12-Slot 120kW Avalon 2U Hydro Cooling Rack
In stock
$7,180.00 – $8,450.00
This modular Avalon hydro cooling cabinet features 200kW cooling capacity and supports up to 20 Avalon A1566HA hydro miners. Designed for scalable Bitcoin mining deployments, it supports customized CDU integration, multi-cabinet expansion, and optional dry cooler or closed-loop cooling tower configurations.
$12,350.00
In stock
Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
CONTAINER CAPACITY
ASIC MINERS
Housed at full load
TOTAL POWER
Continuous electrical load
FORM FACTOR
Standard
COOLING
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available

660 Th/s · 12.5 J/Th
20 Slots
Full‑load: $486.60/day

35 Gh/s · 165 J/Gh
20 Slots
Full‑load: $249.00/day

27 Gh/s · 210 J/Gh
20 Slots
Full‑load: $192.20/day

480 Th/s · 16.8 J/Th
20 Slots
Full‑load: $353.80/day

32 Gh/s · 248.4 J/Gh
20 Slots
Full‑load: $227.60/day
Designed for flexible Avalon 2U hydro mining deployments, this 20-slot 200kW split-type hydro cooling rack provides a scalable foundation for customized mining infrastructure.
The separated rack and heat dissipation configuration allows the cooling system to be arranged according to available space, site conditions, and project requirements. Its modular architecture supports customized CDU capacity, pump configuration, and heat rejection equipment, making it easier to match different cooling loads and deployment plans. The system can also be expanded with additional cooling or supporting equipment as mining capacity grows.
Suitable for warehouses, indoor facilities, and phased mining projects, it provides a flexible approach to building and upgrading hydro-cooled mining infrastructure.
Core Advantages

The rack, CDU, power cabinet, and controller are all built into one single cabinet. Once delivered, simply connect the water pipes and power cables to start running—no complex assembly required.

High-seal manifolds and reinforced pipes prevent coolant leaks at the source. Red and blue valves control hot and cold water; simply turn them off to isolate lines during maintenance with zero spills.

The PDU power panel features a 1-to-1 breaker design, giving every single miner its own dedicated switch. If one unit needs servicing, just trip its specific breaker without affecting the rest of the rack.

A water-sensing rope is installed along the bottom edge of the cabinet. If coolant leaks to the floor, it triggers an instant alarm so onsite staff can fix it before any miners get damaged.

Features 304 stainless steel manifolds, industry-standard aviation plugs, and reinforced high-pressure tubing with manual ball valves. Solidly sealed and durable for long-term use.

The CDU shown is fully customizable and expandable. We can adjust its cooling capacity, pump specs, and expansion ports based on your specific site conditions, miner count, and heat rejection equipment.
Modular 1-to-N Infrastructure Scalability
The 1-to-N modular design enables flexible power expansion from 200kW up to 1,000kW, allowing mining sites to scale based on evolving demand. Featuring a customized high-flow pump system and a dedicated power control cabinet, this solution ensures reliable management across multiple racks—eliminating the need for major infrastructure overhauls as your hashrate grows.

L:850mm、W:1000mm、H:2130mm
L:800mm、W:950mm、H:2080mm
230KG
| Model | AP-X20 | Installed capacity | 20 Seat |
| Installed powerload | 200 kW | Power of the light-duty vertical multistage pump | 4 kW |
| Power of the fluid replenishing pump | 0.2 kW | Total power of the dry cooling tower fan | 8.3 kW |
| Total power of the closed cooling tower fan | 2.2 kW | Total power of the closed cooling tower spray pump | 0.75 kW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 0-50 ℃ |
| Coolant circulation demand of a single machine | ≥0.5 m³/h | Total demand for circulating coolant within the system | ≥0.25 m³ |
| Residual Current Circuit Breaker | 400 A | Contactor | 9 A |
| Intermediate relay | 24 V | CUL certified frequency converter | 380 V |

Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 120 kW |
| 12 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Professional Home Setups |
Compare

| 200 kW |
| 20 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Modular Facility Scaling |

| 1 MW |
| 100 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Compact Mining Sites |

| 1.6 MW |
| 160 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Industrial-Scale Projects |
View All >>

Operating two independent 1-to-1 systems with dedicated dry coolers to ensure maximum redundancy for 2U hydro miners in a high-heat environment.
System Redundancy
Thermal Stability

Utilizing one centralized high-flow CDU and a standalone power cabinet to drive five 20-slot racks, supporting a 100-unit Whatsminer 2U cluster.
Space Efficiency
Setup TimeSetup Time
Total Capacity
“
"Deploying two separate 1-to-1 systems was a practical choice for our site. Since each 20-slot rack has its own dedicated CDU and radiator, we have complete redundancy. If we need to perform maintenance on one loop, the other rack continues to hash without any interruption. It’s a very reliable way to manage our 2U hardware."
— Infrastructure Lead, Oman Mining Site
"The 1-to-5 configuration allowed us to scale our hashrate quickly while keeping the warehouse organized. The customized high-flow CDU maintains perfect water pressure across all 100 miners. Having a dedicated power cabinet for the whole cluster makes electrical monitoring much easier and safer for our technicians."
— Site Manager, SE Asia Facility
Global Deployment
Cumulative delivered cooling capacity
Serving Mining Sites
Countries and regions covered
Can this rack run 20 Avalon A1566HA Hydro miners at the same time?
Yes. The rack is designed for up to 20 Avalon A1566HA Hydro miners and provides up to 200kW of installed miner capacity.
For example, the A1566HA 500T is rated at approximately 8.064kW per miner, so 20 units require about 161kW at rated power. This keeps a fully populated rack comfortably within the 200kW system capacity.
Why is the rack rated at 200kW when 20 A1566HA miners use less than 200kW?
The additional capacity provides operating headroom rather than sizing the cooling infrastructure exactly to the miners' nominal power.
This gives the system more flexibility for different A1566HA versions, normal power variation, and continuous high-load operation while avoiding a design that operates permanently at its maximum capacity.
Can different A1566HA versions be installed in the same rack?
Yes. Compatible A1566HA Hydro versions can be installed together in the same 20-slot rack.
For example, the 500T and 460T versions use the same 2U-sized chassis dimensions, while their rated power differs slightly. This allows operators to replace or add miners without requiring every slot to use exactly the same hashrate version.
Is 11m³/h enough coolant circulation for all 20 miners?
Yes. The CDU provides a rated flow of 11m³/h, while the cooling system specifies a minimum circulation requirement of 0.5m³/h per miner.
Twenty miners therefore require a minimum combined branch flow of approximately 10m³/h, and the system is designed around this full-rack circulation requirement.
How does the system keep coolant flow stable across 20 parallel miner branches?
The CDU uses PLC-based constant-flow control together with centralized circulation and pressure management.
Rather than relying only on a fixed pump output, the control system monitors operating conditions such as coolant flow, temperature, and pressure to support stable circulation as the rack operates under changing load conditions.
Does every 20-miner rack need its own CDU?
No. The split-type architecture supports both standalone and multi-cabinet configurations.
For larger projects, CDU capacity can be customized so multiple Avalon cooling racks share centralized cooling infrastructure. This reduces duplicated equipment and makes it easier to expand from a single 200kW rack toward a larger mining system.
Can I start with one Avalon rack and expand the cooling system later?
Yes. The system is designed for modular expansion from approximately 200kW up to 1000kW.
If future growth is planned from the beginning, the CDU, main piping, heat-rejection equipment, and monitoring infrastructure can be sized for additional racks, allowing mining capacity to be added without redesigning the entire cooling architecture.
When is this rack a better choice than building a custom cooling loop for Avalon miners?
This rack is a strong choice when you want a standardized 20-miner deployment instead of separately designing the manifold, circulation system, controls, electrical cabinet, and external heat-rejection system.
The rack, intelligent CDU, PLC control, and optional dry cooler or closed-loop cooling tower are designed as one coordinated cooling architecture, reducing the amount of engineering that must be completed separately on site.
CONTAINER CAPACITY
Standard
Thermal management
POWER INPUT
380V–415V AC 50/60Hz
AVAILABILITY
Typical lead time 15 days • DDP Sea Shipping Available
Show 1 more models
Designed for flexible Avalon 2U hydro mining deployments, this 20-slot 200kW split-type hydro cooling rack provides a scalable foundation for customized mining infrastructure.
The separated rack and heat dissipation configuration allows the cooling system to be arranged according to available space, site conditions, and project requirements. Its modular architecture supports customized CDU capacity, pump configuration, and heat rejection equipment, making it easier to match different cooling loads and deployment plans. The system can also be expanded with additional cooling or supporting equipment as mining capacity grows.
Suitable for warehouses, indoor facilities, and phased mining projects, it provides a flexible approach to building and upgrading hydro-cooled mining infrastructure.
Core Advantages

The rack, CDU, power cabinet, and controller are all built into one single cabinet. Once delivered, simply connect the water pipes and power cables to start running—no complex assembly required.

High-seal manifolds and reinforced pipes prevent coolant leaks at the source. Red and blue valves control hot and cold water; simply turn them off to isolate lines during maintenance with zero spills.

The PDU power panel features a 1-to-1 breaker design, giving every single miner its own dedicated switch. If one unit needs servicing, just trip its specific breaker without affecting the rest of the rack.

A water-sensing rope is installed along the bottom edge of the cabinet. If coolant leaks to the floor, it triggers an instant alarm so onsite staff can fix it before any miners get damaged.

Features 304 stainless steel manifolds, industry-standard aviation plugs, and reinforced high-pressure tubing with manual ball valves. Solidly sealed and durable for long-term use.

The CDU shown is fully customizable and expandable. We can adjust its cooling capacity, pump specs, and expansion ports based on your specific site conditions, miner count, and heat rejection equipment.
Modular 1-to-N Infrastructure Scalability
The 1-to-N modular design enables flexible power expansion from 200kW up to 1,000kW, allowing mining sites to scale based on evolving demand. Featuring a customized high-flow pump system and a dedicated power control cabinet, this solution ensures reliable management across multiple racks—eliminating the need for major infrastructure overhauls as your hashrate grows.

Full Specifications
L:850mm、W:1000mm、H:2130mm
L:800mm、W:950mm、H:2080mm
230KG
| Model | AP-X20 | Installed capacity | 20 Seat |
| Installed powerload | 200 kW | Power of the light-duty vertical multistage pump | 4 kW |
| Power of the fluid replenishing pump | 0.2 kW | Total power of the dry cooling tower fan | 8.3 kW |
| Total power of the closed cooling tower fan | 2.2 kW | Total power of the closed cooling tower spray pump | 0.75 kW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 0-50 ℃ |
| Coolant circulation demand of a single machine | ≥0.5 m³/h | Total demand for circulating coolant within the system | ≥0.25 m³ |
| Residual Current Circuit Breaker | 400 A | Contactor | 9 A |
| Intermediate relay | 24 V | CUL certified frequency converter | 380 V |

Complete product specifications, installation guide, and operational instructions.
Our products meet leading international standards for safety, reliability, and performance.

Marine & offshore compliance

Safety tested & certified

North American compliance

European conformity
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
| ❄️ Cooling Capacity |
| ⚙️ Miner Slots |
| 📏 Dimensions (L × W × H) |
| 🏢 Application |

| 120 kW |
| 12 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Professional Home Setups |
Compare

| 200 kW |
| 20 Slots |
| 8,50 × 1,000 × 2,130 mm |
| Modular Facility Scaling |

| 1 MW |
| 100 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Compact Mining Sites |

| 1.6 MW |
| 160 Slots |
| 6,058 × 2,438 × 2,896 mm |
| Industrial-Scale Projects |
View All >>

Operating two independent 1-to-1 systems with dedicated dry coolers to ensure maximum redundancy for 2U hydro miners in a high-heat environment.
System Redundancy
Thermal Stability

Utilizing one centralized high-flow CDU and a standalone power cabinet to drive five 20-slot racks, supporting a 100-unit Whatsminer 2U cluster.
Space Efficiency
Setup TimeSetup Time
Total Capacity
“
"Deploying two separate 1-to-1 systems was a practical choice for our site. Since each 20-slot rack has its own dedicated CDU and radiator, we have complete redundancy. If we need to perform maintenance on one loop, the other rack continues to hash without any interruption. It’s a very reliable way to manage our 2U hardware."
— Infrastructure Lead, Oman Mining Site
"The 1-to-5 configuration allowed us to scale our hashrate quickly while keeping the warehouse organized. The customized high-flow CDU maintains perfect water pressure across all 100 miners. Having a dedicated power cabinet for the whole cluster makes electrical monitoring much easier and safer for our technicians."
— Site Manager, SE Asia Facility
Cumulative delivered cooling capacity
Countries and regions covered
Yes. The rack is designed for up to 20 Avalon A1566HA Hydro miners and provides up to 200kW of installed miner capacity.
For example, the A1566HA 500T is rated at approximately 8.064kW per miner, so 20 units require about 161kW at rated power. This keeps a fully populated rack comfortably within the 200kW system capacity.
The additional capacity provides operating headroom rather than sizing the cooling infrastructure exactly to the miners' nominal power.
This gives the system more flexibility for different A1566HA versions, normal power variation, and continuous high-load operation while avoiding a design that operates permanently at its maximum capacity.
Yes. Compatible A1566HA Hydro versions can be installed together in the same 20-slot rack.
For example, the 500T and 460T versions use the same 2U-sized chassis dimensions, while their rated power differs slightly. This allows operators to replace or add miners without requiring every slot to use exactly the same hashrate version.
Yes. The CDU provides a rated flow of 11m³/h, while the cooling system specifies a minimum circulation requirement of 0.5m³/h per miner.
Twenty miners therefore require a minimum combined branch flow of approximately 10m³/h, and the system is designed around this full-rack circulation requirement.
The CDU uses PLC-based constant-flow control together with centralized circulation and pressure management.
Rather than relying only on a fixed pump output, the control system monitors operating conditions such as coolant flow, temperature, and pressure to support stable circulation as the rack operates under changing load conditions.
No. The split-type architecture supports both standalone and multi-cabinet configurations.
For larger projects, CDU capacity can be customized so multiple Avalon cooling racks share centralized cooling infrastructure. This reduces duplicated equipment and makes it easier to expand from a single 200kW rack toward a larger mining system.
Yes. The system is designed for modular expansion from approximately 200kW up to 1000kW.
If future growth is planned from the beginning, the CDU, main piping, heat-rejection equipment, and monitoring infrastructure can be sized for additional racks, allowing mining capacity to be added without redesigning the entire cooling architecture.
This rack is a strong choice when you want a standardized 20-miner deployment instead of separately designing the manifold, circulation system, controls, electrical cabinet, and external heat-rejection system.
The rack, intelligent CDU, PLC control, and optional dry cooler or closed-loop cooling tower are designed as one coordinated cooling architecture, reducing the amount of engineering that must be completed separately on site.
Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
All products listed on our website are priced in US Dollars.
We accept payments via bank wire transfer or online cryptocurrency payment (BTC, ETH, KAS, USDT, USDC).
If you prefer other payment methods, please contact our sales team.
Important: All cryptocurrency payments received on the website are automatically converted to USDT. If a product is out of stock, we will contact you for a refund. The refund will be based on the USD price at the time of your original order.
We offer DDP (Delivery Duty Paid) shipping to some countries, including the United States, Canada, Russia, Dubai, and certain EU countries.
If you require DDP shipping, please contact our customer service. For countries without DDP shipping or for standard shipping, we can help reduce taxes by providing a lower invoice value.
Customs duties are not included in the total price. You will need to pay them once the goods arrive in your country. Simply contact your local logistics company to settle the fees. If needed, we can provide a commercial invoice with a declared value of your choice.
Please notify us immediately if customs requests documents, as improper filing may lead to higher fees or delays. We can provide the necessary documentation.
For new, factory-sealed miners, the warranty is typically 12 months or 6 months, depending on the factory's policy, starting from the production date.
The company is not responsible for issues resulting from failure to follow the provided instructions, specifications, or alterations to the product.
For used mining machines, there is no warranty or after-sales service; however, before shipment, we will provide mining machine testing videos to ensure you understand its performance. Once you confirm acceptance, we will proceed with full communication and arrange shipment.
Transportation and any other costs related to product returns are the responsibility of the purchaser.
The repair period will depend on the nature of the issue.
Faye was very kind and helpful, even with the time difference. She quickly cleared up my doubts about the L9 miner.
Date of experience : January 31, 2025Order arrived sooner than expected - great experience with Apexto Mining!
Date of experience : March 03, 2025Buying miners from Apexto for 5 years - trustworthy, professional, and delivers quality!
Date of experience : March 03, 2025I'm very satisfied with my purchase (Elphapex Home). Additionally, I must thank Faye for the excellent service she provided; she answered all my questions whenever I needed.
Date of experience : January 20, 2025The customer service on WhatsApp is excellent, and shipping is fast - from Hong Kong to North America without delay. I'm very happy with the experience!
Date of experience : January 31, 2025No products in the cart.
Return To Shop