Bitmain ANTRACK AR30 200kW For 20 Units Antminer 2U Hydro Miner Heat Recovery
In stock
$16,000.00
A scalable 200kW hydro cooling system for 20 WhatsMiner units, featuring a modular split design and customizable CDU and heat rejection equipment. Built to support flexible deployment and future mining expansion.
Contact us for price
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available

230 Th/s · 29 J/Th
20 Slots
Full‑load: $169.60/day

260 Th/s · 26 J/Th
20 Slots
Full‑load: $191.60/day

300 Th/s · 22.8 J/Th
20 Slots
Full‑load: $221.20/day

320 Th/s · 22 J/Th
20 Slots
Full‑load: $236.00/day

366 Th/s · 19.9 J/Th
20 Slots
Full‑load: $269.80/day

390 Th/s · 18.5 J/Th
20 Slots
Full‑load: $287.60/day

450 Th/s · 17 J/Th
20 Slots
Full‑load: $331.80/day

424 Th/s · 15.5 J/Th
20 Slots
Full‑load: $312.60/day

540 Th/s · 17 J/Th
20 Slots
Full‑load: $398.20/day

592 Th/s · 15.5 J/Th
20 Slots
Full‑load: $436.40/day

526 Th/s · 14.5 J/Th
20 Slots
Full‑load: $387.80/day

552 Th/s · 13.5 J/Th
20 Slots
Full‑load: $407.00/day

600 Th/s · 12.5 J/Th
20 Slots
Full‑load: $442.40/day

592 Th/s · 15.5 J/Th
20 Slots
Full‑load: $436.40/day

20 Slots
Built for mining operations that require greater flexibility for future growth, this 20-slot split-type hydro cooling cabinet provides up to 200kW of cooling capacity for WhatsMiner hydro miners.
The modular architecture separates the miner cabinet from the heat rejection system, allowing CDU capacity and cooling equipment to be configured around actual operating requirements. As your mining capacity grows, the cooling infrastructure can be adapted to accommodate additional cooling demand, site conditions, and deployment layouts.
From initial installation to phased expansion, the PLUS version offers a customizable approach to hydro cooling, helping operators build a more adaptable and future-ready mining infrastructure.
Core Advantages

The CDU cabinet and mining rack are built separately for flexible layout. Connected via quick couplings, this split design saves floor space and makes future capacity expansion easier.

Uses high-pressure hoses with red and blue color coding for hot return and cold supply water. The clear piping layout ensures balanced flow distribution and easy troubleshooting.

Integrates a network switch at the top for clean cabling, plus 1-to-1 breakers for each miner. Shut down an individual unit for servicing without disrupting the rest of the rack.

Equipped with a stainless steel expansion tank to absorb pressure fluctuations, release air, and auto-refill fluid. It keeps water pressure stable and protects cold plates from pressure spikes.

Features an HD industrial touch screen displaying real-time system data. The PLC control system supports customization (languages, parameters, and control logic) to meet your specific site needs.

Matches with an outdoor dry cooler featuring large fans and cooling pads. It rapidly dissipates 200kW of heat even in hot ambient temperatures, ensuring long-term stable cooling.
Modular 1-to-N Infrastructure Scalability
The 1-to-N modular design enables flexible power expansion from 200kW up to 1,000kW, allowing mining sites to scale based on evolving demand. Featuring a customized high-flow pump system and a dedicated power control cabinet, this solution ensures reliable management across multiple racks—eliminating the need for major infrastructure overhauls as your hashrate grows.

800mm*950mm*2160mm
750mm*900mm*2110mm
250KG
| Model | AP-EM20 PLUS | Installed capacity | 20 seat |
| Heat-sinking Capabilit | 200 kW @ 35°C | Certification | UL/CE certification |
| System Composition | Dry cooler *1 Cabinet*1+CDU&PLC+External Piping | System Energy Consumption | 10 kW |
| Heat Dissipation Capacity | >210 kW | Environmental Suitability | -20℃~45℃ |
| Import | Three-Phase, 380–415 V, 50 Hz | Cabinet Specifications | 40U Standard Cabinet |
| Constant Temperature Mode | Variable frequency speed control of AC fan+EC fan stepwise regulation | Pump | 3kW*1 |
| Cabinet Dimensions | 800*950*2160 MM | Cabinet Weight | 250 KG |
| Control Cabinet Dimensions | 600*1100*2160 MM | Weight of The Control Cabinet | 250 KG |
| Dry Cooler Dimensions | 2600*1850*2000 MM | Weight of The Dry Cooler | 800 KG |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 120 kW |
| 12 Slots |
| 850 × 1000 × 2130 mm |
| Compact Home Deployments |
Compare

| 200 kW |
| 20 Slots |
| 800 × 950 × 2160 mm |
| Customizable Modular Layouts |

| 1.6 MW |
| 160 Slots |
| 6058 × 2438 × 2896 mm |
| Industrial Mining Projects |

| 2.4 MW |
| 240 Slots |
| 13716 × 2438 × 2896 mm |
| Mega-Scale Industrial Facilities |
View All >>

Achieving highly flexible modular scaling using custom-sized CDUs.
Space Optimization
Capex Saved
Annual Savings
View All >>

Optimizing small-scale indoor operations with modular integration.
Clean Energy Uptime
On-site Civil Costs
System Reliability
View All >>
“
"Being able to run a 1-to-4 setup with a single custom-sized CDU was a massive CapEx saver. We easily expanded our Denver facility from one rack to four without buying extra cooling units."
— VP of Operations, Denver Mining Site, USA
"We deployed a neat 1-to-1 indoor rack setup in Geneva. The centralized CDU manages both cabinets quietly and efficiently, making it a highly elegant, space-saving solution for our localized facility."
— O&M Director, Geneva Mining Site, Switzerland
Global Deployment
Cumulative delivered cooling capacity
Serving Mining Sites
Countries and regions covered
What is the main advantage of this modular rack compared with an integrated 200kW cooling rack?
The main advantage is the centralized CDU architecture.
Instead of equipping every 200kW rack with a complete independent cooling-control system, the CDU can be sized according to the number of racks in the project. This reduces duplicated equipment and makes future multi-rack expansion easier and more cost-efficient.
Can one CDU support multiple 200kW cooling racks?
Yes. The CDU capacity can be customized according to the number of racks connected to the cooling system.
For example, a 400kW CDU can be configured for two 200kW racks, while an 800kW CDU can be designed for four racks. This allows the cooling infrastructure to grow together with the mining capacity instead of adding a separate CDU for every rack.
Can I start with one rack and expand the system later?
Yes. The modular architecture is designed for phased deployment.
You can begin with one 200kW rack and add additional racks as more electrical and mining capacity becomes available. If future expansion is planned from the beginning, the CDU, main piping, electrical distribution, and heat-rejection equipment can be sized with the next deployment stage in mind.
Can one rack support 20 high-power or overclocked WhatsMiner Hydro miners?
Yes. Each rack is designed for up to 20 compatible WhatsMiner 2U Hydro miners with a total miner load of up to 200kW.
The system is suitable for high-power and overclocked mining configurations, provided the combined operating power of the miners remains within the rack's 200kW design capacity.
How does a shared CDU maintain stable cooling across multiple racks?
The CDU is engineered according to the total number of connected racks and the required cooling load.
The control system continuously monitors key operating conditions such as coolant flow, pressure, and temperature, helping maintain balanced circulation as additional racks are connected to the centralized cooling loop.
Can individual miners be powered down for maintenance without stopping the other miners?
Yes. Each miner position is equipped with an independent power switch and circuit breaker.
This allows operators to power down and service an individual miner without shutting down the other operating slots, which is especially useful in a 20-miner high-density rack.
Does a 200kW rack mean the site only needs 200kW of electrical capacity?
No. The 200kW rating refers to the installed miner capacity.
The cooling system also consumes power for the CDU, circulation pump, controls, and heat-rejection equipment. The complete system is rated at approximately 10kW of auxiliary energy consumption, so this load and an appropriate electrical margin should be included when planning the site's total power capacity.
When is this modular Plus architecture the better choice?
This architecture is especially suitable when you plan to deploy multiple WhatsMiner Hydro racks or expect the mining site to expand over time.
The standard rack format and centralized CDU design reduce duplicated cooling infrastructure, improve space utilization, and make it easier to scale from a single 200kW rack into a larger multi-rack mining system without redesigning the cooling architecture each time.
CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available
Show 11 more models
Built for mining operations that require greater flexibility for future growth, this 20-slot split-type hydro cooling cabinet provides up to 200kW of cooling capacity for WhatsMiner hydro miners.
The modular architecture separates the miner cabinet from the heat rejection system, allowing CDU capacity and cooling equipment to be configured around actual operating requirements. As your mining capacity grows, the cooling infrastructure can be adapted to accommodate additional cooling demand, site conditions, and deployment layouts.
From initial installation to phased expansion, the PLUS version offers a customizable approach to hydro cooling, helping operators build a more adaptable and future-ready mining infrastructure.
Core Advantages

The CDU cabinet and mining rack are built separately for flexible layout. Connected via quick couplings, this split design saves floor space and makes future capacity expansion easier.

Uses high-pressure hoses with red and blue color coding for hot return and cold supply water. The clear piping layout ensures balanced flow distribution and easy troubleshooting.

Integrates a network switch at the top for clean cabling, plus 1-to-1 breakers for each miner. Shut down an individual unit for servicing without disrupting the rest of the rack.

Equipped with a stainless steel expansion tank to absorb pressure fluctuations, release air, and auto-refill fluid. It keeps water pressure stable and protects cold plates from pressure spikes.

Features an HD industrial touch screen displaying real-time system data. The PLC control system supports customization (languages, parameters, and control logic) to meet your specific site needs.

Matches with an outdoor dry cooler featuring large fans and cooling pads. It rapidly dissipates 200kW of heat even in hot ambient temperatures, ensuring long-term stable cooling.
Modular 1-to-N Infrastructure Scalability
The 1-to-N modular design enables flexible power expansion from 200kW up to 1,000kW, allowing mining sites to scale based on evolving demand. Featuring a customized high-flow pump system and a dedicated power control cabinet, this solution ensures reliable management across multiple racks—eliminating the need for major infrastructure overhauls as your hashrate grows.

Full Specifications
800mm*950mm*2160mm
750mm*900mm*2110mm
250KG
| Model | AP-EM20 PLUS | Installed capacity | 20 seat |
| Heat-sinking Capabilit | 200 kW @ 35°C | Certification | UL/CE certification |
| System Composition | Dry cooler *1 Cabinet*1+CDU&PLC+External Piping | System Energy Consumption | 10 kW |
| Heat Dissipation Capacity | >210 kW | Environmental Suitability | -20℃~45℃ |
| Import | Three-Phase, 380–415 V, 50 Hz | Cabinet Specifications | 40U Standard Cabinet |
| Constant Temperature Mode | Variable frequency speed control of AC fan+EC fan stepwise regulation | Pump | 3kW*1 |
| Cabinet Dimensions | 800*950*2160 MM | Cabinet Weight | 250 KG |
| Control Cabinet Dimensions | 600*1100*2160 MM | Weight of The Control Cabinet | 250 KG |
| Dry Cooler Dimensions | 2600*1850*2000 MM | Weight of The Dry Cooler | 800 KG |
Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 120 kW |
| 12 Slots |
| 850 × 1000 × 2130 mm |
| Compact Home Deployments |
Compare

| 200 kW |
| 20 Slots |
| 800 × 950 × 2160 mm |
| Customizable Modular Layouts |

| 1.6 MW |
| 160 Slots |
| 6058 × 2438 × 2896 mm |
| Industrial Mining Projects |

| 2.4 MW |
| 240 Slots |
| 13716 × 2438 × 2896 mm |
| Mega-Scale Industrial Facilities |
View All >>

Achieving highly flexible modular scaling using custom-sized CDUs.
Space Optimization
Capex Saved
Annual Savings
View All >>

Optimizing small-scale indoor operations with modular integration.
Clean Energy Uptime
On-site Civil Costs
System Reliability
View All >>
“
"Being able to run a 1-to-4 setup with a single custom-sized CDU was a massive CapEx saver. We easily expanded our Denver facility from one rack to four without buying extra cooling units."
— VP of Operations, Denver Mining Site, USA
"We deployed a neat 1-to-1 indoor rack setup in Geneva. The centralized CDU manages both cabinets quietly and efficiently, making it a highly elegant, space-saving solution for our localized facility."
— O&M Director, Geneva Mining Site, Switzerland
Cumulative delivered cooling capacity
Countries and regions covered
The main advantage is the centralized CDU architecture.
Instead of equipping every 200kW rack with a complete independent cooling-control system, the CDU can be sized according to the number of racks in the project. This reduces duplicated equipment and makes future multi-rack expansion easier and more cost-efficient.
Yes. The CDU capacity can be customized according to the number of racks connected to the cooling system.
For example, a 400kW CDU can be configured for two 200kW racks, while an 800kW CDU can be designed for four racks. This allows the cooling infrastructure to grow together with the mining capacity instead of adding a separate CDU for every rack.
Yes. The modular architecture is designed for phased deployment.
You can begin with one 200kW rack and add additional racks as more electrical and mining capacity becomes available. If future expansion is planned from the beginning, the CDU, main piping, electrical distribution, and heat-rejection equipment can be sized with the next deployment stage in mind.
Yes. Each rack is designed for up to 20 compatible WhatsMiner 2U Hydro miners with a total miner load of up to 200kW.
The system is suitable for high-power and overclocked mining configurations, provided the combined operating power of the miners remains within the rack's 200kW design capacity.
The CDU is engineered according to the total number of connected racks and the required cooling load.
The control system continuously monitors key operating conditions such as coolant flow, pressure, and temperature, helping maintain balanced circulation as additional racks are connected to the centralized cooling loop.
Yes. Each miner position is equipped with an independent power switch and circuit breaker.
This allows operators to power down and service an individual miner without shutting down the other operating slots, which is especially useful in a 20-miner high-density rack.
No. The 200kW rating refers to the installed miner capacity.
The cooling system also consumes power for the CDU, circulation pump, controls, and heat-rejection equipment. The complete system is rated at approximately 10kW of auxiliary energy consumption, so this load and an appropriate electrical margin should be included when planning the site's total power capacity.
This architecture is especially suitable when you plan to deploy multiple WhatsMiner Hydro racks or expect the mining site to expand over time.
The standard rack format and centralized CDU design reduce duplicated cooling infrastructure, improve space utilization, and make it easier to scale from a single 200kW rack into a larger multi-rack mining system without redesigning the cooling architecture each time.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop