750 kVA Three-Phase Pad Mounted Transformer

Factory-direct 750 kVA (0.75 MVA) pad-mounted transformers for mining, data center, and industrial power distribution. Available from U.S. stock or with custom voltage configurations.

Contact us for price

Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.

Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.

Trusted by

  • Apexto Mining reviews on Trustpilot
  • WhatToMine
  • Kryptex
  • NiceHash

Payment Method

  • USD
  • USDT(TRC 20)
  • KAS
  • BTC
  • ETH
  • LTC
  • DOGE
  • USDC(ERC20)

Precise 750 KVA Continuous Power. In Stock & Custom Engineered.

Key specifications at a glance for quick reference and confident planning.

Rated Capacity

750 kVA

Feed Type

Loop / Radial

Cooling Medium

ONAN

Frequency

60 Hz

Installation

Outdoor Pad-Mounted

WAREHOUSE LOCATIONS

USA • Canada • UAE • China • Global Dispatch

FAST DISPATCH

Ready Stock • Ships in 1-3 Days • DDP Door-to-Door

Product Profile

The 750 kVA Three-Phase Pad-Mounted Transformer is designed for reliable medium-voltage power distribution in commercial facilities, industrial sites, data centers, and cryptocurrency mining operations. Its compact outdoor enclosure integrates the transformer, switching, and protection components into one secure unit, simplifying installation and reducing the required footprint.

The transformer can be configured with 12.47 kV or 24.94 kV primary voltage and common secondary voltages such as 480Y/277 V or 600Y/347 V. A dead-front loop-feed design, load-break switch, Bay-O-Net and current-limiting fuse protection, and multi-position tap changer can be supplied according to project requirements.

With efficient oil-immersed natural cooling, robust weather-resistant construction, and flexible electrical configurations, the 750 kVA transformer provides a dependable power solution for continuous-duty applications.

Core Advantages

01. High-Efficiency Radiators

Large external radiator panels maximize surface area for natural oil cooling, maintaining stable thermal performance during continuous 24/7 heavy-duty operations.

02. Auxiliary Control Box

Clearly organized terminals and control components simplify field wiring, commissioning, inspection, troubleshooting, and routine maintenance for faster on-site service and support.

03. Integrated Monitoring Panel

Integrated gauges provide clear temperature, pressure, and operating status information, helping technicians identify abnormal conditions quickly during routine transformer inspections and maintenance.

04. Low-Voltage Connection Panel

Clearly marked X0, X1, X2, and X3 terminals simplify low-voltage cable connections, phase identification, installation, inspection, and routine maintenance in the field.

05. High-Voltage Protection

H1, H2, and H3 terminals combine high-voltage connections with protection and voltage adjustment components, supporting safer installation, operation, inspection, and maintenance.

2250 kVA 3-Phase Padmount Transformer Cooling Control Cabinet

06. High-Dielectric Bushing Layout

Heavy-duty high-voltage bushings deliver superior electrical insulation and generous clearance, paired with a rugged steel tank built for decades of reliable service.

Full Specifications

External dimensions

W:1192mm、D:1255mm、H:1250mm

Internal dimensions

W:1142mm、D:1205mm、H:1200mm

Weight

3083KG

Rated Capacity750 kVA / 0.75 MVAPhaseThree Phase
Frequency60 HzPrimary VoltageCustomized (Typical 12.47kV / 13.8kV / 24.94kV / 34.5kV)
Secondary VoltageCustomized (Typical 480Y/277V)Winding ConfigurationDelta – Grounded Wye
Winding MaterialAluminumCooling TypeONAN
Insulation FluidMineral OilTemperature Rise65°C
Impedance5.75%Feed ConfigurationLoop Feed
Connection TypeDead FrontVector GroupProject-Specific; Dyn1 shown on 34.5kV version
Tap Changer5-Position Off-Circuit Tap ChangerTapping Range±2 × 2.5%
Efficiency99.15% / DOE-compliant configurationStandardsIEEE / CSA / DOE

Engineering Documents

Padmount Spec Sheet

Padmount Dimensional Drawings

Padmount Installation Manual

Padmount Test & Warranty Guide

Certifications & Grid Compliance

Fully compliant with UL, CSA, IEEE/ANSI, DOE, and IEC standards. Tested and certified by international authorities to ensure maximum safety, efficiency, and instant approval by local power utilities.

UL/cUL

CSA

CESI

IEEE

IEC

EN00676

AS-NZS

GOST

three phase pad mounted transformer

Infrastructure Capabilities

We supply a full lineup of pad-mount transformers built for heavy-duty power. From 24/7 crypto mining farms to mission-critical data centers, we deliver reliable equipment designed to run non-stop.

We also offer custom engineering tailored to your exact site. From specific high and low voltages to specialized enclosure specs, we customize and deliver units in as fast as 4–6 weeks to get your project powered up on schedule.

Design

Raw Material Procurement

Assembly

Testing

Packaging

Delivery

Request a Project Quote

Tell us about your project or custom requirements. Our power systems engineers will review your specs and provide a tailored proposal.

Submit Inquiry ➔

Global Project References

View All >>

Ashburn, Virginia, USA

750 kVA Pad-Mounted Transformers for Data Center

Dual 1000 kVA three-phase padmount units deployed to support high-density server racks and liquid-to-chip cooling infrastructure for a regional edge compute facility.

13.8 kV

480Y/277V

ONAN 750 kVA

Kern County, California, USA

750 kVA (0.75 MVA) Pad-Mounted Transformer for BESS Storage

Liquid-filled 750 kVA transformer supplied for a commercial battery energy storage system (BESS) integration, providing reliable bidirectional grid stepping.

750kVA

12.47 kV

480Y/277V

West Texas, USA

750 kVA Pad-Mounted Transformer for Crypto Mining Pod

Rugged 750 kVA pad-mount transformer powering hydro-cooled ASIC mining pod, delivering non-stop 415V power under extreme desert heat.

34.5 kV

415Y/240V

99.4% Efficiency

Montreal, Quebec, Canada

4 x 750 kVA Pad-Mounted Transformers for Industrial Grid

Four 750 kVA step-down padmount transformers installed for an advanced manufacturing plant, fully compliant with Hydro-Québec 600V distribution standards.

4 x 750 kVA

24.94 kV GrdY

600Y/347V

Capabilities & Support

24-Month Quality Warranty

Enjoy peace of mind with our 24-month full warranty. If any operational issue arises with your transformer, our dedicated engineering team will resolve it rapidly and reliably.

Local Field Service Team

Whether in North America or global regions, our certified local engineering teams provide professional on-site transformer installation, energization testing, and maintenance.

24/7 Remote Video Support

Connect directly with our senior power engineers via live video for real-time installation guidance, system diagnostics, and instant troubleshooting support, anytime and anywhere.

Spare Parts & Support

We maintain an extensive inventory of genuine spare parts for fast dispatch, paired with lifetime technical guidance to maximize your equipment uptime.

Need a Customized Power & Transformer Solution?

Talk to our engineers to get an optimized configuration and fast quote.

Contact Sales

FAQs

How many amps does a 750 kVA transformer provide at 480V?

A 750 kVA three-phase transformer provides approximately 902A at 480V at full load. This is the key value for sizing the secondary breaker, switchboard, cables, and busway.

Can a 750 kVA transformer use a 1200A main switchboard?

Yes. A 750 kVA transformer produces about 902A at 480V, so a 1200A switchboard is a practical configuration. The final breaker setting and conductor sizing should follow the project load and applicable electrical code.

How much kW can a 750 kVA transformer actually support?

At a 0.95 power factor, 750 kVA equals approximately 712.5 kW of real power. For mining or data center projects, cooling, pumps, controls, and other auxiliary loads must be included in the total demand.

What is the available fault current from a 750 kVA transformer at 480V?

With 5.75% transformer impedance, the transformer-limited fault current is approximately 15.7 kA at 480V. Actual site fault current depends on utility source impedance and conductor impedance and should be confirmed before selecting downstream equipment ratings.

Can I replace an existing 750 kVA pad-mounted transformer without rebuilding the pad?

Often yes, but the dimensions and cable-entry layout must be checked first. Send Apexto the existing nameplate, transformer dimensions, pad opening, and conduit locations so the replacement layout can be verified before production.

Can I replace a 750 kVA transformer with a 1000 kVA or 1500 kVA unit?

Yes, but the existing electrical system must be checked for the higher capacity. The switchboard, breakers, cables, busway, fault-current ratings, concrete pad, and utility service may all need to be reviewed before upgrading.

Recommended Capacities

Discover our full lineup of three-phase pad-mounted transformers built for projects of any scale.

View All >>

500KVA

500 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

1250KVA

1250 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

1500KVA

1500 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

2000KVA

2000 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

Precise 750 KVA Continuous Power. In Stock & Custom Engineered.

Key specifications at a glance for quick reference and confident planning.

750 kVA

Loop / Radial

ONAN

60 Hz

Outdoor Pad-Mounted

WAREHOUSE LOCATIONS

USA • Canada • UAE • China • Global Dispatch

FAST DISPATCH

Ready Stock • Ships in 1-3 Days • DDP Door-to-Door

Product Profile

The 750 kVA Three-Phase Pad-Mounted Transformer is designed for reliable medium-voltage power distribution in commercial facilities, industrial sites, data centers, and cryptocurrency mining operations. Its compact outdoor enclosure integrates the transformer, switching, and protection components into one secure unit, simplifying installation and reducing the required footprint.

The transformer can be configured with 12.47 kV or 24.94 kV primary voltage and common secondary voltages such as 480Y/277 V or 600Y/347 V. A dead-front loop-feed design, load-break switch, Bay-O-Net and current-limiting fuse protection, and multi-position tap changer can be supplied according to project requirements.

With efficient oil-immersed natural cooling, robust weather-resistant construction, and flexible electrical configurations, the 750 kVA transformer provides a dependable power solution for continuous-duty applications.

Core Advantages

01. High-Efficiency Radiators

Large external radiator panels maximize surface area for natural oil cooling, maintaining stable thermal performance during continuous 24/7 heavy-duty operations.

02. Auxiliary Control Box

Clearly organized terminals and control components simplify field wiring, commissioning, inspection, troubleshooting, and routine maintenance for faster on-site service and support.

03. Integrated Monitoring Panel

Integrated gauges provide clear temperature, pressure, and operating status information, helping technicians identify abnormal conditions quickly during routine transformer inspections and maintenance.

04. Low-Voltage Connection Panel

Clearly marked X0, X1, X2, and X3 terminals simplify low-voltage cable connections, phase identification, installation, inspection, and routine maintenance in the field.

05. High-Voltage Protection

H1, H2, and H3 terminals combine high-voltage connections with protection and voltage adjustment components, supporting safer installation, operation, inspection, and maintenance.

2250 kVA 3-Phase Padmount Transformer Cooling Control Cabinet

06. High-Dielectric Bushing Layout

Heavy-duty high-voltage bushings deliver superior electrical insulation and generous clearance, paired with a rugged steel tank built for decades of reliable service.

Full Specifications

External dimensions

W:1192mm、D:1255mm、H:1250mm

Internal dimensions

W:1142mm、D:1205mm、H:1200mm

Weight

3083KG

Rated Capacity750 kVA / 0.75 MVAPhaseThree Phase
Frequency60 HzPrimary VoltageCustomized (Typical 12.47kV / 13.8kV / 24.94kV / 34.5kV)
Secondary VoltageCustomized (Typical 480Y/277V)Winding ConfigurationDelta – Grounded Wye
Winding MaterialAluminumCooling TypeONAN
Insulation FluidMineral OilTemperature Rise65°C
Impedance5.75%Feed ConfigurationLoop Feed
Connection TypeDead FrontVector GroupProject-Specific; Dyn1 shown on 34.5kV version
Tap Changer5-Position Off-Circuit Tap ChangerTapping Range±2 × 2.5%
Efficiency99.15% / DOE-compliant configurationStandardsIEEE / CSA / DOE

Engineering Documents

Padmount Spec Sheet

Padmount Dimensional Drawings

Padmount Installation Manual

Padmount Test & Warranty Guide

Certifications & Grid Compliance

Fully compliant with UL, CSA, IEEE/ANSI, DOE, and IEC standards. Tested and certified by international authorities to ensure maximum safety, efficiency, and instant approval by local power utilities.

UL/cUL

CSA

CESI

IEEE

IEC

EN00676

AS-NZS

GOST

three phase pad mounted transformer

Infrastructure Capabilities

We supply a full lineup of pad-mount transformers built for heavy-duty power. From 24/7 crypto mining farms to mission-critical data centers, we deliver reliable equipment designed to run non-stop.

We also offer custom engineering tailored to your exact site. From specific high and low voltages to specialized enclosure specs, we customize and deliver units in as fast as 4–6 weeks to get your project powered up on schedule.

Request a Project Quote

Tell us about your project or custom requirements. Our power systems engineers will review your specs and provide a tailored proposal.

Submit Inquiry ➔

Global Project References

View All >>

750 kVA Pad-Mounted Transformers for Data Center

Dual 1000 kVA three-phase padmount units deployed to support high-density server racks and liquid-to-chip cooling infrastructure for a regional edge compute facility.

13.8 kV

480Y/277V

ONAN 750 kVA

750 kVA (0.75 MVA) Pad-Mounted Transformer for BESS Storage

Liquid-filled 750 kVA transformer supplied for a commercial battery energy storage system (BESS) integration, providing reliable bidirectional grid stepping.

750kVA

12.47 kV

480Y/277V

750 kVA Pad-Mounted Transformer for Crypto Mining Pod

Rugged 750 kVA pad-mount transformer powering hydro-cooled ASIC mining pod, delivering non-stop 415V power under extreme desert heat.

34.5 kV

415Y/240V

99.4% Efficiency

4 x 750 kVA Pad-Mounted Transformers for Industrial Grid

Four 750 kVA step-down padmount transformers installed for an advanced manufacturing plant, fully compliant with Hydro-Québec 600V distribution standards.

4 x 750 kVA

24.94 kV GrdY

600Y/347V

Capabilities & Support

24-Month Quality Warranty

Enjoy peace of mind with our 24-month full warranty. If any operational issue arises with your transformer, our dedicated engineering team will resolve it rapidly and reliably.

Local Field Service Team

Whether in North America or global regions, our certified local engineering teams provide professional on-site transformer installation, energization testing, and maintenance.

24/7 Remote Video Support

Connect directly with our senior power engineers via live video for real-time installation guidance, system diagnostics, and instant troubleshooting support, anytime and anywhere.

Spare Parts & Support

We maintain an extensive inventory of genuine spare parts for fast dispatch, paired with lifetime technical guidance to maximize your equipment uptime.

Need a Customized Power & Transformer Solution?

Talk to our engineers to get an optimized configuration and fast quote.

Contact Sales

FAQs

A 750 kVA three-phase transformer provides approximately 902A at 480V at full load. This is the key value for sizing the secondary breaker, switchboard, cables, and busway.

Yes. A 750 kVA transformer produces about 902A at 480V, so a 1200A switchboard is a practical configuration. The final breaker setting and conductor sizing should follow the project load and applicable electrical code.

Often yes, but the dimensions and cable-entry layout must be checked first. Send Apexto the existing nameplate, transformer dimensions, pad opening, and conduit locations so the replacement layout can be verified before production.

Yes, but the existing electrical system must be checked for the higher capacity. The switchboard, breakers, cables, busway, fault-current ratings, concrete pad, and utility service may all need to be reviewed before upgrading.

Recommended Capacities

Discover our full lineup of three-phase pad-mounted transformers built for projects of any scale.

View All >>

500KVA

500 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

1250KVA

1250 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

1500KVA

1500 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

2000KVA

2000 kVA Pad Mount Three-Phase Transformer

Primary Voltage2.4 kV – 34.5 kV Class
Secondary Voltage120 V – 600 V Range
AvailabilityUSA & China

Customize Your Power Solution

Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.

Project Timeline

In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.

Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.

Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.

International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.

*All sales are final and non-refundable. Please understand, this is an industry standard.

Recommended Devices