1.1MW 90-Slot Antminer 3U Hydro Cooling Container (40HQ)

1.1MW 40HQ hydro cooling container with 90 slots for Antminer 3U series. Industrial-grade infrastructure offering an all-in-one stable liquid cooling solution.

Contact us for price

In stock

Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.

Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.

Trusted by

  • Apexto Mining reviews on Trustpilot
  • WhatToMine
  • Kryptex
  • NiceHash

Payment Method

  • USD
  • USDT(TRC 20)
  • KAS
  • BTC
  • ETH
  • LTC
  • DOGE
  • USDC(ERC20)

1.1MW 90-Slot Antminer 3U Hydro Container for Commercial Mining

CONTAINER CAPACITY

ASIC MINERS

90 UNITS

Housed at full load

TOTAL POWER

1100 KW

Continuous electrical load

FORM FACTOR

Custom

Standard

COOLING

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 1 more models

Product Description

Engineered for highly reliable, long-term mining, the 1.1MW 90-Slot Antminer 3U Hydro Cooling Container 40FT HQ is tailored specifically for standard 3U rack-mount server dimensions.

This spacious 40-foot infrastructure utilizes structured enterprise-grade server shelving, allowing heavy 3U hydro ASICs to slide smoothly on integrated guide rails. This roomy, ergonomic cabin layout offers generous physical access, making single-node hot-swapping and routine maintenance incredibly straightforward for onsite engineers.

Equipped with robust power distribution, advanced water circulation, and smart monitoring, this all-in-one system secures highly stable heat dissipation, maximizing hardware lifespans and operational reliability for standard commercial BTC mining sites.

90-Slot Antminer 3U Hydro Cooling Container
Core Advantages

Spacious Cabin Ergonomics

Designed with wide central corridors and generous physical cabinet access, ensuring on-site technicians can perform single-node inspections, hot-swapping, and maintenance tasks with ease.

Individual Power Switches

Equips every 3U server slot with an independent power switch and breaker, enabling safe, isolated maintenance on single nodes without disrupting the rest of the operational units.

Low Thermal Concentration

Spacing out 90 units within a standard 40FT HQ container lowers internal heat density, securing stable thermal performance and reducing the risk of localized hotspots.

Intelligent Management System

Monitors water flow rates, pressure, PUE, and temperatures in real-time, delivering automated malfunction alerts and precise remote system adjustments via mobile or PC applications.

Standardized 3U Server Racking

Tailored specifically for standard 3U rack-mount server dimensions, providing a highly organized, datacenter-grade cabinet layout that optimizes spacing, simplifies water loops, and improves overall site efficiency.

Integrated Precision Guide Rails

Features heavy-duty, integrated stainless steel guide rails for every slot, allowing heavy 3U mining servers to slide smoothly in and out during installation or hot-swapping.

Spacious Cabin Ergonomics

Designed with wide central corridors and generous physical cabinet access, ensuring on-site technicians can perform single-node inspections, hot-swapping, and maintenance tasks with ease.

Individual Power Switches

Equips every 3U server slot with an independent power switch and breaker, enabling safe, isolated maintenance on single nodes without disrupting the rest of the operational units.

Low Thermal Concentration

Spacing out 90 units within a standard 40FT HQ container lowers internal heat density, securing stable thermal performance and reducing the risk of localized hotspots.

Intelligent Management System

Monitors water flow rates, pressure, PUE, and temperatures in real-time, delivering automated malfunction alerts and precise remote system adjustments via mobile or PC applications.

Standardized 3U Server Racking

Tailored specifically for standard 3U rack-mount server dimensions, providing a highly organized, datacenter-grade cabinet layout that optimizes spacing, simplifies water loops, and improves overall site efficiency.

Integrated Precision Guide Rails

Features heavy-duty, integrated stainless steel guide rails for every slot, allowing heavy 3U mining servers to slide smoothly in and out during installation or hot-swapping.

Spacious Cabin Ergonomics

Designed with wide central corridors and generous physical cabinet access, ensuring on-site technicians can perform single-node inspections, hot-swapping, and maintenance tasks with ease.

Individual Power Switches

Equips every 3U server slot with an independent power switch and breaker, enabling safe, isolated maintenance on single nodes without disrupting the rest of the operational units.

Full Specifications

External dimensions

12192mm、W:2438mm、H:2896mm

Internal dimensions

12000mm、W:2230mm、H:2660mm

Weight

7210KG

ModelAP-HC40-A3U90Total Load90 seat
Installed powerload1100kW (including cooling power consumption)System Energy Consumption98 kW
Heat Dissipation Capacity> 1100 KWConstant Temperature ModeVariable frequency speed control of AC fan +<br>AC fan stepwise regulation
FansLarge volume fans: 20 PCSPump18.5 KW * 1
Miner Container Weight7210 KGDry Cooler Weight8130 KG
PUE< 1.05Environmental Adaptability-20°C ~ 45°C
Product Architecture40HQ*2 Stacking DesignSystem CompositionDry cooler container * 1 Device container * 1 (PDC*1 + Cabinet*6 + CDU&PLC*1)
CertificationCE/UL certification/China Classification Society Certification

90-Slot Antminer 3U Hydro Cooling Container Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your container deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × Container

1500 kVA Three-Phase Pad-Mounted Transformer

View 1500 kVA Transformer →

2750 kVA Three-Phase Pad-Mounted Transformer

For 2 × Containers

2750 kVA Three-Phase Pad-Mounted Transformer

View 2750 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

13-Slot Antminer 3U Hydro Cooling Rack

143 kW
13 Slots
850 mm × 1000 mm × 2130 mm
Compact Indoor & Office Racks

Compare

90-Slot Antminer 3U Hydro Container

1.1 MW
90 Slots
12192 × 2438 × 2896 mm
Commercial-Scale Mining

104-Slot Antminer 3U Hydro Container

1.25 MW
104 Slots
12192 × 2438 × 2896 mm
Mid-to-Large Mining Farms

180-Slot Antminer 3U Hydro Container

2.16 MW
180 Slots
12192 × 2438 × 2896 mm
Industrial-Scale Operations

90-Slot Antminer 3U Hydro Cooling Container FAQs

Which Bitmain ASIC models are compatible with this Hydro Container?

This 1.1MW Hydro Mining Container is specifically tailored for Bitmain's 3U server-class ASICs, supporting the Antminer S19 XP Hyd 3U, Antminer S21e XP Hyd 3U, and Antminer S23 Hyd 3U models.

What are the primary advantages of the Container over higher-density setups?

By spacing 90 units in a 40FT HQ Hydro Container, it lowers thermal concentration. This roomy layout provides generous physical cabinet access, reducing localized hotspot risks and simplifying on-site maintenance.

How do the integrated guide rails of the Container simplify manual maintenance?

Designed like enterprise datacenter cabinets, each slot features heavy-duty stainless steel guide rails. This enables onsite technicians to slide heavy 3U mining servers in and out smoothly for effortless, clean maintenance.

Can the this Hydro Cooling Container operate under zero-water-consumption limits?

Yes. By pairing this modular split-system container with customizable external dry coolers instead of cooling towers, operators can achieve a fully closed-loop, water-free setup with zero water consumption in arid regions.

What built-in safety features protect valuable hardware inside the Hydro Container?

This 40FT HQ Liquid Cooling Container integrates dual-pump redundancy for continuous flow, floor-mounted moisture-detecting ropes, and individual power breakers to ensure continuous, zero-risk operations for your high-value server-class miners.

1.1MW 90-Slot Antminer 3U Hydro Container for Commercial Mining

CONTAINER CAPACITY

Housed at full load
90 UNITS
Continuous electrical load
1100 KW

Custom

Standard

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 1 more models

Product Description

Engineered for highly reliable, long-term mining, the 1.1MW 90-Slot Antminer 3U Hydro Cooling Container 40FT HQ is tailored specifically for standard 3U rack-mount server dimensions.

This spacious 40-foot infrastructure utilizes structured enterprise-grade server shelving, allowing heavy 3U hydro ASICs to slide smoothly on integrated guide rails. This roomy, ergonomic cabin layout offers generous physical access, making single-node hot-swapping and routine maintenance incredibly straightforward for onsite engineers.

Equipped with robust power distribution, advanced water circulation, and smart monitoring, this all-in-one system secures highly stable heat dissipation, maximizing hardware lifespans and operational reliability for standard commercial BTC mining sites.

Core Advantages

Spacious Cabin Ergonomics

Designed with wide central corridors and generous physical cabinet access, ensuring on-site technicians can perform single-node inspections, hot-swapping, and maintenance tasks with ease.

Individual Power Switches

Equips every 3U server slot with an independent power switch and breaker, enabling safe, isolated maintenance on single nodes without disrupting the rest of the operational units.

Low Thermal Concentration

Spacing out 90 units within a standard 40FT HQ container lowers internal heat density, securing stable thermal performance and reducing the risk of localized hotspots.

Intelligent Management System

Monitors water flow rates, pressure, PUE, and temperatures in real-time, delivering automated malfunction alerts and precise remote system adjustments via mobile or PC applications.

Standardized 3U Server Racking

Tailored specifically for standard 3U rack-mount server dimensions, providing a highly organized, datacenter-grade cabinet layout that optimizes spacing, simplifies water loops, and improves overall site efficiency.

Integrated Precision Guide Rails

Features heavy-duty, integrated stainless steel guide rails for every slot, allowing heavy 3U mining servers to slide smoothly in and out during installation or hot-swapping.

Spacious Cabin Ergonomics

Designed with wide central corridors and generous physical cabinet access, ensuring on-site technicians can perform single-node inspections, hot-swapping, and maintenance tasks with ease.

Individual Power Switches

Equips every 3U server slot with an independent power switch and breaker, enabling safe, isolated maintenance on single nodes without disrupting the rest of the operational units.

Low Thermal Concentration

Spacing out 90 units within a standard 40FT HQ container lowers internal heat density, securing stable thermal performance and reducing the risk of localized hotspots.

Intelligent Management System

Monitors water flow rates, pressure, PUE, and temperatures in real-time, delivering automated malfunction alerts and precise remote system adjustments via mobile or PC applications.

Standardized 3U Server Racking

Tailored specifically for standard 3U rack-mount server dimensions, providing a highly organized, datacenter-grade cabinet layout that optimizes spacing, simplifies water loops, and improves overall site efficiency.

Integrated Precision Guide Rails

Features heavy-duty, integrated stainless steel guide rails for every slot, allowing heavy 3U mining servers to slide smoothly in and out during installation or hot-swapping.

Spacious Cabin Ergonomics

Designed with wide central corridors and generous physical cabinet access, ensuring on-site technicians can perform single-node inspections, hot-swapping, and maintenance tasks with ease.

Individual Power Switches

Equips every 3U server slot with an independent power switch and breaker, enabling safe, isolated maintenance on single nodes without disrupting the rest of the operational units.

Full Specifications

External dimensions

12192mm、W:2438mm、H:2896mm

Internal dimensions

12000mm、W:2230mm、H:2660mm

Weight

7210KG

ModelAP-HC40-A3U90Total Load90 seat
Installed powerload1100kW (including cooling power consumption)System Energy Consumption98 kW
Heat Dissipation Capacity> 1100 KWConstant Temperature ModeVariable frequency speed control of AC fan +<br>AC fan stepwise regulation
FansLarge volume fans: 20 PCSPump18.5 KW * 1
Miner Container Weight7210 KGDry Cooler Weight8130 KG
PUE< 1.05Environmental Adaptability-20°C ~ 45°C
Product Architecture40HQ*2 Stacking DesignSystem CompositionDry cooler container * 1 Device container * 1 (PDC*1 + Cabinet*6 + CDU&PLC*1)
CertificationCE/UL certification/China Classification Society Certification

90-Slot Antminer 3U Hydro Cooling Container Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your container deployment with the appropriate transformer capacity.

1500 kVA Pad Mount Three-Phase Transformer

For 1 × Container

1500 kVA Three-Phase Pad-Mounted Transformer

View 1500 kVA Transformer →

2750 kVA Three-Phase Pad-Mounted Transformer

For 2 × Containers

2750 kVA Three-Phase Pad-Mounted Transformer

View 2750 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

13-Slot Antminer 3U Hydro Cooling Rack

143 kW
13 Slots
850 mm × 1000 mm × 2130 mm
Compact Indoor & Office Racks

Compare

90-Slot Antminer 3U Hydro Container

1.1 MW
90 Slots
12192 × 2438 × 2896 mm
Commercial-Scale Mining

104-Slot Antminer 3U Hydro Container

1.25 MW
104 Slots
12192 × 2438 × 2896 mm
Mid-to-Large Mining Farms

180-Slot Antminer 3U Hydro Container

2.16 MW
180 Slots
12192 × 2438 × 2896 mm
Industrial-Scale Operations

90-Slot Antminer 3U Hydro Cooling Container FAQs

This 1.1MW Hydro Mining Container is specifically tailored for Bitmain's 3U server-class ASICs, supporting the Antminer S19 XP Hyd 3U, Antminer S21e XP Hyd 3U, and Antminer S23 Hyd 3U models.

By spacing 90 units in a 40FT HQ Hydro Container, it lowers thermal concentration. This roomy layout provides generous physical cabinet access, reducing localized hotspot risks and simplifying on-site maintenance.

This 40FT HQ Liquid Cooling Container integrates dual-pump redundancy for continuous flow, floor-mounted moisture-detecting ropes, and individual power breakers to ensure continuous, zero-risk operations for your high-value server-class miners.

Customize Your Hydro Cooling Solution

Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.

Project Timeline

In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.

Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.

Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.

International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.

*All sales are final and non-refundable. Please understand, this is an industry standard.

Recommended Devices