154-Slot 870kW Antminer Liquid Cooling Rack

This hydro cooling rack holds up to 154 Antminer S19, S21, or S23 Hydro miners with an 870kW cooling capacity, delivering stable and efficient performance for high-density mining deployments.

Contact us for price

In stock

Apexto is now offering U.S.-based inventory and DDP (Delivered Duty Paid) shipping for customers in the U.S. For more details, pls. contact our sales team.

Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.

Trusted by

  • Apexto Mining reviews on Trustpilot
  • WhatToMine
  • Kryptex
  • NiceHash

Payment Method

  • USD
  • USDT(TRC 20)
  • KAS
  • BTC
  • ETH
  • LTC
  • DOGE
  • USDC(ERC20)

870kW 154-Slot Antminer Liquid Cooling Rack for High-Density Indoor Mining

CONTAINER CAPACITY

ASIC MINERS

154 UNITS

Housed at full load

TOTAL POWER

870 KW

Continuous electrical load

FORM FACTOR

Custom

Standard

COOLING

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 1 more models

Product Description

The 154-Slot Antminer Hydro Cooling Rack is an industrial-grade indoor cooling solution designed for high-density, megawatt-scale crypto mining. Engineered to host up to 154 Antminer S19/S21/S23 Hydro servers, this system delivers 847kW of thermal cooling capacity within a space-efficient footprint.

Its advanced design integrates a high-capacity 630A residual current circuit breaker and a robust 15kW vertical multistage pump. These technical features maintain a steady 0.2 to 0.4 MPa pipeline pressure and ensure balanced, low-resistance fluid distribution across all active slots.

Built with a heavy-duty structural steel frame certified for global standards, the system accommodates a total circulating coolant volume of at least 1.6 cubic meters. Backed by a 380V CUL-certified frequency converter, it safeguards hardware longevity and simplifies scalable site deployment.

Core Advantages

870kW 154-Slot Antminer Bitcoin Mining Liquid Cooling Rack

01. Integrated Open-Frame System

Features a space-saving open-frame layout engineered to aggregate 154 server slots, built-in CDU, and smart central controls, facilitating rapid indoor installation for large-scale 847kW facility deployments.

Bitcoin Mining Liquid Cooling Rack

02. Heavy-Duty Quick-Connect Fittings

Utilizes factory-original quick-connect fittings and robust hoses designed to manage high flow rates and a circulating volume of over 1.6 cubic meters, ensuring stable, leak-free coolant delivery during hashing.

hydro-cooling mining farms

03. Leak-Proof CDU Piping

Features seamless, single piece stainless steel manifolds for the CDU system, eliminating any risk of welded joint leaks to ensure secure, reliable water circulation always.

870kW 154-Slot Antminer Bitcoin Mining Liquid Cooling Rack – Leak Detection

04. Leak Detection System

Equipped with a moisture-sensing immersion rope, this system detects coolant leaks and triggers instant alarms, enhancing safety and preventing potential damage in liquid-cooled mining setups.

870kW 154-Slot Antminer Bitcoin Mining Liquid Cooling Rack & Centralized Power Distribution Cabinet

05. High-Current Certified Power Cabinet

Houses an industrial power cabinet compliant with international standards, featuring a heavy-duty 630A residual current breaker (RCCB) and 125A molded case breaker (MCCB) for safe, stable electricity distribution.

870kW 154-Slot Antminer Bitcoin Mining Liquid Cooling Rack with PLC Control System

06. Intelligent Management System

Tracks real time voltage, pump VFD frequencies, and historical alarm curves on the touchscreen, allowing operators to instantly diagnose faults and manage overall power draw safely.

Full Specifications

External dimensions

L:4880mm、W:1500mm、H:2700mm

Internal dimensions

L:4880mm、W:1500mm、H:2700mm

Weight

3500KG

ModelAP-A154Installed capacity154 Seat
Installed powerload847 kWPower of the light-duty vertical multistage pump15 kW
Power of the fluid replenishing pump0.2 kWTotal power of the dry cooling tower fan41.5 kW
Total power of the closed cooling tower fan13.2 kWTotal power of the closed cooling tower spray pump3 kW
System pipeline pressure0.2-0.4 MPAOperating temperature range of the system22-42 ℃
Coolant circulation demand of a single machine≥0.5 m³/hTotal demand for circulating coolant within the system≥1.6 m³
Molded Case Circuit Breaker125 AResidual Current Circuit Breaker630 A
Contactor9 AIntermediate relay24 V
CUL certified frequency converter380 V

154-Slot Antminer Hydro Cooling Rack Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your container deployment with the appropriate transformer capacity.

1250 kVA Pad Mounted Transformer For Bitcoin Mining.jpg

For 1 × 870kW Rack

1250 kVA Three-Phase Pad-Mounted Transformer

View 1250 kVA Transformer →

2500 kVA Pad Mount Three-Phase Transformer

For 2 × 870kW Racks

2500 kVA Three-Phase Pad-Mounted Transformer

View 2500 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

28-Slot Antminer Hydro Cooling Rack

154 kW
28 Slots
1,000 × 1,000 × 2,000 mm
Customizable Modular Expansion

110-Slot Antminer Hydro Cooling Rack

620 kW
110 Slots
4880 × 1300 × 2700 mm
Standard Warehouse Deployments

Compare

154-Slot Antminer Hydro Cooling Rack

870 kW
154 Slots
4,880 × 1,500 × 2,700 mm
High-Density Industrial Projects

240-Slot Antminer Hydro Cooling Rack

1350 kW
240 Slots
6,025 × 1,500 × 2,700 mm
Mega-Scale Warehouse Facilities

154-Slot Antminer Hydro Cooling Rack FAQs

Can operators mix different generations of Antminer Hydro models, like S19 and S21, within the same rack?

Yes. The slot dimensioning and water pipe manifolds are fully standardized to accommodate mixed deployments of Antminer S19, S21, and S23 Hydro models. This allows site operators to easily upgrade individual units without modifying the rack structure or replacing any standard plumbing connections.

How does the quick connector design prevent fluid leakage during individual miner replacement or maintenance?

Our premium connector fittings feature dual self sealing quick connects. When unplugged, the male and female valves immediately seal shut on both sides, ensuring absolutely zero liquid coolant leakage during individual miner maintenance while the rest of the active rack safely continues hashing.

Is the rack shipped fully assembled, and how long does on-site deployment typically take?

The system ships pre assembled and pressure tested directly from our factory to minimize initial setup effort. On site commissioning typically takes less than one day, requiring only the standard connections of external water pipelines, main power input cables, and network switch lines.

Can multiple racks be connected in parallel to share a centralized external cooling tower system?

Yes. The standard DN100 main manifold design allows multiple racks to be easily daisy chained together in parallel. This setup permits operators to run a centralized external dry cooler or cooling tower loop, significantly simplifying plumbing layouts for large scale megawatt mining operations.

What is the recommended routine maintenance schedule for keeping this hydro rack running efficiently?

We recommend checking water conductivity monthly and inspecting the Y strainers for debris. A complete coolant replacement and system flush are typically required once a year, ensuring maximum heat transfer efficiency and protecting all internal cooling channels of your valuable mining hardware.

870kW 154-Slot Antminer Liquid Cooling Rack for High-Density Indoor Mining

CONTAINER CAPACITY

Housed at full load
154 UNITS
Continuous electrical load
870 KW

Custom

Standard

Hydro

Thermal management

POWER INPUT

380V–415V AC 50/60Hz

AVAILABILITY

Typical lead time 45 days • DDP Sea Shipping Available

⚙ Compatible Models View More ›

Show 1 more models

Product Description

The 154-Slot Antminer Hydro Cooling Rack is an industrial-grade indoor cooling solution designed for high-density, megawatt-scale crypto mining. Engineered to host up to 154 Antminer S19/S21/S23 Hydro servers, this system delivers 847kW of thermal cooling capacity within a space-efficient footprint.

Its advanced design integrates a high-capacity 630A residual current circuit breaker and a robust 15kW vertical multistage pump. These technical features maintain a steady 0.2 to 0.4 MPa pipeline pressure and ensure balanced, low-resistance fluid distribution across all active slots.

Built with a heavy-duty structural steel frame certified for global standards, the system accommodates a total circulating coolant volume of at least 1.6 cubic meters. Backed by a 380V CUL-certified frequency converter, it safeguards hardware longevity and simplifies scalable site deployment.

Core Advantages

870kW 154-Slot Antminer Bitcoin Mining Liquid Cooling Rack

01. Integrated Open-Frame System

Features a space-saving open-frame layout engineered to aggregate 154 server slots, built-in CDU, and smart central controls, facilitating rapid indoor installation for large-scale 847kW facility deployments.

Bitcoin Mining Liquid Cooling Rack

02. Heavy-Duty Quick-Connect Fittings

Utilizes factory-original quick-connect fittings and robust hoses designed to manage high flow rates and a circulating volume of over 1.6 cubic meters, ensuring stable, leak-free coolant delivery during hashing.

hydro-cooling mining farms

03. Leak-Proof CDU Piping

Features seamless, single piece stainless steel manifolds for the CDU system, eliminating any risk of welded joint leaks to ensure secure, reliable water circulation always.

870kW 154-Slot Antminer Bitcoin Mining Liquid Cooling Rack – Leak Detection

04. Leak Detection System

Equipped with a moisture-sensing immersion rope, this system detects coolant leaks and triggers instant alarms, enhancing safety and preventing potential damage in liquid-cooled mining setups.

870kW 154-Slot Antminer Bitcoin Mining Liquid Cooling Rack & Centralized Power Distribution Cabinet

05. High-Current Certified Power Cabinet

Houses an industrial power cabinet compliant with international standards, featuring a heavy-duty 630A residual current breaker (RCCB) and 125A molded case breaker (MCCB) for safe, stable electricity distribution.

870kW 154-Slot Antminer Bitcoin Mining Liquid Cooling Rack with PLC Control System

06. Intelligent Management System

Tracks real time voltage, pump VFD frequencies, and historical alarm curves on the touchscreen, allowing operators to instantly diagnose faults and manage overall power draw safely.

Full Specifications

External dimensions

L:4880mm、W:1500mm、H:2700mm

Internal dimensions

L:4880mm、W:1500mm、H:2700mm

Weight

3500KG

ModelAP-A154Installed capacity154 Seat
Installed powerload847 kWPower of the light-duty vertical multistage pump15 kW
Power of the fluid replenishing pump0.2 kWTotal power of the dry cooling tower fan41.5 kW
Total power of the closed cooling tower fan13.2 kWTotal power of the closed cooling tower spray pump3 kW
System pipeline pressure0.2-0.4 MPAOperating temperature range of the system22-42 ℃
Coolant circulation demand of a single machine≥0.5 m³/hTotal demand for circulating coolant within the system≥1.6 m³
Molded Case Circuit Breaker125 AResidual Current Circuit Breaker630 A
Contactor9 AIntermediate relay24 V
CUL certified frequency converter380 V

154-Slot Antminer Hydro Cooling Rack Product Brochure

Complete product specifications, installation guide, and operational instructions.

Certification Standards

Our products meet leading international standards for safety, reliability, and performance.

China Classification Society

Marine & offshore compliance

UL Listed

Safety tested & certified

CSA Certified

North American compliance

CE Marking

European conformity

Recommended Power Setup

Match your container deployment with the appropriate transformer capacity.

1250 kVA Pad Mounted Transformer For Bitcoin Mining.jpg

For 1 × 870kW Rack

1250 kVA Three-Phase Pad-Mounted Transformer

View 1250 kVA Transformer →

2500 kVA Pad Mount Three-Phase Transformer

For 2 × 870kW Racks

2500 kVA Three-Phase Pad-Mounted Transformer

View 2500 kVA Transformer →

Need help sizing your transformer?

Our engineers will recommend the right transformer based on your site conditions and power requirements.

Get Transformer Recommendation →

Complete Cooling Solutions

We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.

❄️ Cooling Capacity
⚙️ Miner Slots
📏 Dimensions (L × W × H)
🏢 Application

28-Slot Antminer Hydro Cooling Rack

154 kW
28 Slots
1,000 × 1,000 × 2,000 mm
Customizable Modular Expansion

110-Slot Antminer Hydro Cooling Rack

620 kW
110 Slots
4880 × 1300 × 2700 mm
Standard Warehouse Deployments

Compare

154-Slot Antminer Hydro Cooling Rack

870 kW
154 Slots
4,880 × 1,500 × 2,700 mm
High-Density Industrial Projects

240-Slot Antminer Hydro Cooling Rack

1350 kW
240 Slots
6,025 × 1,500 × 2,700 mm
Mega-Scale Warehouse Facilities

154-Slot Antminer Hydro Cooling Rack FAQs

Yes. The slot dimensioning and water pipe manifolds are fully standardized to accommodate mixed deployments of Antminer S19, S21, and S23 Hydro models. This allows site operators to easily upgrade individual units without modifying the rack structure or replacing any standard plumbing connections.

The system ships pre assembled and pressure tested directly from our factory to minimize initial setup effort. On site commissioning typically takes less than one day, requiring only the standard connections of external water pipelines, main power input cables, and network switch lines.

We recommend checking water conductivity monthly and inspecting the Y strainers for debris. A complete coolant replacement and system flush are typically required once a year, ensuring maximum heat transfer efficiency and protecting all internal cooling channels of your valuable mining hardware.

Customize Your Hydro Cooling Solution

Share your requirements below. Our consultants will contact you via WhatsApp or email within 24 hours with a custom-matched proposal.

Project Timeline

In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.

Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.

Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.

International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.

*All sales are final and non-refundable. Please understand, this is an industry standard.

Recommended Devices