h, while each miner branch requires sufficient individual coolant flow. Correct flow distribution is important because adequate total system flow does not automatically guarantee equal flow through every miner.
Are the quick connectors included with the cooling rack?
Yes. The required quick connectors are prepared and installed before shipment according to the compatible WhatsMiner Hydro miners.
During installation, the miner's cooling inlet and outlet can be connected directly to the corresponding supply and return lines on the rack, reducing on-site piping work and simplifying deployment.
Can individual miners be managed without controlling the entire rack?
Yes. Each miner position is designed with individual control, while the complete cooling rack is centrally managed through a PLC system.
The PLC monitors key operating conditions such as power, coolant temperature, flow, pressure, and network status. MODBUS-RTU communication is also supported for integration with site-level monitoring and control systems.
What electrical infrastructure is required for a fully loaded 20-miner rack?
A 20-miner Hydro deployment requires industrial three-phase electrical infrastructure sized for the actual miner load plus the cooling and control equipment.
The system should not be sized only around the miners' nominal power. Pumps, control equipment, external heat-rejection equipment, circuit protection, cables, and any planned high-performance or overclocking modes should also be included in the electrical design.
Can multiple 200kW racks be added as the mining farm expands?
Yes. The rack-based design is suitable for modular expansion.
A site can start with one 20-miner rack and add additional racks as power and cooling capacity become available. For larger deployments, the total electrical capacity, coolant distribution, pumping system, heat-rejection capacity, piping layout, and centralized monitoring should be planned at the site level rather than treating each rack independently.
CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available
Show 11 more models
Designed for efficient and flexible ASIC mining deployment, this 20-slot split-type hydro cooling cabinet supports up to 200kW of cooling capacity for WhatsMiner hydro miners.
Its separated cabinet and heat dissipation design allows the cooling equipment to be positioned according to actual site conditions, making installation easier across different mining environments. The system can be paired with a customized CDU and heat rejection equipment based on the required cooling load, miner configuration, and deployment space.
With a practical modular structure, it provides a reliable starting point for hydro-cooled mining operations while leaving room for future system adjustments and expansion.
Core Advantages

The rack, CDU, power cabinet, and controller are all built into one single cabinet. Once delivered, simply connect the water pipes and power cables to start running—no complex assembly required.

High-seal manifolds and reinforced pipes prevent coolant leaks at the source. Red and blue valves control hot and cold water; simply turn them off to isolate lines during maintenance with zero spills.

The PDU power panel features a 1-to-1 breaker design, giving every single miner its own dedicated switch. If one unit needs servicing, just trip its specific breaker without affecting the rest of the rack.

A water-sensing rope is installed along the bottom edge of the cabinet. If coolant leaks to the floor, it triggers an instant alarm so onsite staff can fix it before any miners get damaged.

Features 304 stainless steel manifolds, industry-standard aviation plugs, and reinforced high-pressure tubing with manual ball valves. Solidly sealed and durable for long-term use.

The CDU shown is fully customizable and expandable. We can adjust its cooling capacity, pump specs, and expansion ports based on your specific site conditions, miner count, and heat rejection equipment.
Modular 1-to-N Infrastructure Scalability
The 1-to-N modular design enables flexible power expansion from 200kW up to 1,000kW, allowing mining sites to scale based on evolving demand. Featuring a customized high-flow pump system and a dedicated power control cabinet, this solution ensures reliable management across multiple racks—eliminating the need for major infrastructure overhauls as your hashrate grows.

Full Specifications
L:850mm、W:1000mm、H:2130mm
L:800mm、W:950mm、H:2080mm
230KG
| Model | AP-EM20 | Installed capacity | 20 Seat |
| Installed powerload | 200 kW | Power of the light-duty vertical multistage pump | 4 kW |
| Power of the fluid replenishing pump | 0.2 kW | Total power of the dry cooling tower fan | 8.3 kW |
| Total power of the closed cooling tower fan | 3 kW | Total power of the closed cooling tower spray pump | 1.1 kW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 0-50 ℃ |
| Coolant circulation demand of a single machine | ≥0.6 m³/h | Total demand for circulating coolant within the system | ≥0.25 m³ |
| Residual Current Circuit Breaker | 400 A | Contactor | 9 A |
| Intermediate relay | 24 V | CUL certified frequency converter | 380 V |

Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 120 kW |
| 12 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Professional Home Setups |
Compare

| 200 kW |
| 20 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Modular Facility Scaling |

| 1.6 MW |
| 160 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Industrial Mining Projects |

| 2.4 MW |
| 240 Slots |
| 1,3716 × 2,438 × 2,896 mm |
| Mega-Scale Global Farms |
View All >>

Operating two independent 1-to-1 systems with dedicated dry coolers to ensure maximum redundancy for 2U hydro miners in a high-heat environment.
System Redundancy
Thermal Stability
Independent Cluster
View All >>

Utilizing one centralized high-flow CDU and a standalone power cabinet to drive five 20-slot racks, supporting a 100-unit Whatsminer 2U cluster.
Space Efficiency
Setup TimeSetup Time
Total Capacity
View All >>
“
"Deploying two separate 1-to-1 systems was a practical choice for our site. Since each 20-slot rack has its own dedicated CDU and radiator, we have complete redundancy. If we need to perform maintenance on one loop, the other rack continues to hash without any interruption. It’s a very reliable way to manage our 2U hardware."
— Infrastructure Lead, Oman Mining Site
"The 1-to-5 configuration allowed us to scale our hashrate quickly while keeping the warehouse organized. The customized high-flow CDU maintains perfect water pressure across all 100 miners. Having a dedicated power cabinet for the whole cluster makes electrical monitoring much easier and safer for our technicians."
— Site Manager, SE Asia Facility
Cumulative delivered cooling capacity
Countries and regions covered
Yes, provided the combined miner load remains within the system's 200kW capacity.
The rack provides 20 individual miner positions and is designed for compatible WhatsMiner M53, M63, and M73 series Hydro miners. Actual total power should always be calculated according to the exact miner model and operating mode before deployment.
Yes. The system is designed to support high-power and overclocked WhatsMiner Hydro mining deployments.
With up to 200kW of miner load capacity, it provides sufficient cooling and circulation capacity for high-performance operation. The actual number of miners and overclocking level should be configured according to the combined power consumption of the installed miners to keep the total load within the system's rated capacity.
Compatible M53, M63, and M73 series miners can be deployed in the same rack, provided their physical dimensions, electrical requirements, cooling connections, and total power load are compatible with the system.
The exact miner combination should be confirmed before installation, especially when mixing different generations or power levels.
The rack uses a centralized circulation system with automatic pressure regulation and constant-flow PLC control.
The system has a rated circulation flow of 13m³/h, while each miner branch requires sufficient individual coolant flow. Correct flow distribution is important because adequate total system flow does not automatically guarantee equal flow through every miner.
Yes. The required quick connectors are prepared and installed before shipment according to the compatible WhatsMiner Hydro miners.
During installation, the miner's cooling inlet and outlet can be connected directly to the corresponding supply and return lines on the rack, reducing on-site piping work and simplifying deployment.
Yes. Each miner position is designed with individual control, while the complete cooling rack is centrally managed through a PLC system.
The PLC monitors key operating conditions such as power, coolant temperature, flow, pressure, and network status. MODBUS-RTU communication is also supported for integration with site-level monitoring and control systems.
A 20-miner Hydro deployment requires industrial three-phase electrical infrastructure sized for the actual miner load plus the cooling and control equipment.
The system should not be sized only around the miners' nominal power. Pumps, control equipment, external heat-rejection equipment, circuit protection, cables, and any planned high-performance or overclocking modes should also be included in the electrical design.
Yes. The rack-based design is suitable for modular expansion.
A site can start with one 20-miner rack and add additional racks as power and cooling capacity become available. For larger deployments, the total electrical capacity, coolant distribution, pumping system, heat-rejection capacity, piping layout, and centralized monitoring should be planned at the site level rather than treating each rack independently.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop